Differences between revisions 1 and 2
Revision 1 as of 2019-11-01 09:47:25
Size: 1211
Editor: YoichiAso
Comment:
Revision 2 as of 2019-11-01 10:19:03
Size: 1488
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
=== OMMT & OSTM === === OMMT & OSTM (Takahashi) ===
Line 28: Line 28:
 * M2052 bars for OMC are under ECB process.
Line 29: Line 30:
 * Assembly and test of the OSTM suspension.
 * The mirror will be ready with the first contact.
Line 40: Line 43:
 * Time slots in the next F2F meeting: Request two slots (commissioning by Okutomi and future plan by Takahashi)
Line 43: Line 47:
  * Takahashi:
  * Sato:
  * Takahashi: 5-7
  * Sato: 5-7

Agenda/Minutes of the VIS Meeting on 2019/11/1

2019/11/1 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM (Takahashi)

Past week report

  • M2052 bars for OMC are under ECB process.

Plan for coming weeks

  • Assembly and test of the OSTM suspension.
  • The mirror will be ready with the first contact.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • Time slots in the next F2F meeting: Request two slots (commissioning by Okutomi and future plan by Takahashi)

Travel Plans

  • Travel (Week of 11/4):
    • Takahashi: 5-7
    • Sato: 5-7
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 11/11):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/11/8(Fri)