Differences between revisions 88 and 89
Revision 88 as of 2011-03-24 11:20:19
Size: 4403
Comment:
Revision 89 as of 2011-03-24 11:23:41
Size: 4448
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 . Member: T. Uchiyama(ICRR)R. De''''''Salvo(Univ. of Sannio)H. Ishizaki(NAOJ)A. Takamori(ERI)E. Majorana(INFN)T. Sekiguchi(ICRR)  . Member: T. Uchiyama(ICRR), R. De''''''Salvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR)
Line 11: Line 11:
 . 23 March 21:00  . 23 March, 2011 21:00
Line 17: Line 17:
 . 16 March 21:00  . 16 March, 2011 21:00
Line 22: Line 22:

LCGT防振系作業部会(2009)
Line 81: Line 83:
[[LCGT/subgroup/vis/FEM|FEM Page]]  . [[LCGT/subgroup/vis/FEM|FEM Page]]

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

Vibration Isolation

  • Chief: R. Takahashi(ICRR)
  • Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR)

The 2nd EVO Meeting

The 1st EVO Meeting


LCGT防振系作業部会(2009)

第6回LCGT防振系作業部会

第5回LCGT防振系作業部会

LCGT防振系作業部会ブレーンストーミング

  • 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 (議事録)

  • メモ

第4回LCGT防振系作業部会

第3回LCGT防振系作業部会

第2回LCGT防振系作業部会

第1回LCGT防振系作業部会


TAMA SAS

TAMA Double Pendulum

Seismic spectrum in Kamioka mine

LCGT-SAS model

Finite Element Analysis

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)