2020/5/22 14:00 -  2020/5/22 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 16: Line 16:
 * After a verbal report from Lucia last week I checked the condition of SR2: the control system couldn't bring the IP to its set point (klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14381|14381]]).
  * On Monday Lucia and I came to the site.
  * We realized coil-magnet actuation didn't move the IP but horizontal fishing rods did, so we suspected the electronics or cabling.
  * With Yamamoto-kun we went to the tunnel and realized the HPCD had broken down (entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14394|14394]]).
  * Thanks to Tomura-san's quick reaction we got a new HPCD and recovered the IP and the suspension (entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14395|14395]]).
  * I don't know what's the origin of the failure. It wasn't an actuation overload due to an earthquke because there was no earthquake (entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14407|14407]]).
  * A similar event happened to the BS IP on the 5th of May (entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14404|14404]]).
Line 20: Line 28:

Agenda/Minutes of the VIS Meeting on 2020/5/22

2020/5/22 14:00 -

Zoom Meeting

Participants:

Task list towards O4

Schedule afetr O3

Progress report

General

Type-A

Type-B

  • After a verbal report from Lucia last week I checked the condition of SR2: the control system couldn't bring the IP to its set point (klog entry 14381).

    • On Monday Lucia and I came to the site.
    • We realized coil-magnet actuation didn't move the IP but horizontal fishing rods did, so we suspected the electronics or cabling.
    • With Yamamoto-kun we went to the tunnel and realized the HPCD had broken down (entry 14394).

    • Thanks to Tomura-san's quick reaction we got a new HPCD and recovered the IP and the suspension (entry 14395).

    • I don't know what's the origin of the failure. It wasn't an actuation overload due to an earthquke because there was no earthquake (entry 14407).

    • A similar event happened to the BS IP on the 5th of May (entry 14404).

Type-Bp

Type-C

Controls

Electronics

Post O3

  • KAGRA is in the suspended mode until 31st May.
  • Only measurements, which can be done remotely, are available (Request).

  • O3c is still under discussion between LVK (Plan, Sheet).

  • The site work towards O4 will be started from July at earliest.

Safety

Discussion

  • Submission to JPS/ASJ Meeting.
    • JPS Meeting: 14-17 Sep. Online, Deadline: 4 Jun.
    • ASJ Meeting: 8-10 Sep. Online, Deadline: 9 Jun.

Travel Plans

Next meeting

  • On 2020/5/29(Fri)