Differences between revisions 1 and 9 (spanning 8 versions)
Revision 1 as of 2020-05-21 09:15:24
Size: 1146
Comment:
Revision 9 as of 2020-05-22 15:35:26
Size: 660
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2020/5/22 14:00 - 2020/5/22 14:00 - 15:20
Line 6: Line 6:
Participants: Participants: Takahashi, Hirata, Fabian, Miyo, Sato, Shoda, Aso, Lucia, Tanaka
Line 8: Line 8:
[[https://onedrive.live.com/view.aspx?resid=8E8081C20FE5EC3A!2278&ithint=file,xlsx&authkey=!AMFNtNa-Y6CVp94|Task list towards O4]] [[https://www.dropbox.com/s/60oygtwmckmdyj6/Towards%20O4%20on%20VIS%20.xlsx?dl=0|Task list towards O4]]
Line 16: Line 16:
=== Type-Bp ===
=== Type-C ===
=== Controls ===
=== Electronics ===

== Post O3 ==
 * KAGRA is in the suspended mode until 31st May.
 * Only measurements, which can be done remotely, are available ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]).
 * O3c is still under discussion between LVK ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]).

== Safety ==
== Discussion ==
 * Submission to JPS/ASJ Meeting.
== Travel Plans ==
== Next meeting ==
 * On 2020/5/29(Fri)
 * After a verbal report from Lucia last week I checked the condition of SR2: the control system couldn't bring the IP to its set point (klog entry [[http://klog.icr

Agenda/Minutes of the VIS Meeting on 2020/5/22

2020/5/22 14:00 - 15:20

Zoom Meeting

Participants: Takahashi, Hirata, Fabian, Miyo, Sato, Shoda, Aso, Lucia, Tanaka

Task list towards O4

Schedule afetr O3

Progress report

General

Type-A

Type-B

  • After a verbal report from Lucia last week I checked the condition of SR2: the control system couldn't bring the IP to its set point (klog entry [[http://klog.icr

KAGRA/Subgroups/VIS/VISMinutes20200522 (last edited 2020-05-22 15:58:44 by RyutaroTakahashi)