Line 2: Line 2:
2020/6/26 14:00 -  2020/6/26 14:00 -
Line 6: Line 6:
Participants:  Participants:
Line 10: Line 10:
 * I started to prepare the heater jackets for temperature control of GAS. This project doesn't have a time schedule. We have to discuss. [[https://github.com/gw-vis/kagra-vis/issues/20| (Github Issue)]]  * I started to prepare the heater jackets for temperature control of GAS. This project doesn't have a time schedule. We have to discuss. [[https://github.com/gw-vis/kagra-vis/issues/20|(Github Issue)]]
  * We should decide which suspensions will require the heaters.
Line 13: Line 15:
Line 18: Line 21:

Agenda/Minutes of the VIS Meeting on 2020/6/26

2020/6/26 14:00 -

Zoom Meeting

Participants:

Progress report

General

  • I started to prepare the heater jackets for temperature control of GAS. This project doesn't have a time schedule. We have to discuss. (Github Issue)

    • We should decide which suspensions will require the heaters.

Type-A

  • (Takahashi) Tested the accelerometer with the LVDT prototype (Slide).

Type-B

Type-Bp

Type-C

Controls

Electronics

Post O3

  • Post Obs. tasks are on going. Decay time measurements were carried out again. RT model modification for other Type-Bs is planed in this weekend. Sensor correction for SRs and SR suspension update will be started from July.
  • O3c will be canceled.
  • Task towards O4 (List) was revised.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Schedule towards O4 (Chart).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/7/3(Fri)