For this subsystem, the complete installation means that it is installed '''''and verified'''''.
Line 57: Line 58:
At least, this system is indispensable for the initial alignment of beam lines. This system is indispensable for the initial alignment of beam lines, so at least it should be installed and tested by 201x.

Automatic Target System

Related subgroups: VAC, MIF(initial Alignment, Instrument Control), DGS


..Up

Scope

The scope of Automatic Target System is to provide targets on the way of a beam line, and to be used for the alignment of the beam line in the interferometer. This system helps commissioning phase, and will be turned off during the observation mode.

For example, each arm cavity should have this system. Several targets will be located in the arm tube, and have an accessible human interface for operators to easily and remotely turn them on/off from the center room.

Applicable Documents

None.

General Description

This kind of system has been already developed and practically used in TAMA300. Each unit of target system consists of an liner feed-through (as a manipulator) and a circle plate (as a target head) with a center hole, where a part of beam can pass through even when the target is tuned on. The linear feed-through is driven by pressure air then.

For KAGRA, the motion drive source will be a motor(?).

Functions

TBD

Naming Conventions

TBD

Locations

  • X-arm tube
  • Y-arm tube

For each arm, preliminary locations of targets is shown in JGW-T1200816

Requirements

  • It should be remotely turned on/off.
  • It should be viewable (not necessarily visual) when the target head is illuminated by IR/green lasers. Note that these laser powers for initial alignment would be somewhat smaller.

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

== Installation plan== For this subsystem, the complete installation means that it is installed and verified. The targets will be installed along with vacuum chambers. This system is indispensable for the initial alignment of beam lines, so at least it should be installed and tested by 201x.