Line 14: Line 14:
 * Corrugate tube fixing jig: Re-measurement in IYV is planed.  * Corrugate tube fixing jig: Re-measurement at the beginning of March in IYV is planed.

Agenda/Minutes on 2021/1/8

Zoom Meeting

CRY+VIS Interface Meeting

13:30-13:55

Participants: Takahashi, Hirata, Sato, Yano, Aso, Miyo, Ushiba, Tomaru, Ikeda, Kimura, Hagiwara

Post O3 Upgrade portal

  • Schedule for IX: Connection of ITMX was scheduled on 2/9.
  • Schedule for IY: Cooling of payload is scheduled from 1/12.
  • Schedule for EX: Let's discuss in the next time.
  • Corrugate tube fixing jig: Re-measurement at the beginning of March in IYV is planed.
  • Commissioning in vacuum:
  • Acceptance check items:
  • Jig for FC painting: Under manufacturing.
  • PF actuator: by the end of January.

VIS Meeting

14:00-15:00

Participants: Takahashi, Tanaka, Fabian, Sato, Hirata, Aso, Miyo, Washimi

Progress report

General

Type-A

  • Remedy work in IXV.
    • Replaced three blades for TF.
    • Mounted the ballast weight on the top plate of TF keystone.
    • Assembled and tested the limit switches for the yaw and vertical FR.
    • Assembled the geophones into the pods.

Type-B

Albums

Week of the 4th of January

SR3

  • In order to answer the question whether we should move the assembly frame next to SR3 as a back up plan,
    • We opened SRM chamber -X door, next to where the frame is now and
    • We measured the width of the clear space: 66 cm, which is enough.
    • We should ask Mirapro to move the frame, but
    • We need to move the rack with electronics and the cables and we need to allocate time to do it.
  • The IP stepper motor shaft pitch was measured to be 1.0 mm/thread.

BS

  • The IP stepper motor shaft pitch was measured to be 0.8 mm/thread.
  • We received special screws, we installed the IP LVDTs and calibrated them: I have not checked the data but we might need to optimize the LVDT cards and repeat the calibration. I need to think about this issue more carefully.
  • Before removing IP immobilizing jig we measured the output of the LVDTs in order to recover the aligned position.
  • We replaced the heavy F0 top plate of the keystone assembly by a lighter one with ballast mass.
  • We installed the F0 yaw stepper motor with limit switches. Test pending.
  • We installed the F0 fishing rod limit switches. Test pending.

Type-B all

We checked the flanges we could use for the cables of a thermistor. See details in klog 15700.

Type-Bp

  • If travel for Kamioka was limited, remedy work in PR3 would be postponed to February.

Type-C

Controls

Electronics

  • Made the ver.2 LVDT combiner circuit. Preliminary result showed enough attenuation. The circuit board will be sent to Kamioka in the next week.

Towards O4

Safety

Discussion

Travel Plans

The week from 1/11

  • Takahashi: -1/15
  • Sato: -1/15
  • Hirata: -1/15
  • Yano: -1/15

The week from 1/18

  • Takahashi: ?
  • Sato: 1/18-22
  • Hirata: ?
  • Yano: 1/18-22