Differences between revisions 6 and 7
Revision 6 as of 2020-07-31 09:19:19
Size: 1882
Comment:
Revision 7 as of 2020-07-31 09:58:11
Size: 2643
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 * [Miyo] by 07/31/2020, 20% done (+0%), [[Make a cabling diagram for O4|https://github.com/gw-vis/kagra-vis/issues/13]]
 * [Miyo] by 08/28/2020, 25% done (+0%), [[Make prototype system for temperature control|https://github.com/gw-vis/kagra-vis/issues/20]]
 * [Miyo] by 08/28/2020, 20% done (+0%), [[Enable to control the limit switch of stepper motor|https://github.com/gw-vis/kagra-vis/issues/22]]
 * [Miyo] by 08/28/2020, 0% done (+0%), [[Request AEL chassis for picomotor driver|https://github.com/gw-vis/kagra-vis/issues/xx]]
 * [Miyo] by 08/28/2020, 0% done (+0%), [[Update remote control system|https://github.com/gw-vis/kagra-vis/issues/xx]]
 * [Miyo] by 08/28/2020, 0% done (+0%), [[Add CRYO stepper motor in the remote control system|xx]]

Agenda/Minutes of the VIS Meeting on 2020/7/31

2020/7/31 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

  • The accelerometer with LVDT was tested at the site (report).

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

  • KAGRA is in "Upgrade phase for O4". Upgrade of SR controls were performed. The accelerometer with LVDT was tested at the site.
  • Plan for cleaning the clean booth (EN, JP) will be submitted by 3rd. Aug. Preparation work (pre-cleaning) will be started from 17th Sep.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List), Schedule towards O4 (Chart).

Safety

Discussion

  • [Washimi] PEM team introduce the Holobuilder (Google street view like tool). Let's discuss about cleanup plan with this tool.

Travel Plans

Next meeting

  • On 2020/8/7(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200731 (last edited 2020-07-31 15:40:25 by RyutaroTakahashi)