Results 226 - 250 of 438 results out of about 36072 pages. (8.70 seconds)
- KAGRA/Observation/iKAGRA/Suspensions . . . 7 matches
- ...= iKAGRA Suspensions =
Here's a summary of iKAGRA suspensions.
See, also, [[KAGRA/Subgroups/VIS/ActuatorDesign|this page]] for bKAGRA actuator design summary.
== Mirror ==
|| ...
- KAGRA/Subgroups/VIS/VISMinutes20181130 . . . 6 matches
- ...ate a working suspension with an OL for Kozu-kun.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20181116 . . . 6 matches
- ...blocks and should not be accidentally enabled.)
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20181109 . . . 6 matches
- ...ng high, with the blades at their upper stops.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20181102 . . . 6 matches
- ...ent recommended for the IM-V OSEMs by Shoda-san.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20181026 . . . 6 matches
- ...st SF trim mass for balance and keystone height.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20181019 . . . 6 matches
- ... Set up OL.
===== SRM =====
* Continue assembly.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20181012 . . . 6 matches
- ...he AF and SS to the SF level.
* Install the SF.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20181005 . . . 6 matches
- ...Ms.
* Suspend/weigh/balance the BF/... section.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180907 . . . 6 matches
- ...
* Install IRM.
* Install/cable/test IM OSEMs.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180727 . . . 6 matches
- ....
* Check PI coil connections, IP LVDT magnets.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180713 . . . 6 matches
- ...
* Get Mirapro to move AF from SR3 to SRM area.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180706 . . . 6 matches
- ...to second floor.
* Rebuild top filter of PI #2.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180629 . . . 6 matches
- ...LBB damper rings.
* Crane suspension into tank.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180622 . . . 6 matches
- ...LBB damper rings.
* Crane suspension into tank.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20180615 . . . 6 matches
- ...rata-san, Kozu-kun, Terrence at Kamioka Mon-Fri.
==== To-Do Lists, Schedule ====
* [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]]
* [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]]
* [[https://gwdo...
- KAGRA/Subgroups/VIS/VISMinutes20170526 . . . 6 matches
- ... temperature fluctuations etc.
==== Plan for coming weeks ====
For more detail, see [[KAGRA/Subgroups/VIS/TypeB/ToDo]].
Week of 5/29, 6/6:
* Cabling:
* Route BF/... cabling u...
- KAGRA/Subgroups/VIS/VISMinutes20160304 . . . 6 matches
- ...eek ===
* Mon:Okutomi will stay
* Tue:Okutomi will stay
* Wed:
* Thu:
* Fri:
== iKAGRA ETM suspension ==
* Current status (Ohishi)
* Picomotor check is to be done
* ETM...
- KAGRA/Subgroups/VIS/Sensors/InertialSensor . . . 6 matches
- ...[[KAGRA/Subgroups/VIS/Sensors/Geophone|Geophone]]
[[KAGRA/Subgroups/VIS/Sensors/Accelerometer|Accelerometer]]...
- KAGRA/Subgroups/VIS/OpsManual/TypeB/HealthCheck . . . 6 matches
- ...= KAGRA VIS Operations Manual - Health Check for Type B Suspensions =
This page describes how to do a health check on a Type B suspension.
== Stuff to Add ==
* IP stuff
* OL s...
- KAGRA/Subgroups/VIS/ModelPlotter . . . 6 matches
- ...visor/conf.d/k1vis.conf
[program:vis_plotter]
user=controls
command=bash -c 'cd /kagra/Drobbox/Subsystems/VIS/Scripts/VISapp && /usr/bin/python3 manage.py 0.0.0.0:8000'
au...
- KAGRA/Subgroups/PEM/RachCable . . . 6 matches
- ...== Rack and cabling check ==
* [[KAGRA/Subgroups/AEL/Rackcheck|Rackcheck (w/ AEL)]]
* BS re-cabling (w/ Type-B team)
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/Doc...
- KAGRA/Subgroups/PEM/Portable . . . 6 matches
- ...%82%AB%E3%83%BC-%E9%9F%B3%E5%8C%A0/dp/B078C6FKKX|音匠]]
== メモ ==
* PEMのgoogle acount : kagrapem@gmail.com (PASSはk1ctr1と同じ)
* データ共有 : [[https://drive.google.com/drive/folders/1zI...
- KAGRA/Subgroups/MIF/ExternalReview2021 . . . 6 matches
- ...bin/DocDB/ShowDocument?docid=13224
== Purpose ==
From February 25 to April 21, 2020, KAGRA performed its first observing run for 4 weeks with power-recycled Fabry-Perot-Michelso...
- KAGRA/Subgroups/IOO/MC/IMCWFS . . . 6 matches
- ...月木金は苔山さん; 木金は菅原くん香川くん)
* --(IMC relock in vacuum)-- IMC空気アライメント
* 光学定盤の設置 [坑内作業] [[KAGRA/Subgroups/IOO/OutputTables|OutputTables]]
* ビシャモン、クランプなどの用意 [[http://gwdoc.icrr.u-t...