Differences between revisions 5 and 6
Revision 5 as of 2020-11-26 14:49:01
Size: 1955
Comment:
Revision 6 as of 2020-11-26 19:43:18
Size: 2272
Comment:
Deletions are marked like this. Additions are marked like this.
Line 47: Line 47:
[Terrence] I would like to know the availability of the Type-B (or even Type-A) suspensions. I will be actively working on testing my methods on sensor corrections, complementary filters, and control optimization. I am also writing a paper on complementary filters so I will be collecting data from the suspensions.

Agenda/Minutes on 2020/11/27

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

  • Post O3 Upgrade portal

  • Leak test of EYC.
  • Evacuation of IYC.
  • Jig for the FC painting.
  • The connection/disconnection schedule.
    • Disconnection: ITMY by 2/26
    • Connection: ITMX after 3/2, ITMY after 3/30, ETMX after 1/12, ETMY after 5/4
  • PF actuator: Measurement of coefficients --> calculation of the noise (by mid Dec.).

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

[Terrence] I would like to know the availability of the Type-B (or even Type-A) suspensions. I will be actively working on testing my methods on sensor corrections, complementary filters, and control optimization. I am also writing a paper on complementary filters so I will be collecting data from the suspensions.

Travel Plans

The week from 11/30

  • Takahashi: 11/30-12/4
  • Hirata: 11/30-12/4
  • Sato: ?

The week from 12/7

  • Takahashi: 12/7-11
  • Hirata: 12/7-11

Next meeting

  • On 2020/12/4(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201127 (last edited 2020-11-28 15:17:30 by RyutaroTakahashi)