Line 37: Line 37:
Participants: Participants: Takahashi, Fabian, Miyoki, Uchiyama, Hirata, Ishizaki, Ushiba, Terrence, Sato, Tanaka, Sugiyama

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2021/10/22 13:00-

Participants: Takahashi, Ikeda, Yasui, Uchiyama, Yokozawa, Hirata, Sato, Aso, Kimura, Ushiba

Post O3 Upgrade portal

Schedule

  • IX: Health check. BF actuator.
  • EX: Health check. HPCD. BF damper (V).
  • IY: LVDT driver. Cable check.
  • EY: F0 FR range. Weight on PF.

Status

  • TM height setting: ITMY
  • Oplev: Wind shields were installed to the IXC and EXC.
  • ACC: Ready to install to EX. Measurement for IY is necessary.
  • Commissioning in air: Health check.
  • Commissioning in vacuum:
  • Overall commissioning:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: Under the bidding process.
  • Heater control: To PRs in the next.

Discussion


VIS Meeting

Date: 2021/10/22 14:00-

Participants: Takahashi, Fabian, Miyoki, Uchiyama, Hirata, Ishizaki, Ushiba, Terrence, Sato, Tanaka, Sugiyama

Summary Report

Type-A

  • Range of F0 FR in EY was expanded from +/- 0.4mm to +/- 0.9mm.

Type-B

  • SRM: We measured the mirror height with respect to Tomaru-san's new marking of the expected beam height.
    • It is 2.8 mm below. This is ~1.5 turns of the jacks.
    • We should try raising it with the jacks next week.
  • SR3 and SR2: We doubled checked previous measurements.

Type-Bp

PRM

According to Tomaru-san's measurements of the chamber height with respect to the BS, it is necessary to lower the suspension by 6.3 mm. We checked whether this is possible using the SF keystone:

  • It seems possible, however, we need to do additional work becuase a couple of cables touch the security structure after a displacement of 3.3 mm.
  • We think we can fix this problem by doing the following:
    • Modify one of the L-shaped security structure stops around the BF and
    • Add a cable clamp underneath the BF; there is an unused M6 threaded hole next to the cables.
    • See pictures in klog 18638.

  • For the sake of checking, we lowered the SF keystone from the setpoint by approximately 7.3 mm and nothing else semeed to touch the security structure. A RM coil cable came very close to do it, but we can modify the security structure easily.

PR3

Hirata-san finished the design of the SF keystone ballast mass base plate. We will proceed as soon as we have the new components.

Type-B and Type-Bp height report

See Fabian's slides.

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: LVDT driver in IY. HPCD and BF damper in EX.
  • Type-B team: Mirror inspection (Hirata-san), raise SRM, fix SRM IP LVDTs, it depends on the conclusions of the Tuesday meeting.

Safety

Discussion

Terrence: My plan at KAGRA. Presentation file here

Travel Plans

(Date in Kamioka)

The week from 10/25

  • Takahashi: 10/26-29
  • Sato: 10/26-29
  • Hirata: 10/26-29
  • Fabian: away on Monday and Tuesday due to vaccination.

The week from 11/1

  • Takahashi: 11/1-2
  • Hirata: 11/2-5

Next meeting

  • 2021/10/29(FRI)