Differences between revisions 522 and 523
Revision 522 as of 2020-03-27 08:36:21
Size: 15194
Comment:
Revision 523 as of 2020-03-27 20:52:31
Size: 15282
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 78: Line 78:
||<#F0FFF0>'''Commissioning''' ||[[KAGRA/Commissioning|Commissioning top]] ||<#F0FFF0>'''Engineering Run''' || [[KAGRA/EngineeringRun/ER191217_24|ER191217-24]] <<BR>> [[KAGRA/EngineeringRun/ER200220-25|ER200220-25]] ||<#F0FFF0>'''KAGRA-JRPC''' || [[KAGRA/EngineeringRun/kagra-jrpc|20-01-24]] <<BR>> [[KAGRA/EngineeringRun/kagra-jrpc|20-02-20]] ||<#F0FFF0>'''Observation''' ||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (2016:3/15-31, 4/11-25) <<BR>> [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1]] (2018:4/28-5/6) || ||<#F0FFF0>'''Commissioning''' ||[[KAGRA/Commissioning|Commissioning top]] ||<#F0FFF0>'''Engineering Run''' || [[KAGRA/EngineeringRun/ER191217_24|ER191217-24]] <<BR>> [[KAGRA/EngineeringRun/ER200220-25|ER200220-25]] ||<#F0FFF0>'''KAGRA-JRPC''' || [[KAGRA/EngineeringRun/kagra-jrpc|20-01-24]] <<BR>> [[KAGRA/EngineeringRun/kagra-jrpc|20-02-20]] ||<#F0FFF0>'''Observation''' ||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (2016:3/15-31, 4/11-25) <<BR>> [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1]] (2018:4/28-5/6) <<BR>> [[KAGRA|KAGRA/Observation/iKAGRA|iKAGRA observation]](2020/2/25-3/10, 4/7-4/21) ||

KAGRA Wiki

Information for researchers. For general information, please go to https://gwcenter.icrr.u-tokyo.ac.jp.


Present Status of KAGRA



News

  • LIGO Data Grid access is available. See [kagra 03375] and here.

  • Application to access account for LVC resources. See [kagra 03376] and apply from here.

  • FAQ (Frequently Asked Question page) is open. The sample of Acknowledgment.

  • Coming meetings
    • The 2020 March LIGO-VIRGO-KAGRA telecon: starts March 13 (Fri) 00:00 JST, 90 minutes

      • Status of LIGO, Virgo, KAGRA, GEO, and else.

        The agenda is here (requires password). The Zoom meeting access from here. Meeting ID and password were circulated by e-mail March 10.

    • KAGRA telecon: May 27 (Wed) & 28 (Thur), 2020 @ Zoom3

      • Alternative to the cancelled Face-to-Face meeting, we will have a telecon for two days, on May 27 and 28.

        See F2F page

    • The 2020 March LIGO-VIRGO-KAGRA meeting: at Lake Geneva, WI, USA, 2020 March 16 (Mon) - 19 (Thur).

      • web site Note that the meeting was cancelled due to the current worldwide outbreak of coronavirus. see [kagra 03386].

    • The KAGRA Face-to-Face meeting: at ICRR, Univ. Tokyo, 2020 April 17 (Fri) - 19 (Sun).
      • This meeting was cancelled due to the current worldwide outbreak of coronavirus.

  • Postponement of meetings
    • The 7th KAGRA International Workshop (KIW7) at National Central University in Taiwan (planned in the end of May, 2020) will be held in July or August 2020.
    • GWADW at Hokkaido (planned in the middle of May, 2020) is postponed a year.


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
KAGRA International Workshop
Chief Meeting blog (Old Chief Meeting)
Reviews
ET-KAGRA collaboration (ELiTES)
Related events

Documents
/Information

KAGRA log (klog)
JGWDoc
KAGRA Design Document Tree
Blogs
SVN
Bugzilla -- issue tracker (internal only)
MOU
Terminology
Publications
Collaboration Member list
Operation Manuals

Task management

Site Shift schedule
KAGRA organization chart
Project Chart page
Reservation for theKoachFilters

Tools

How to upload documents to JGWDoc (Japanese, English)
How to use SVN
How to join Mailing lists
How to use this JGW wiki (Japanese, English)
How to start using klog
How to use Remote participation tools

Commissioning

Commissioning top

Engineering Run

ER191217-24
ER200220-25

KAGRA-JRPC

20-01-24
20-02-20

Observation

Observation top
iKAGRA observation (2016:3/15-31, 4/11-25)
bKAGRA phase1 (2018:4/28-5/6)
KAGRA/Observation/iKAGRA(2020/2/25-3/10, 4/7-4/21)

Safety and Activity Control

Safety top

Warning System (in UTnet)

Workers Monitoring (in UTnet)

Collaborators Entrance Application


[2] KSC contents

KSC = KAGRA Scientific Congress

KSC

KSC page (KSCboard, Committees, KSC members)

KSC newsletter

No.6 (2019 December), No.5 (2019 August), No.4 (2019 April), No.3 (2018 December), No.2 (2018 August), No.1 (2018 April)

Rules and Regulations

links in KSC page

KAGRA Data Analysis Working Group

Data Analysis Working Group

Data Analysis Working Group Top Page

Data Analysis Committee

Data Analysis Committee Top Page

Working Groups

CBC
Burst
Continuous Waves
Stochastic background
Computing and Software


KAGRA Documents


[3] Site Access information

How to work at the KAGRA site?

Technical information

  • Table of KAGRA location (Table)


[4] Subsystems

Subgroups

Subgroup name

Links

0

System Integration

---

wiki

1

Tunnel

TUN

wiki

blog

2

Facility

FCL

wiki

blog

3

Vacuum

VAC

wiki

4

Cryogenics

CRY

wiki

blog

5

Vibration Isolation

VIS

wiki

blog

6

Mirror

MIR

wiki

7

Laser

LAS

wiki

8

Main Interferometer

MIF

wiki

9

Input/Output Optics

IOO

wiki

blog

10

Auxiliary Optics Subsystem

AOS

wiki

blog

11

Analog Electronics

AEL

wiki

blog

12

Digital System

DGS

wiki

blog

13

Data Management

DMG

wiki

14

Data Analysis

DAS

wiki

15

Geophysics Interferometer

GIF

wiki

16

Detector Characterization

DET

wiki

blog

17

Calibration

CAL

wiki

18

Physical Environment Monitors

PEM

wiki

**

Advanced R&D

wiki

**

NAOJ Test alog

(NAOJ)

NAOJlog

**

KAGRA Stock in Shelfs

Info Page

* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.

KAGRA Document and Drawing Tree


[5] Other information

Target Sensitivity of bKAGRA

latest estimated sensitivity curve

  • Sensitivity data can be downloaded from JGW-T1707038

  • Website about the KAGRA sensitivity is here.

  • Parameter list is here.

Others

KAGRA (last edited 2024-03-19 14:08:05 by MihokoOkinaka)