1st: September 21, 2010(Tue) 14pm-15pm(JST) == 1st: September 21, 2010(Tue) 14pm-15pm(JST) ==
Line 6: Line 6:
 1.
Line 7: Line 8:
General report of the project (progress since the last meeting on 2nd, August)
Construction Schedule in detail (based on the summary by PM support group)
Revised organization diagram (renewed sub-WGs, newly created LCGT Steering Committee)
Guideline to accept new members of LCGT
Diameter of vacuum tube (re-confirmation)
Progress report of MOU with LIGO for the cooperative research agreement (discussion point: Policy of data-exchange in future)
Others
Line 15: Line 9:
 . 2.
Line 16: Line 11:
2.Time schedule for LCGT project (password protected)
3.LCGT Construction organization (password protected)
4.Guideline of the membership of LCGT Collaboration (password protected)
5.Determination of the diameter of vacuum tube (password protected)
Minute
 * [[LCGT/Meeting/Leader/20100419/minute|Minute]]

1st: September 21, 2010(Tue) 14pm-15pm(JST)