Agenda/Minutes of the VIS Meeting on 2020/5/29

2020/5/29 14:00 -

Zoom Meeting

Participants:

Task list towards O4

Schedule afetr O3

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Post O3

  • KAGRA is still in the suspended mode. Only remote measurements are available until May 31st (Q-measurement by Fabian).
  • More activities in the control room and the site will be available from June 1st (Type-A measurement by Lucia).
  • Decision for O3c in Virgo will be done within two weeks (from EO). If O3c was decided, task for O3c will be available as well (e.g. Sensor correction for SRs).
  • Post Obs. task has priority higher than task for O3c. Two weeks, at least, in June will be assigned for Post Obs. task.
  • The site work towards O4 will be rescheduled.
  • Post Obs. task (Request), Task for O3c (Plan, Sheet).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/6/5(Fri)