Line 1: Line 1:
'''防振''' ## page was renamed from LCGT/subgroup/vis
<<TableOfContents(3)>>
Line 3: Line 4:
リーダー: 高橋竜太郎 (NAOJ) == Vibration Isolation ==
 . Chief: R. Takahashi (NAOJ)
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
Line 5: Line 9:
サブリーダー:内山隆 (ICRR) ----
== VIS Meeting ==
 . Every Friday, from 13:30 (JST)
 . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 7: Line 14:
サブリーダー:三代木伸二 (ICRR) ----
== Design ==
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 9: Line 18:
*[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] [[KAGRA/Subgroups/VIS/TypeB|Type-B]]

[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]

[[KAGRA/Subgroups/VIS/Type-C|Type-C]]

[[KAGRA/Subgroups/VIS/Payload|Payload]]

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload


Installation


Operation


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)