Differences between revisions 6 and 7
Revision 6 as of 2015-06-10 09:33:43
Size: 2127
Comment:
Revision 7 as of 2015-06-13 13:54:28
Size: 2154
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
 * TBA (AEI)  * Janis Woehler (AEI)
Line 36: Line 36:
|| ||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||Apr||May||Jun||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||
||TBA|| || || || || || || || || || || || || || || || || || || || || ||
||TBA|| || || || || || || || || || || || || || || || || || || || || ||
||TBA|| || || || || || || || || || || || || || || || || || || || || ||
||TBA|| || || || || || || || || || || || || || || || || || || || || ||
||      ||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||Apr||May||Jun||Jul||Aug||Sep||Oct||Nov||Dec||Jan||Feb||Mar||
||Janis || || || || || || || || || || || || || || || || || || || || || ||
||
TBA   || || || || || || || || || || || || || || || || || || || || || ||
||TBA   || || || || || || || || || || || || || || || || || || || || || ||
||TBA   || || || || || || || || || || || || || || || || || || || || || ||

ELiTES activities in Japan (2015-2016)

Task List

(Task-1) Cryogenic Payload [host: Tomaru and Yamamoto]

  • Collaboration on the cryogenic payload design (2015)
  • Property measurement of cryogenic materials (2015) : (1) application and removal of indium (2) measurements of the thermal resistance of heat links and joint interfaces
  • Development of local sensors and actuators (2015)
  • Platform assembly (2015 1Q-2Q)
  • Cooling test (2015 3Q-4Q)
  • Suspension assembly (2015 1Q-4Q)
  • Control test (2015 3Q - 2016 2Q)
  • Vibration test at JAXA (2016 1-2Q)
  • Installation and commissioning at the KAGRA site : available when CRY members work at site

(Task-2) Cool-down test of the cryostat + duct shield [host: Tomaru and Yamamoto]

  • Preparation of a cryo-cooler system and DAQ system (2015 2Q)
  • Cooling test and vibration test (2015 3Q)

(Task-3) Installation of the cryogenic payload prototype [host: Tomaru and Yamamoto]

  • Installation (2016, 1-2Q)
  • Cooling test and control test (2016, 3-4Q) : actual cooling of the real system is planned in 2017

(Task-4) Output mode-cleaner development [host: Somiya]

  • Development of control scheme with a table-top experiment at Tokyo Tech

(Task-5) Development of horizontal accelerometer for the inverted pendulum [host: Takahashi]

  • Experiment at National Astronomical Observatory at Mitaka


Overseas Participants List

  • Janis Woehler (AEI)

Allocation Plan

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Janis

TBA

TBA

TBA

LCGT/ELiTES/2015 (last edited 2015-11-05 22:21:38 by KentaroSomiya)