Differences between revisions 2 and 3
Revision 2 as of 2019-11-20 16:05:26
Size: 1404
Comment:
Revision 3 as of 2019-11-21 08:40:51
Size: 1439
Comment:
Deletions are marked like this. Additions are marked like this.
Line 35: Line 35:
 * New control scheme (Terrence).

Agenda/Minutes of the VIS Meeting on 2019/11/22

2019/11/22 14:00 -

Zoom Meeting

Participants:

VIS Commissioning Task List

Post-O3 task list Procurement list in 2019FY

Progress report

Type-A

Past week report

Plan for coming weeks

Type B

Past week report

Plan for coming weeks

  • Disassembly of the mirror hanging jig.

Type-Bp

Past week report

Plan for coming weeks

OMMT & OSTM

Past week report

Plan for coming weeks

  • Check the DGS for the control of OSTM suspension.

VIS electronics

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:

Discussion

  • New control scheme (Terrence).

Travel Plans

  • Travel (Week of 11/25):
    • Takahashi: 27-28
    • Sato:
    • Hirata: 27-28
    • Shoda:
    • Fujii:
    • Tanaka:
  • Travel (Week of 12/2):
    • Takahashi:
    • Sato:
    • Hirata:
    • Shoda:
    • Fujii:
    • Tanaka:

Next meeting

On 2019/11/29(Fri)

KAGRA/Subgroups/VIS/VISMinutes20191122 (last edited 2019-11-22 17:50:45 by RyutaroTakahashi)