Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2019-04-14 17:28:59
Size: 52
Comment:
Revision 4 as of 2019-04-14 17:40:58
Size: 2085
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Describe LCGT/Meeting/f2f/2019Apr/CalRelated here. = Satellite Meeting on Calibration and related grants projects =

Date : April/22
Time : 9:00 - 15:30
Place : the same room with F2F.

Presentation registration of the satellite meeting should be made directly to Calibration subgroup and leader of related grants ; kanda\_at\_sci.osaka-cu.ac.jp, tomaru\_at\_post.kek.jp, iyuki\_at\_post.kek.jp

= Discussion Program and Agenda =

== 1. Calibration and hardware related issues ==

We would like to have general discussion on the KAGAR calibration, $h(t)$ reconstruction and hardware related issues.

=== 9:00-12:00 Remark and Sharing the Current Status of calibration around O3 ===
chair: T.Tomaru

 * Current Status (Y.Inoue)
 * ''end-to-end'' of KAGRA calibration
 * '''Flow chart of works and dedicated persons'''
  * Who is working on What/How ?

 * ''Remark the goal/target of O3''
 * goal / target !?
 * Q: Are we ready for O3 ?
  * prepared/finished items: , , , ,
  * remain items : , , , ,
  * options : , , ,

(break)

 * GW (Gravitational Wave) Metrology Workshop report, home works (Y.Inoue)
 * LVK cross check
 * Toward O4
 * Preparation for O4
 * How /What goal for the finish of O4 in KAGRA ?



=== 13:00-14:00 Technical issues on h(t) reconstruction ===
chair : N.Kanda

 * Hardware conditions/evaluations (con't for discussion in a.m.)

 * ''Proc. Data'' (T.Yamamoto and/or T.Sawada)
 * C1#
  * Filter design
  * Expected quality
  * Latency
  * variation of files, i.e. length, recorded channels, etc.
  * decisions for O3

 * C2#
  * Target quality
  * Cadence of offline generation
  * Necessary items for C2#

 * ''Data files'' (N.Kanda)
 * Data flow overview
 * Variations including low latency files

== 2. Data Analysis related with Calibration ==
chair : Y.Inoue

=== 14:15-15:30 ===
 * GW waveform injection (T.Sawada)
 * Simulation (S.Tsuchida)
 * Analysis topics related with calibration

== 3. Grants strategy (closed session) ==
=== 15:30- (Until 17:00 in late case.) : ===
''This is closed session for grant member only.''
 

Satellite Meeting on Calibration and related grants projects

Date : April/22 Time : 9:00 - 15:30 Place : the same room with F2F.

Presentation registration of the satellite meeting should be made directly to Calibration subgroup and leader of related grants ; kanda\_at\_sci.osaka-cu.ac.jp, tomaru\_at\_post.kek.jp, iyuki\_at\_post.kek.jp

Discussion Program and Agenda

We would like to have general discussion on the KAGAR calibration, $h(t)$ reconstruction and hardware related issues.

9:00-12:00 Remark and Sharing the Current Status of calibration around O3

chair: T.Tomaru

  • Current Status (Y.Inoue)
    • end-to-end of KAGRA calibration

    • Flow chart of works and dedicated persons

      • Who is working on What/How ?
  • Remark the goal/target of O3

    • goal / target !?
    • Q: Are we ready for O3 ?
      • prepared/finished items: , , , ,
      • remain items : , , , ,
      • options : , , ,

(break)

  • GW (Gravitational Wave) Metrology Workshop report, home works (Y.Inoue)
  • LVK cross check
  • Toward O4
    • Preparation for O4
    • How /What goal for the finish of O4 in KAGRA ?

13:00-14:00 Technical issues on h(t) reconstruction

chair : N.Kanda

  • Hardware conditions/evaluations (con't for discussion in a.m.)
  • Proc. Data (T.Yamamoto and/or T.Sawada)

    • C1#
      • Filter design
      • Expected quality
      • Latency
      • variation of files, i.e. length, recorded channels, etc.
      • decisions for O3
    • C2#
      • Target quality
      • Cadence of offline generation
      • Necessary items for C2#
  • Data files (N.Kanda)

    • Data flow overview
    • Variations including low latency files

chair : Y.Inoue

14:15-15:30

  • GW waveform injection (T.Sawada)
  • Simulation (S.Tsuchida)
  • Analysis topics related with calibration

3. Grants strategy (closed session)

15:30- (Until 17:00 in late case.) :

This is closed session for grant member only.

LCGT/Meeting/f2f/2019Apr/CalRelated (last edited 2019-04-22 15:07:03 by TakahiroYamamoto)