= Agenda/Minutes of the VIS Meeting on 2020/3/13 = 2020/3/13 14:00 - [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Takahashi, Sato, Ishizaki, Hirata, Shoda, Fujii, Fabian, Lucia, Tanaka [[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--AlK26n6oP8QHU_XUQriwv2PvAg-RKcNXfMFrqOtTAPU48qQf|VIS Commissioning Task List]] [[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Post-O3 task list]] [[https://www.dropbox.com/s/9l1h0fw9kc1pzmm/Proocurement%202019FY.xlsx?dl=0|Procurement list in 2019FY]] [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Schedule afetr O3]] == Progress report == === Type-A === ==== Past week report ==== * Sensor correction calibration of ITMY was wrong. IFO Feedback signal on the TM was reduced by about 5 times after the calibration factor was fixed. ==== Plan for coming weeks ==== === Type B === ==== Past week report ==== * I wrote a document with guidelines for the design the oplev boxes: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11540|JGW-E2011540-v1]]. * It's intended for Mirapro. * Some information still needs to be included. * Please give me feedback in case you feel like. * A 3D-CAD is included. * I measured transfer functions from some BS DoF to DARM: klog entries [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13463|13463]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13477|13477]]. * Projections of noise onto DARM not done yet. ==== Plan for coming weeks ==== === Type-Bp === ==== Past week report ==== * Yokozawa-san and Fabian measured the TF from PRs to DARM. --> Noise projection on noisebudgetter. * PR2 and PR3 oplev went away due to the large earthquake. ==== Plan for coming weeks ==== === Type-C === ==== Past week report ==== ==== Plan for coming weeks ==== === VIS electronics === ==== Past week report ==== * Measured the TF of AD630 with grounded #14 pin. 30dB reduction was achived. ==== Plan for coming weeks ==== * Design of the filters to obtain 100dB reduction at 10Hz. == Safety == == Discussion == * ACC development: Response of the geophone is not flat at the low frequency. Improved ACCs have advantage. == Travel Plans == * Travel (Week of 3/16): * Takahashi: 16-18 * Sato: 17-18 (Kashiwa) * Hirata: * Shoda: * Fujii: * Tanaka: * Travel (Week of 3/23): * Takahashi: * Sato: 23-25 (Shift) * Hirata: 24-26 (Shift) * Shoda: 22-24 (Shift) * Fujii: * Tanaka: == Next meeting == On 2020/3/27(Fri)