Line 63: Line 63:
  * In the beginning, I thought the yaw oscillation was due to misbehaving control loops at the IP so I modified them in the beginning but turned out it was.   * In the beginning, I thought the yaw oscillation was due to misbehaving control loops at the IP so I modified them in the beginning but turned out it was not helping.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/1/14 13:00-13:30

Participants: Takahashi, Yokozawa, Ikeda, Ushiba, Aso, Uchiyama, Sato, Hirata

Post O3 Upgrade portal

Schedule

  • IX: Health check. Spectrum was improved. Investigation of the glitch in the F3 signals is still ongoing. Windshield for the MN oplev is not working well.
  • EX: Health check.
  • IY:
  • EY: ALIGN mode is available. LT->Yaw coupling is large. Preparation for ACCs.

Status

  • Replacement of flip cables: SRM has not been finished yet. Cables for Type-C will be delivered in the end of Jan.
  • TM height setting: ITMY.
  • Oplev: Setup of the TM Oplev in IY after the TM alignment.
  • ACC: Preparation for EY.
  • Commissioning in air: Return of GRY. Alignment of SR3/ETMY.
  • Commissioning in vacuum: Go to the stable lock.
  • Overall commissioning:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers: Cabling of the power line in IXV/EXC on 1/11-12.
  • Heater control: Test in IXV/EXV is planed. Repaired power controller will be delivered on 1/17.
  • Power source for Oplev:
  • Tunnel for the IYC booth: Planned on 1/31.

Discussion


VIS Meeting

Date: 2022/1/14 14:00-

Participants:

Summary Report

Type-A

  • Preparing for the ACCs in EY. The tuning of the resonant frequency was finished.
  • Fixed the cables around the IP in EY.
  • [Terrence] We aligned the EY and get the reflected green under the following condition:
    • IP L, T, controlled.
    • BF Y, controlled.
    • Coarse alignment of yaw using BF yaw pico motor.
    • Coarse alignment of pitch using MN pitch actuation.
  • There's something strange. I can't engage all IP controls at the same time. It used to be okay. I will check them later.

Type-B

SR3

  • Terrence reported SR3 wasn't healthy, the TF measurements looked bad.
  • We inspected the suspension and found several security structure screws touching the IM or IRM.
  • This suspension was healthy, how did it become unhealthy?
    • As they should be, the screws were likley close to the IM and IRM and began touching the payload when yaw was adjusted with the F0 stepper motor.
    • When we removed the F0 yaw stepper motor we followed a method to keep the same yaw position, but it seems it was not accurate enough.
    • We lost the alignment give by the oplev.
    • The incident angle of the green beam might have changed also.
  • Terrence updated several control filters of the SR3 and modified guardian.
    • In the beginning, I thought the yaw oscillation was due to misbehaving control loops at the IP so I modified them in the beginning but turned out it was not helping.
    • I modified the rest of the control filters for consistency.

Type-Bp

  • They inspected the PR3 traverser to check whether it had the locking assenmblies or they had been removed.
  • We calibrated PRM SF LVDT. The calibration factor hasn't been written in the medm screen yet.
  • In PR2, we connected the cable for TM-H4. A cable with the same label has beed connected. There are old cables around that flange and they should be removed.

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: Preparation for the ACCs in EY, Heter test in IXV/EXV
  • Type-B team:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 1/17

  • Takahashi: 1/18-21
  • Sato: 1/18-21
  • Hirata: 1/18-21

The week from 1/24

  • Takahashi: 1/24-28
  • Sato: 1/24-28
  • Hirata: 1/24-28

Next meeting

  • 2022/1/21(FRI)