Line 8: Line 8:
== To be modified ==
 * Ballast masses; see [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5196|here]] and my note on June 1, 2018.
 * Wire heads holders
 * Damper plates design; how to put back them to the installed NAB.
 * The number of screws to hold the damp plate.
 * Grooves to show the center line at the ears
 * Gimmick how to take out the NAB suspension from the wooden box in Kamioka in the next time.
 * Clamps for the inner tower.
Line 14: Line 23:
 * Check the positions and rigidity of the Inoue-tower, and the dirtiness.
 * Check also the Inoue-tower's fixing method; at least IXA it seems need to be re-worked.
 * Check the positions and rigidity of the inner tower, and the dirtiness.
 * Check also fixing method for the inner tower; at least in IXAm it seems re-working is needed.
Line 17: Line 26:
 * Make grooves to be refereneces to locate the NAB finally.  * Make grooves to be references so that we can locate the NAB properly with respect to the interferometer's main beam.

Narrow Angle Baffle

<< <  2018 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

To be modified

  • Ballast masses; see here and my note on June 1, 2018.

  • Wire heads holders
  • Damper plates design; how to put back them to the installed NAB.
  • The number of screws to hold the damp plate.
  • Grooves to show the center line at the ears
  • Gimmick how to take out the NAB suspension from the wooden box in Kamioka in the next time.
  • Clamps for the inner tower.

Task list

Note: some of the tasks can be done in parallel.

  • Make the clean booth clean and useful; prepare tables, shelves, ethanol, tools...
  • Open the side flanges and top lid; attach white tapes (SPV-202) to the open flanges to protect them.
  • Check the positions and rigidity of the inner tower, and the dirtiness.
  • Check also fixing method for the inner tower; at least in IXAm it seems re-working is needed.
  • Measure several heights and widths
  • Make grooves to be references so that we can locate the NAB properly with respect to the interferometer's main beam.

KAGRA/subgroups/AOS/NarrowAngleBaffles (last edited 2018-06-25 14:32:09 by SimonZeidler)