Differences between revisions 3 and 4
Revision 3 as of 2023-08-03 09:16:32
Size: 1987
Comment:
Revision 4 as of 2023-08-04 08:57:27
Size: 1997
Comment:
Deletions are marked like this. Additions are marked like this.
Line 15: Line 15:
 * Type-A: Height adjustment in IX, IY, and EY on 7/30.  * Type-A: Height adjustment in IX, IY, and EY on 7/30 and 8/3.

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2023/8/4 13:00-

Participants:

Acceptance check document

Suspensions

  • Type-A: Height adjustment in IX, IY, and EY on 7/30 and 8/3.
  • Type-B: Modification of the BS yaw damping control.
  • Type-Bp:
  • Type-C:

Other items

  • Oplev:
  • ACC:
  • Commissioning:
  • Vacuum system: Replacement of the CC-10 in the Y-arm.
  • Heater control:
  • TMS:

Post O4a

  • Measurements of the DAC noise: on 8/4.
  • Measurements on the sensor correction in SR2: 1 night.
  • Optimization of the damping control in PRs: Measurements 2 days, Test 3 days.
  • IP control with the ACCs: Long-term test in IY.
  • In-vacuum accelerometer for IOO: Outgassing from the pod should be checked.
  • Hight adjustments of Type-A in the cooling: The procedure.

  • Temperature control for the Oplev: Implementation of the heater controller.

Discussion


VIS Meeting

Date: 2023/8/4 10:30-

Participants:

Summary Report

Type-A

  • Height adjustment in IX, IY, and EY.

Type-B

Type-Bp

Type-C

  • Damping of the OMC suspension.
    • Prototype test of the blade damper.
    • Design of the flexible pendulum damper.

Electronics

Control

R&D

  • TAMA-SAS experiment
    • Preparation for the IP controls.

Schedule

  • Monitoring and offload of Type-A during the cooling.
  • TAMA-SAS experiment.

Toward O5

Discussion

Next meeting

  • 2023/8/18 10:00-

KAGRA/Subgroups/VIS/VISMinutes20230804 (last edited 2023-08-04 13:25:20 by RyutaroTakahashi)