Differences between revisions 173 and 175 (spanning 2 versions)
Revision 173 as of 2016-02-29 13:30:21
Size: 1220
Editor: NaokoOhishi
Comment:
Revision 175 as of 2016-04-21 16:40:27
Size: 1352
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]
Line 37: Line 39:
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary


Installation


Operation


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)