Line 48: Line 48:
|| ||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||Apr||May||Jun||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||
||Janis || || || ||T-4|| || || || || || || || || || || || || || || || || ||
||Joris || || || || || ||T-5||T-5|| || || || || || || || || || || || || || ||
||Jerome || || || ||   || || || || || || || || || || || || || || || || || ||
||Kazuhiro|| || || || || || || || || || || || || || || || || || || || || ||
|| ||Jul||Aug||Sep||Oct ||Nov||Dec||Jan||Feb||Mar||Apr||May||Jun||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||
||Janis || || || ||T-4 || || || || || || || || || || || || || || || || || ||
||Joris || || || ||  || ||T-5||T-5|| || || || || || || || || || || || || || ||
||Jerome || || || ||ICRR|| || || || || || || || || || || || || || || || || ||
||Kazuhiro|| || || ||  || || || || || || || || || || || || || || || || || ||
|| || || || ||NAOJ|| || || || || || || || || || || || || || || || || ||

ELiTES activities in Japan (2015-2016)

Task List

(Task-1) Cryogenic Payload [host: Tomaru and Yamamoto]

  • Collaboration on the cryogenic payload design (2015)
  • Property measurement of cryogenic materials (2015) : (1) application and removal of indium (2) measurements of the thermal resistance of heat links and joint interfaces
  • Development of local sensors and actuators (2015)
  • Platform assembly (2015 1Q-2Q)
  • Cooling test (2015 3Q-4Q)
  • Suspension assembly (2015 1Q-4Q)
  • Control test (2015 3Q - 2016 2Q)
  • Vibration test at JAXA (2016 1-2Q)
  • Installation and commissioning at the KAGRA site : available when CRY members work at site

(Task-2) Cool-down test of the cryostat + duct shield [host: Tomaru and Yamamoto]

  • Preparation of a cryo-cooler system and DAQ system (2015 2Q)
  • Cooling test and vibration test (2015 3Q)

(Task-3) Installation of the cryogenic payload prototype [host: Tomaru and Yamamoto]

  • Installation (2016, 1-2Q)
  • Cooling test and control test (2016, 3-4Q) : actual cooling of the real system is planned in 2017

(Task-4) Output mode-cleaner development [host: Somiya]

  • Development of control scheme with a table-top experiment at Tokyo Tech

(Task-5) Development of horizontal accelerometer for the inverted pendulum [host: Takahashi]

  • Experiment at National Astronomical Observatory at Mitaka

(Task-6) Site development of Kamioka [host: Kokeyama]

  • Development real time software for subsystem controls
  • Develop the mine environment monitor system
  • Fabrications for analog circuits
  • Other input/output optics installation tasks


Overseas Participants List

2015

  • Janis Woehler (AEI): Task-4
  • Joris van Heijningen (NIKHEF): Task-5
  • Jerome Degallaix (LMA):
  • Kazuhiro Agatsuma (NIKHEF)

Allocation Plan

2015

2016

2017

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Janis

T-4

Joris

T-5

T-5

Jerome

ICRR

Kazuhiro

NAOJ