Differences between revisions 8 and 20 (spanning 12 versions)
Revision 8 as of 2021-07-30 10:53:28
Size: 5610
Comment:
Revision 20 as of 2021-07-31 14:16:45
Size: 7528
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Date: 2021/7/30 13:00- Date: 2021/7/30 13:00-13:50
Line 10: Line 10:
Participants: Participants: Takahashi, Ikeda, Kimura, Sato, Ushiba, Tomaru, Aso, Yokozawa, Hirata, Miyo, Node
Line 15: Line 15:
 * IX: In finalization.  * IX: In finalization. Problem on cables (unbalance, coupling?).
Line 17: Line 17:
 * IY: Range of BF damper (+/-10mm) doesn't reduce the adjustable range by FRs ([[https://www.dropbox.com/s/a8p7m6luxz6ndwn/Height%20range%20rev.pdf?dl=0|Height range]]). The height adjustment was scheduled in this week.
 * EY: The mirror was shipped to Kamioka. Schedule of installation?
 * IY: Range of BF damper (+/-10mm) doesn't reduce the adjustable range by FRs ([[https://www.dropbox.com/s/a8p7m6luxz6ndwn/Height%20range%20rev.pdf?dl=0|Height range]], [[https://www.dropbox.com/s/1xek99k96jddo6z/BFdamperV.png?dl=0|BF damper]]). The height adjustment will be scheduled after vacation.
 * EY: The mirror was transported to Kamioka. FC was extended to the magnet. Regluing might be needed. Installation will be started in the next week.
Line 23: Line 23:
 * Commissioning in air: on going in X-arm. Oplev calibration is necessary.  * Commissioning in air: on going in X-arm. Oplev calibration in IX will be finished on 8/2. That in EX will be done after the CAL alignment.
Line 27: Line 27:
 * PF actuator: After SC.  * PF actuator: At the in-vacuum commissioning.
Line 31: Line 31:
 * Operators to ALIGN the suspensions are necessary.
Line 33: Line 35:
14:00- 14:00-14:30
Line 35: Line 37:
Participants: Participants: Takahashi, Hirata, Miyo, Sato, Fabian, Ishizaki, Sugiyama, Aso, Tanaka, Terrence
Line 39: Line 41:
Line 40: Line 43:
Line 41: Line 45:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17540|17540]] EX is available again , __kouseki.miyo__ 
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17540|17540]] EX is available again , __kouseki.miyo__
Line 43: Line 48:
Line 44: Line 50:
Line 46: Line 53:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17369|17369]] Added EPICS channel for VIS temperature adjustment , __satoru.ikeda__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17369|17369]] Added EPICS channel for VIS temperature adjustment , __satoru.ikeda__
Line 48: Line 55:
Line 49: Line 57:
Line 52: Line 61:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17481|17481]] ITMX MNH1 cable repairement , __takafumi.ushiba__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17481|17481]] ITMX MNH1 cable repairement , __takafumi.ushiba__
Line 56: Line 65:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17588|17588]] MN OpLev alignment for ITMX , __takafumi.ushiba__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17588|17588]] MN OpLev alignment for ITMX , __takafumi.ushiba__
Line 58: Line 67:
Line 59: Line 69:
Line 61: Line 72:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17406|17406]] Setup of pre-isolator , __ryutaro.takahashi__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17406|17406]] Setup of pre-isolator , __ryutaro.takahashi__
Line 63: Line 74:
Line 64: Line 76:
Line 65: Line 78:
Line 66: Line 80:
Line 68: Line 83:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17549|17549]] Oplev hardware , __fabian.arellano__   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=17549|17549]] Oplev hardware , __fabian.arellano__
Line 73: Line 88:
Line 84: Line 98:
SR3

 * We measured the height of the optical table and balanced it to make it horizontal.
  * We used the laser level and measured the height at each suspension point with respect to the vertical centre of the flange.
  * We redistributed the ballast mass on top to make it horizontal.
  * The table is about 1 mm above the nominal value of 380 mm.
  * The amount of ballast mass on top is 13.84 kg.
 * We examined the cleanliness of the mirror with the new super ultra bright LED flashlight:
  * It looks very clean!
  * There a very few dust particles far away from the centre, so they're not a problem.

BS

For the O3GK paper, I revisited the calculation of the effect of DAC and coil driver noise on DARM. Because no one measured the transfer function from individual coils to DARM we cannot propagate the noise directly. However, it is possibler to calculate upper limits using the transfer functions from L, P and Y of the mirrors.
Line 85: Line 114:
 * PR2: Hirata-san and Yano-san confirmed the optical table is 10 mm lower than nominal.
 * PR3: They measured the height of the optical table.
 * PR3: When testing Guardian, Miyo-kun shook the mirror accidentally and it moved -3 mrad in pitch. Fortunately, it was possible to recover it with the picomotor.
Line 88: Line 121:
 * Updated on Oplev.
Line 91: Line 126:
 * Type-A team: ACC preparation, Recovery of cables.
 * Type-B team:
 * Type-A team: ACC preparation.
 * Type-B team: Table height measurement in PRM/BS. OSEM offload in PR3.
Line 111: Line 146:
 * Power leakage on 7/30.
Line 112: Line 149:
Line 120: Line 156:
 * Ishizaki: 8/6-9? (Shift)  * Ishizaki: 8/6-9 (Shift) -->canceled

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/7/30 13:00-13:50

Participants: Takahashi, Ikeda, Kimura, Sato, Ushiba, Tomaru, Aso, Yokozawa, Hirata, Miyo, Node

Post O3 Upgrade portal

Schedule

  • IX: In finalization. Problem on cables (unbalance, coupling?).
  • EX: In finalization. Cable (P7-3 pin#2) should be recovered.
  • IY: Range of BF damper (+/-10mm) doesn't reduce the adjustable range by FRs (Height range, BF damper). The height adjustment will be scheduled after vacation.

  • EY: The mirror was transported to Kamioka. FC was extended to the magnet. Regluing might be needed. Installation will be started in the next week.

Status

  • Corrugate tube fixing jig: Remained jigs were replaced in EY on 7/29.
  • TM height setting: ITMY.
  • Commissioning in air: on going in X-arm. Oplev calibration in IX will be finished on 8/2. That in EX will be done after the CAL alignment.
  • Commissioning in vacuum:
  • Overall commissioning:
  • Acceptance check: Every Friday.
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: GVs were implemented on 7/28-29.

Discussion

  • Operators to ALIGN the suspensions are necessary.


VIS Meeting

14:00-14:30

Participants: Takahashi, Hirata, Miyo, Sato, Fabian, Ishizaki, Sugiyama, Aso, Tanaka, Terrence

Klog

BS

  • (!) 17598 Re-cabling Dsub-15 pin for BS oplev , takaaki.yokozawa

EX

  • 17540 EX is available again , kouseki.miyo

    • 17555 Comment , kouseki.miyo

General

  • 17573 Suspension status after M4 earthquake in Hida , kouseki.miyo

  • 17582 Add [PICO] and [PICO OVERVIEW] menu to [sitemap]-[PICO] menu. , satoru.ikeda

  • 17369 Added EPICS channel for VIS temperature adjustment , satoru.ikeda

    • 17553 Comment , satoru.ikeda

IX

  • 17580 Alignment check of ITMX after the earthquake , takafumi.ushiba

  • 17588 MN OpLev alignment for ITMX , takafumi.ushiba

  • (!) 17608 Setup of limit switches , ryutaro.takahashi

  • 17481 ITMX MNH1 cable repairement , takafumi.ushiba

    • 17560 Comment , takafumi.ushiba

    • 17571 Comment , takafumi.ushiba

    • (!) 17607 Comment , ryutaro.takahashi

  • 17588 MN OpLev alignment for ITMX , takafumi.ushiba

    • 17589 Comment , takaaki.yokozawa

IY

  • 17587 Calibration of BF damper , ryutaro.takahashi

  • (!) 17602 Rebooter installation for pico motor drivers. (ITMY) , koji.nakagaki

  • 17406 Setup of pre-isolator , ryutaro.takahashi

    • 17552 Comment , ryutaro.takahashi

PRM

  • 17584 Rebooter installation and network changes for pico motor drivers. (PRM) , koji.nakagaki

SR2

  • 17549 Oplev hardware , fabian.arellano

  • (!) 17600 The oplev output viewport is dirty , fabian.arellano

  • 17549 Oplev hardware , fabian.arellano

    • 17583 Comment , fabian.arellano

    • (!) 17592 Comment , fabian.arellano

This is generated by python script in /users/Miyo/dropbox/Script/scrapping/main.py.

Summary Report

Type-A

  • Replaced the LVDT drivers for the BF damper in IX and EX.
  • Repaired the cables in IX.
  • Setup the limit switches in IX and EX.
  • Checked the cable connections in IY and EX.
  • Preparing for the accelerometers.

Type-B

SR3

  • We measured the height of the optical table and balanced it to make it horizontal.
    • We used the laser level and measured the height at each suspension point with respect to the vertical centre of the flange.
    • We redistributed the ballast mass on top to make it horizontal.
    • The table is about 1 mm above the nominal value of 380 mm.
    • The amount of ballast mass on top is 13.84 kg.
  • We examined the cleanliness of the mirror with the new super ultra bright LED flashlight:
    • It looks very clean!
    • There a very few dust particles far away from the centre, so they're not a problem.

BS

For the O3GK paper, I revisited the calculation of the effect of DAC and coil driver noise on DARM. Because no one measured the transfer function from individual coils to DARM we cannot propagate the noise directly. However, it is possibler to calculate upper limits using the transfer functions from L, P and Y of the mirrors.

Type-Bp

  • PR2: Hirata-san and Yano-san confirmed the optical table is 10 mm lower than nominal.
  • PR3: They measured the height of the optical table.
  • PR3: When testing Guardian, Miyo-kun shook the mirror accidentally and it moved -3 mrad in pitch. Fortunately, it was possible to recover it with the picomotor.

Type-C

Electronics

Control

  • Updated on Oplev.

Schedule

See Schedule

  • Type-A team: ACC preparation.
  • Type-B team: Table height measurement in PRM/BS. OSEM offload in PR3.

Milestone

  • IMC suspensions are ready in air [40] will finish 2021/04/21.

  • PRs are ready in air [643] will finish 2021/07/09.

  • ETMX is ready in air [656] will finish 2021/08/25.

  • ITMX is ready in air [657] will finish 2021/08/31.

  • ETMY is ready in air [658] will finish 2021/09/16.

  • ITMY is ready in air [659] will finish 2021/11/08.

  • BS is ready in air [691] will finish 2021/11/24.

  • SRs are ready in air [663] will finish 2021/12/20.

  • Output suspensions are ready in air [695] will finish 2021/12/21.

  • TMSY is ready in air [708] will finish 2021/??/??.

  • TMSX is ready in air [684] will finish 2021/??/??.

2021/03/29 updated

Safety

  • Power leakage on 7/30.

Discussion

Travel Plans

The week from 8/2

  • Takahashi: 8/2-6
  • Sato: 8/2-6
  • Hirata: 8/2-6
  • Yano: 8/2-6
  • Ishizaki: 8/6-9 (Shift) -->canceled

The week from 8/9

Next meeting

  • 2021/8/6(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210730 (last edited 2021-07-31 14:16:45 by RyutaroTakahashi)