Differences between revisions 27 and 28
Revision 27 as of 2009-07-15 15:38:50
Size: 1144
Comment:
Revision 28 as of 2009-07-15 15:41:47
Size: 1280
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
 [[attachment:LCGT/subgroup/vis/Modeling1.ppt|LCGT-SAS Modeling]]

 [[attachment:LCGT/subgroup/vis/Modeling1.ppt|R&Dについて]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

防振系

  • 常温防振+ヒートリンク+低温懸架

    リーダー: 高橋竜太郎 (NAOJ)
    サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)

第2回LCGT防振系作業部会

第1回LCGT防振系作業部会

TAMA SAS の問題点

TAMA Double Pendulum の問題点

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)