Agenda/Minutes of the VIS Meeting on 2020/9/18
2020/9/18 13:30 -
Participants:
Interface between VIS and CRY
- Interface meeting was set to discuss about the integrated CAD model, the link between Cryo-payload and Type-A tower, the schedule, and so on. Mainly in Japanese for the engineers.
- VIS team plan to test the ribbon heater on the cross tube in IX or IY just before the vent of chambers.
Acceptance Test (Wiki page, Inspection document style).
Progress report
General
Type-A
Type B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- KAGRA is in "RSE Trial" now.
- Procedure documents.
- Preparation work.
- The preparation work will be started on Oct. 1st.
When you make inventories, indicate the segment name.
- Schedule towards O4.
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)
Safety
Discussion
Travel Plans
The week from 9/28
- Takahashi: 9/30-10/2
- Sato: 9/30-10/2
- Hirata: 9/30-10/2
The week from 10/5
- Takahashi: 10/5-9
- Sato: 10/5-9
- Hirata: 10/5-9
Next meeting
- On 2020/9/25(Fri)