Differences between revisions 51 and 52
Revision 51 as of 2009-08-17 12:34:33
Size: 2439
Comment:
Revision 52 as of 2009-08-17 12:34:53
Size: 2441
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
 [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]  . [[attachment:LCGT/subgroup/vis/Modeling2.ppt|LCGT-SAS Modeling 2]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

防振系

  • 常温防振+ヒートリンク+低温懸架
  • リーダー: 高橋竜太郎 (NAOJ)
  • サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR)

第3回LCGT防振系作業部会

第2回LCGT防振系作業部会

第1回LCGT防振系作業部会

TAMA SAS の問題点

TAMA Double Pendulum の問題点

Seismic spectrum in Kamioka mine

LCGT-SAS model

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)