Differences between revisions 8 and 9
Revision 8 as of 2020-07-06 12:57:57
Size: 3665
Comment:
Revision 9 as of 2020-07-06 13:01:40
Size: 3709
Comment:
Deletions are marked like this. Additions are marked like this.
Line 30: Line 30:
   * carrier and f1 3rd mode is overlapped?    * carrier and f1 3rd mode is overlapped? http://klog.icrr.u-tokyo.ac.jp/osl/?r=14620

ISC Meeting on 2020/07/06 13:30 - 14:30

Participants:

Zoom meeting: https://zoom.us/j/5045179604

Your time zone: https://www.timeanddate.com/worldclock/fixedtime.html?iso=20200706T0430

Next meeting

When necessary

back to Meetings page

Minutes

Agenda

Copy from previous meeting

  • Simulation activities necessary
    • LSC and ASC simulations with current ITMs and current interferometer setup
      • Especially LSC simulations not done for PRFPMI and DRMI, and 3f locking
      • Compare measured LSC and ASC sensing matrices with simulations
      • Compare measured recycling gain (for carrier and sidebands) with simulations
      • Compare measured AS mode content with simulations
      • Compare measured MICH/PRCL/SRCL controls noise coupling with simulations
      • Compare measured intensity/frequency noise coupling with simulations
    • Thermal lensing in BS
  • Measurements necessary to do simulation work
    • PRC (SRC) length and Gouy phase
    • Schnupp asymmetry
    • modulation depth (arm cavity scan)
    • arm cavity length (arm cavity scan)
    • arm cavity round-trip loss measurement with birefringence effect correctly taken into account (with PBS at POP/POS and TRX/TRY) JGW-T2011633

    • Power recycling gain for carrier and sidebands
    • Throughput from IMC output to AS RF, OMC DC, REFL, POP, TRX, TRY
  • Measurements necessary to compare the result with simulation

KAGRA/subgroup/ifo/MIF/Minutes20200706 (last edited 2020-07-06 16:26:33 by YutaMichimura)