Differences between revisions 18 and 19
Revision 18 as of 2020-07-31 13:49:09
Size: 3638
Editor: KousekiMiyo
Comment:
Revision 19 as of 2020-07-31 13:49:46
Size: 3645
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
 * Offload the ITMX_GAS_F1,2 [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14820|klog#14820]]  * [Miyo] Offload the ITMX_GAS_F1,2 [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14820|klog#14820]]

Agenda/Minutes of the VIS Meeting on 2020/7/31

2020/7/31 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

  • The accelerometer with LVDT was tested at the site (klog).

    • The ACC was set on the floor of IYV area. The folded pendulum was tuned to 0.24Hz. The servo loop was configured by Miyo-san using KAGRA digital system.
    • When we finished the final setting on Wednesday afternoon, the large earthquake (M7.8) was happened at Aleutian islands. So Miyo-san measured and evaluated the spectrum later.
  • [Miyo] Offload the ITMX_GAS_F1,2 klog#14820

Type-B

  • Paper: I finished writing. I'm waiting for Enzo's comments to submit to CPC and share it with the rest of VIS people.

Type-Bp

Type-C

Controls

Electronics

Towards O4

  • KAGRA is in "Upgrade phase for O4". Upgrade of SR controls were performed. The accelerometer with LVDT was tested at the site.
  • Plan for cleaning the clean booth (EN, JP) will be submitted by 3rd. Aug. It is necessary to make the inventory with location (example for Type-A).

    • [Washimi] PEM team introduce the Holobuilder (Google street view like tool). Let's discuss about cleanup plan with this tool.

  • Preparation work (pre-cleaning) will be started from 17th Sep. Cleaning schedule.png.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List), Schedule towards O4 (Chart).

Safety

  • [Washimi] Room temperature and GAS status https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/fig_GAS/

    • The temperature in mine dropped during July 9th - July 19th (-0.8degC). We couldn't find this until July 22th due to the trouble and maintenance of the network.
    • We added 2 heaters on July 28th.

Discussion

Travel Plans

Next meeting

  • On 2020/8/7(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200731 (last edited 2020-07-31 15:40:25 by RyutaroTakahashi)