ELiTES activities in Japan (2015-2016)

Task List

(Task-1) Cryogenic Payload [host: Tomaru and Yamamoto]

  • Collaboration on the cryogenic payload design (2015)
  • Property measurement of cryogenic materials (2015) : (1) application and removal of indium (2) measurements of the thermal resistance of heat links and joint interfaces
  • Development of local sensors and actuators (2015)
  • Platform assembly (2015 1Q-2Q)
  • Cooling test (2015 3Q-4Q)
  • Suspension assembly (2015 1Q-4Q)
  • Control test (2015 3Q - 2016 2Q)
  • Vibration test at JAXA (2016 1-2Q)
  • Installation and commissioning at the KAGRA site : available when CRY members work at site

(Task-2) Cool-down test of the cryostat + duct shield [host: Tomaru and Yamamoto]

  • Preparation of a cryo-cooler system and DAQ system (2015 2Q)
  • Cooling test and vibration test (2015 3Q)

(Task-3) Installation of the cryogenic payload prototype [host: Tomaru and Yamamoto]

  • Installation (2016, 1-2Q)
  • Cooling test and control test (2016, 3-4Q) : actual cooling of the real system is planned in 2017

(Task-4) Output mode-cleaner development [host: Somiya]

  • Development of control scheme with a table-top experiment at Tokyo Tech


Overseas Participants List

  • TBA (AEI)

Allocation Plan

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

TBA

TBA

TBA

TBA