Line 21: Line 21:
 * KAGRA is still in the suspended mode. Only remote measurements were available until May 31st (Q-measurement by Fabian).  * KAGRA is still in the suspended mode. Only remote measurements are available until May 31st (Q-measurement by Fabian).
Line 23: Line 23:
 * Decision for O3c in Virgo will be done within two weeks (from EO). If O3c was decided, tasks for O3c will be available as well (e.g. Sensor correction for SRs).
 * Post-Obs. task has priority higher than task for O3c. Two weeks in June is assigned for the PO tasks at least.
 * Decision for O3c in Virgo will be done within two weeks (from EO). If O3c was decided, task for O3c will be available as well (e.g. Sensor correction for SRs).
 * Post Obs. task has priority higher than task for O3c. Two weeks, at least, in June is assigned for the Post Obs. task.
Line 26: Line 26:
 * Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]),
Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]).
 * Post Obs. task ([[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|Request]]), Task for O3c ([[https://paper.dropbox.com/doc/Plan-for-the-long-OR-brake--AxxlJFvK1IGJjqrG5nfdHfGXAQ-KqexeqMaCA7DITFGxA5ih|Plan]], [[https://www.dropbox.com/s/hoadb73fdyah02c/Post-O3%20task.xlsx?dl=0|Sheet]]).

Agenda/Minutes of the VIS Meeting on 2020/5/29

2020/5/29 14:00 -

Zoom Meeting

Participants:

Task list towards O4

Schedule afetr O3

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Post O3

  • KAGRA is still in the suspended mode. Only remote measurements are available until May 31st (Q-measurement by Fabian).
  • More activities in the control room and the site will be available from June 1st (Type-A measurement by Lucia).
  • Decision for O3c in Virgo will be done within two weeks (from EO). If O3c was decided, task for O3c will be available as well (e.g. Sensor correction for SRs).
  • Post Obs. task has priority higher than task for O3c. Two weeks, at least, in June is assigned for the Post Obs. task.
  • The site work towards O4 will be rescheduled.
  • Post Obs. task (Request), Task for O3c (Plan, Sheet).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/5(Fri)