ELiTES activities in Japan (2015-2016)

Task List

(Task-1) Cryogenic Payload

2. Installation and commissioning at the KAGRA site

(Task-2) Cool-down test of the cryostat + duct shield

(Task-3) Installation of the cryogenic payload prototype

Actual cooling of the real system would be done in 2017. We will perform some fundamental tests and error checkings of the cryo-payload prototype that is currently under fabrication at KEK by the end of 2015. We will then move on to the fabrication of the real machine at KEK-ICRR so the prototype shall be moved to Kamioka and used for an assembly test.

Overseas Participants List

Allocation Plan