Differences between revisions 2 and 3
Revision 2 as of 2023-04-20 14:01:28
Size: 1145
Comment:
Revision 3 as of 2023-04-21 11:38:28
Size: 1242
Comment:
Deletions are marked like this. Additions are marked like this.
Line 23: Line 23:
 * Commissioning: Measurements of DAC noise for ETMX and ETMY.  * Commissioning: Measurements of DAC noise.
Line 38: Line 38:
 * Returned the HPCD back for the accelerometers in EX.
Line 40: Line 42:
 * Optimizing the damping control for the BF damper.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/4/21 13:00-

Participants:

Acceptance check document

Suspensions

  • Type-A: Replacement of the coil driver in EX.
  • Type-B:
  • Type-Bp: Optimization of the damping control.
  • Type-C:

Other items

  • Oplev:
  • ACC: Modification of LPCD.
  • Commissioning: Measurements of DAC noise.
  • Vacuum system:
  • Heater control:
  • TMS:

Discussion


VIS Meeting

Date: 2023/4/21 13:30-

Participants:

Summary Report

Type-A

  • Returned the HPCD back for the accelerometers in EX.

Type-B

Type-Bp

  • Optimizing the damping control for the BF damper.

Type-C

Electronics

Control

R&D

Schedule

  • Type-A:
  • Type-B: Measurements in SRs.
  • Type-Bp: Damping control for BF damper.
  • Type-C:

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 4/24

Next meeting

  • 2023/4/28(FRI) 13:30-