Differences between revisions 1 and 2
Revision 1 as of 2021-06-08 18:54:49
Size: 411
Editor: YoichiAso
Comment:
Revision 2 as of 2021-06-08 18:56:51
Size: 339
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Installation location report (Aso) [[attachment:FC20210518.pptx|CAD check]][[attachment:IX側距離.pptx|FC Length]]
 * Status reports
 * FIS design choice study status (Yuhang)
 * FC noise simulation status (Marc)
 * Other status reports
Line 11: Line 12:
  * Filter Cavity design: Marc
  * FIS design: Yuhang
Line 14: Line 13:
  * Budget: Aso

KAGRA Filter Cavity Meeting 2021/6/9

Date/Time: 2021/6/9 13:00 - 14:00

Connection: KAGRA Zoom2 (https://zoom.us/j/6676627462)

Agenda

  • FIS design choice study status (Yuhang)
  • FC noise simulation status (Marc)
  • Other status reports
    • Overall design: Matteo
    • Interface optics: Yao-Chin
    • Budget: Aso

KAGRA/Upgrades/PostO4Upgrades/FilterCavity/Meetings/20210609 (last edited 2021-06-08 18:56:51 by YoichiAso)