Differences between revisions 13 and 14
Revision 13 as of 2016-07-22 15:46:07
Size: 3969
Editor: EriSakamoto
Comment:
Revision 14 as of 2016-07-22 16:01:27
Size: 3685
Editor: EriSakamoto
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
- Greeting message (2min)  * Greeting message (2min)
Line 15: Line 15:
- KAGRA overview (15min+3min)

- SEO report (20min+5min)

- Introduction of new collaborators & guest (5min)

- Summary of the external review and PAB (20+5min)

- What we have learned from the iKAGRA run (20+10min)

        - Summary of the iKAGRA run (summary from the extended chief meeting.)
 * KAGRA overview (15min+3min)

 * SEO report (20min+5min)

 * Introduction of new collaborators & guest (5min)

 * Summary of the external review and PAB (20+5min)

 * What we have learned from the iKAGRA run (20+10min)

  * Summary of the iKAGRA run (summary from the extended chief meeting.)
Line 33: Line 33:
- bKAGRA phase I roadmap (M. Ando, 25min + 10min)

- Review on science of bKAGRA era (25min+10min)
 * bKAGRA phase I roadmap (M. Ando, 25min + 10min)

 * Review on science of bKAGRA era (25min+10min)
Line 41: Line 41:
- bKAGRA phase II planning (60min)
   - Installation
   - Commissioning
   - Observation policy
        - Discussion
 * bKAGRA phase II planning (60min)

* Installation

* Commissioning

* Observation policy

* Discussion
Line 53: Line 57:
- Status report from subgroups I (45min)
        - AOS 15min x 2
        - MIF 15min x 3

                - MIF status overview (Michimura, 15 min)

                - bKAGRA Phase 1 ASC (Enomoto, 15 min)

                - OFI/OMC (Somiya, 15 min)
 * Status report from subgroups I (45min)

  *
AOS 15min x 2

  *
MIF 15min x 3

   * MIF status overview (Michimura, 15 min)

   * bKAGRA Phase 1 ASC (Enomoto, 15 min)

   * OFI/OMC (Somiya, 15 min)
Line 63: Line 69:
        - CAL 15min x 1   * CAL 15min x 1
Line 69: Line 75:
- New people presentation (40min)

- Vote for new people (10min)
 * New people presentation (40min)

 * Vote for new people (10min)
Line 82: Line 88:
- Status report from subgroups II

        - FCL 15min x 1
        - IOO 15min x 2
 * Status report from subgroups II

  * FCL 15min x 1

* IOO 15min x 2
Line 92: Line 99:
- 4 Talks from collaboration members

        - TBD (15min x 4)
 * 4 Talks from collaboration members

  * TBD (15min x 4)
Line 102: Line 109:
- Status report from subgroups III

        - VIS 15min x 4

        - CRY 15min x 4
 * Status report from subgroups III

  * VIS 15min x 4

  * CRY 15min x 4
Line 114: Line 121:
- Invited talk from the Virgo collaboration (F. Ricci, 40min+10min)  * Invited talk from the Virgo collaboration (F. Ricci, 40min+10min)
Line 120: Line 127:
- Status report from subgroups IV (90min)

        - GIF 15min x 1

        - DetChar 15min x 3

                - DET status (Hayama, 15min)

                - Measurement of Schumann Resonance(Atsuta, Kataoka,15min)

                - Water study (Measurement: Shikano, Theory: Somiya,15min)
 * Status report from subgroups IV (90min)

  * GIF 15min x 1

  * DetChar 15min x 3

   *DET status (Hayama, 15min)

   *Measurement of Schumann Resonance(Atsuta, Kataoka,15min)

   *Water study (Measurement: Shikano, Theory: Somiya,15min)
Line 138: Line 145:
- Status report from subgroups V (75min)

        - VAC 15min x 1 (N. Ohishi)

        - MIR 15min x 1 ? (no reply)

        - LAS 15min x 1 ? (no reply)

        - AEL 15min x 1

        - DGS 15min x 4

                - TBD (TBA, 15min)

                - TBD (TBA, 15min)

                - TBD (TBA, 15min)

                -
Hardware Injection (T. Yokozawa, 15min)
 * Status report from subgroups V (75min)

  * VAC 15min x 1 (N. Ohishi)

  * MIR 15min x 1 ? (no reply)

  * LAS 15min x 1 ? (no reply)

  * AEL 15min x 1

  * DGS 15min x 4

  * TBD (TBA, 15min)

  * TBD (TBA, 15min)

  * TBD (TBA, 15min)

  *
Hardware Injection (T. Yokozawa, 15min)
Line 166: Line 173:
- KSC items (for KSC members, 40min, Prof. Hyung-Mok Lee leads)  * KSC items (for KSC members, 40min, Prof. Hyung-Mok Lee leads)
Line 174: Line 181:
- Status report from subgroups VI

        - DMG 15min x 3

                - Main data storage & DMG roadmap (Kanda,15min)

                - Data transfer system (Sakai,15min)

                - TBD (Oohara,15min)
 * Status report from subgroups VI

  * DMG 15min x 3

   * Main data storage & DMG roadmap (Kanda,15min)

   * Data transfer system (Sakai,15min)

   * TBD (Oohara,15min)
Line 184: Line 191:
        - DAS 15min x 5

                - Status (H. Tagoshi, 15min)

                - TBD (T. Yuzirihara, 15min)

                - TBD (Joengcho Kim, 15min)

                - Continuous wave search using the iKAGRA data (Eda, 15min)

                - TBD (T. Yamamoto, 15min)
  * DAS 15min x 5

   * Status (H. Tagoshi, 15min)

   * TBD (T. Yuzirihara, 15min)

   * TBD (Joengcho Kim, 15min)

   * Continuous wave search using the iKAGRA data (Eda, 15min)

   * TBD (T. Yamamoto, 15min)
Line 203: Line 210:
- iKAGRA publication plan (20+20min)

- Safety rules & lecture (20min)

- Organization (10min each, 30min)

        - Document and drawings

        - CPC (R. Flaminio)

        - Authorship
 * iKAGRA publication plan (20+20min)

 * Safety rules & lecture (20min)

 * Organization (10min each, 30min)

  * Document and drawings

  * CPC (R. Flaminio)

  * Authorship
Line 215: Line 222:
- Report from IBR members (15min+5min)

- Summary (10min)
 * Report from IBR members (15min+5min)

 * Summary (10min)

KAGRA Site Tour (subscribers only, August 24)

  • from 13:00 at Hokubu-kaikan(data analysis building of KAGRA)

Program (August 25 - 27)

August 25th (Thu)

(10:30-11:00)REGISTRATION

AM

(11:00-12:45) Chair:

  • Greeting message (2min)
  • KAGRA overview (15min+3min)
  • SEO report (20min+5min)
  • Introduction of new collaborators & guest (5min)

  • Summary of the external review and PAB (20+5min)
  • What we have learned from the iKAGRA run (20+10min)
    • Summary of the iKAGRA run (summary from the extended chief meeting.)

(12:45-13:45)Lunch

PM1

(13:45-14:55) Chair

  • bKAGRA phase I roadmap (M. Ando, 25min + 10min)
  • Review on science of bKAGRA era (25min+10min)

PM2

(14:55-15:55) Chair

  • bKAGRA phase II planning (60min)
    • Installation
    • Commissioning
    • Observation policy
      • Discussion

(15:55-16:10) Break

PM3

(16:10-17:40) Chair

  • Status report from subgroups I (45min)
    • AOS 15min x 2
    • MIF 15min x 3
      • MIF status overview (Michimura, 15 min)
      • bKAGRA Phase 1 ASC (Enomoto, 15 min)
      • OFI/OMC (Somiya, 15 min)
    • CAL 15min x 1

PM4

(17:40-18:30) Chair

  • New people presentation (40min)
  • Vote for new people (10min)

(18:30-) IBR meeting

August 26th (Fri)

AM1

(9:00-10:45) Chair

  • Status report from subgroups II
    • FCL 15min x 1
    • IOO 15min x 2

AM2

(9:45-10:45) Chair:

  • 4 Talks from collaboration members
    • TBD (15min x 4)

(10:45-11:00) Break

AM3

(11:00-13:00) Chair:

  • Status report from subgroups III
    • VIS 15min x 4
    • CRY 15min x 4

(13:00-14:00) Lunch

PM1

(14:00-14:50) Chair:

  • Invited talk from the Virgo collaboration (F. Ricci, 40min+10min)

PM2

(14:50-15:50) Chair:

  • Status report from subgroups IV (90min)
    • GIF 15min x 1
    • DetChar 15min x 3

      • DET status (Hayama, 15min)
      • Measurement of Schumann Resonance(Atsuta, Kataoka,15min)
      • Water study (Measurement: Shikano, Theory: Somiya,15min)

15:50-16:05Break

PM3

(16:05-18:05) Chair:

  • Status report from subgroups V (75min)
    • VAC 15min x 1 (N. Ohishi)
    • MIR 15min x 1 ? (no reply)
    • LAS 15min x 1 ? (no reply)
    • AEL 15min x 1
    • DGS 15min x 4
    • TBD (TBA, 15min)
    • TBD (TBA, 15min)
    • TBD (TBA, 15min)
    • Hardware Injection (T. Yokozawa, 15min)

Banquet

August 27th (Sat)

AM1

(9:00-9:40) Chair:

  • KSC items (for KSC members, 40min, Prof. Hyung-Mok Lee leads)

(9:40-9:50) Break

AM2

(9:50-11:50) Chair:

  • Status report from subgroups VI
    • DMG 15min x 3
      • Main data storage & DMG roadmap (Kanda,15min)

      • Data transfer system (Sakai,15min)
      • TBD (Oohara,15min)
    • DAS 15min x 5
      • Status (H. Tagoshi, 15min)
      • TBD (T. Yuzirihara, 15min)
      • TBD (Joengcho Kim, 15min)
      • Continuous wave search using the iKAGRA data (Eda, 15min)
      • TBD (T. Yamamoto, 15min)

(11:50-13:00) Lunch

PM

(13:00-15:00) Chair:

  • iKAGRA publication plan (20+20min)
  • Safety rules & lecture (20min)

  • Organization (10min each, 30min)
    • Document and drawings
    • CPC (R. Flaminio)
    • Authorship
  • Report from IBR members (15min+5min)
  • Summary (10min)

LCGT/Meeting/f2f/2016Aug (last edited 2017-02-09 12:21:10 by YousukeIto)