Line 21: Line 21:
 * Replacement of flip cables: SRM was finished yet. Cables for Type-C will be delivered in the end of Jan.  * Replacement of flip cables: SRM was finished. Cables for Type-C will be delivered in the end of Jan.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/1/21 13:00-

Participants:

Post O3 Upgrade portal

Schedule

  • IX: Health check. Glitch in the F3 signals. Windshield for the MN oplev.
  • EX: Health check.
  • IY: Installation of the accelerometers.
  • EY: Repair of the IP H2 actuator. Photosensor V3. LT->Yaw coupling. Preparation for the accelerometers.

Status

  • Replacement of flip cables: SRM was finished. Cables for Type-C will be delivered in the end of Jan.
  • TM height setting: ETMY, ITMY.
  • Oplev: Setup of the TM Oplev in IY after the TM alignment.
  • ACC: Preparation for EY.
  • Commissioning in air: Return of GRY. Alignment of SR3/ETMY.
  • Commissioning in vacuum: Go to the stable lock.
  • Overall commissioning:
  • Acceptance check:
  • PF actuator: At the in-vacuum commissioning.
  • New vacuum pumps for V-chambers:
  • Heater control: Test in IXV/EXV is planed. Repaired power controller was delivered.
  • Power source for Oplev:
  • Tunnel for the IYC booth: Planed on 1/31.

Discussion


VIS Meeting

Date: 2022/1/21 14:00-

Participants:

Summary Report

Type-A

Type-B

Type-Bp

Type-C

Electronics

Control

Schedule

See Schedule

  • Type-A team: Installation of the ACCs in EY, Height adjustment of ETMY.
  • Type-B team:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 1/24

  • Takahashi: 1/25-28
  • Sato: 1/25-28
  • Hirata: 1/25-28

The week from 1/31

  • Takahashi: 1/31-2/4
  • Sato: 1/31-2/4
  • Hirata: 1/31-2/4

Next meeting

  • 2022/1/28(FRI)