Differences between revisions 1 and 2
Revision 1 as of 2021-01-07 21:07:30
Size: 2262
Comment:
Revision 2 as of 2021-01-08 13:52:15
Size: 3950
Comment:
Deletions are marked like this. Additions are marked like this.
Line 31: Line 31:
  * Assembled the geophones into the pods.    * Assembled the geophones into the pods.
Line 34: Line 34:
== Type-B ==
Albums

 * [[https://photos.app.goo.gl/YiRfy6a9uDf4rvcKA|BS remedying work after O3]]
 * [[https://photos.app.goo.gl/4cvWnXCdCsf9WiYf7|SR2 remedying work after O3]]
 * [[https://photos.app.goo.gl/X2eaBxsZGaRHYAQK6|SR3 remedying work after O3]]
 * [[https://photos.app.goo.gl/6C5tGpn7CLgGUG9y6|SRM remedying work after O3]]

Week of the 4th of January

SR3

 * In order to answer the question whether we should move the assembly frame next to SR3 as a back up plan,
  * We opened SRM chamber -X door, next to where the frame is now and
  * We measured the width of the clear space: 66 cm, which is enough.
  * We should ask Mirapro to move the frame, but
  * We need to move the rack with electronics and the cables and we need to allocate time to do it.
 * The IP stepper motor shaft pitch was measured to be 1.0 mm/thread.

BS

 * The IP stepper motor shaft pitch was measured to be 0.8 mm/thread.
 * We received special screws, we installed the IP LVDTs and calibrated them: I have not checked the data but we might need to optimize the LVDT cards and repeat the calibration. I need to think about this issue more carefully.
 * Before removing IP immobilizing jig we measured the output of the LVDTs in order to recover the aligned position.
 * We replaced the heavy F0 top plate of the keystone assembly by a lighter one with ballast mass.
 * We installed the F0 yaw stepper motor with limit switches. Test pending.
 * We installed the F0 fishing rod limit switches. Test pending.

Type-B all

We checked the flanges we could use for the cables of a thermistor. See details in klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15700|15700]].
Line 38: Line 70:

Agenda/Minutes on 2021/1/8

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

Post O3 Upgrade portal

  • Schedule for IX: Connection of ITMX is scheduled in the week of 2/8.
  • Schedule for IY: Cooling of payload is scheduled from 1/12.
  • Corrugate tube fixing jig: Re-measurement in IYV is planed.
  • Commissioning in vacuum:
  • Acceptance check items:
  • Jig for FC painting:
  • PF actuator:

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

  • Remedy work in IXV.
    • Replaced three blades for TF.
    • Mounted the ballast weight on the top plate of TF keystone.
    • Assembled and tested the limit switches for the yaw and vertical FR.
    • Assembled the geophones into the pods.

Type-B

Type-B

Albums

Week of the 4th of January

SR3

  • In order to answer the question whether we should move the assembly frame next to SR3 as a back up plan,
    • We opened SRM chamber -X door, next to where the frame is now and
    • We measured the width of the clear space: 66 cm, which is enough.
    • We should ask Mirapro to move the frame, but
    • We need to move the rack with electronics and the cables and we need to allocate time to do it.
  • The IP stepper motor shaft pitch was measured to be 1.0 mm/thread.

BS

  • The IP stepper motor shaft pitch was measured to be 0.8 mm/thread.
  • We received special screws, we installed the IP LVDTs and calibrated them: I have not checked the data but we might need to optimize the LVDT cards and repeat the calibration. I need to think about this issue more carefully.
  • Before removing IP immobilizing jig we measured the output of the LVDTs in order to recover the aligned position.
  • We replaced the heavy F0 top plate of the keystone assembly by a lighter one with ballast mass.
  • We installed the F0 yaw stepper motor with limit switches. Test pending.
  • We installed the F0 fishing rod limit switches. Test pending.

Type-B all

We checked the flanges we could use for the cables of a thermistor. See details in klog 15700.

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 1/11

  • Takahashi: ?
  • Sato: ?
  • Hirata: ?
  • Yano: ?

Next meeting

  • On 2020/1/15(Fri)

KAGRA/Subgroups/VIS/VISMinutes20210108 (last edited 2021-01-11 15:24:21 by RyutaroTakahashi)