* I worked in the measurements of the decay times of SR2. I still have to analyze data. No results to show yet. * Washimi-san reported the feedback signal in SRM F0 was too high. I offloaded onto the fishing rod this morning (klog entry [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14436|14436]]). According to the [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/OpsManual/FishingRods|VIS wilki fishing rod page]], this fishing rod does not suffer of any known problems. * I will postpone asking questions about inertial damping again for next week. |
|
Line 22: | Line 26: |
* More activities in the control room and the site will be available from June 1st (Noise budget by Ushiba). | * More activities in the control room and the site will be available from June 1st (Noise budget by Ushiba). |
Line 41: | Line 45: |
* Type-B/Bp team: Shoda(supervisor), Hirata, Fabian, Terrence, Washimi, company person | * Type-B/Bp team: Shoda(supervisor), Hirata, Fabian, Terrence, Washimi, company person |
Agenda/Minutes of the VIS Meeting on 2020/5/29
2020/5/29 14:00 -
Participants:
Progress report
General
Type-A
Type-B
- I worked in the measurements of the decay times of SR2. I still have to analyze data. No results to show yet.
Washimi-san reported the feedback signal in SRM F0 was too high. I offloaded onto the fishing rod this morning (klog entry 14436). According to the VIS wilki fishing rod page, this fishing rod does not suffer of any known problems.
- I will postpone asking questions about inertial damping again for next week.
Type-Bp
Type-C
Controls
Electronics
Post O3
- KAGRA is still in the suspended mode. Only remote measurements are available until May 31st (Q-measurement by Fabian, Type-A measurement by Lucia).
- More activities in the control room and the site will be available from June 1st (Noise budget by Ushiba).
- Decision for O3c in Virgo will be done within two weeks (from EO). If O3c was decided, task for O3c will be available as well (e.g. Sensor correction for SRs).
- Post Obs. task has priority higher than task for O3c. Two weeks, at least, in June will be assigned for Post Obs. task.
- The site work towards O4 will be rescheduled.
Post Obs. task (Request), Task for O3c (Plan, Sheet).
Safety
Discussion
- Papers
- Mechanics of Type-A tower + Cryo-payload: Shoda (on going)
- Performance of Type-A: Lucia
- Control of Type-A: Lucia?
- Control (Sensor correction): Fujii
- Type-B: Fabian (on going)
- Personnel towards O4
- Takahashi supervises both teams.
- Type-A team: Sato, Miyo, Takahashi, company person
- Type-B/Bp team: Shoda(supervisor), Hirata, Fabian, Terrence, Washimi, company person
Travel Plans
Next meeting
- On 2020/6/5(Fri)