Differences between revisions 19 and 20
Revision 19 as of 2012-09-16 20:36:13
Size: 2205
Editor: KiwamuIzumi
Comment:
Revision 20 as of 2012-09-16 20:38:56
Size: 2239
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
The scope of Automatic Target System is to provide targets on the way of a beam line,
and to be used for the alignment of the beam line in the interferometer.
This system helps commissioning phase, and will be turned off during the observation mode.
 . The scope of Automatic Target System is to provide targets on the way of a beam line, and to be used for the alignment of the beam line in the interferometer.
 . This system helps commissioning phase, and will be turned off during the observation mode.
Line 12: Line 11:
For example, each arm cavity should have this system.
Several targets will be located in the arm tube,
and have an accessible human interface for operators
to easily and remotely turn them on/off from the center room.
 . For example, each arm cavity should have this system. Several targets will be located in the arm tube, and have an accessible human interface for operators to easily and remotely turn them on/off from the center room.
Line 18: Line 14:
None.  . None.
Line 21: Line 17:
This kind of system has been already developed and practically used in TAMA300.
Each unit of target system consists of an liner feed-through (as a manipulator) and a circle plate (as a target head) with a center hole,
where a part of laser beam can pass through even when the target is tuned on.
The linear feed-through is driven by pressure air then.
 . This kind of system has been already developed and practically used in TAMA300.
 . Each unit of target system consists of an liner feed-through (as a manipulator) and a circle plate (as a target head) with a center hole, where a part of laser beam can pass through even when the target is tuned on. The linear feed-through is driven by pressure air then.
Line 26: Line 20:
For KAGRA, the motion drive source will be an electric motor(?).  . For KAGRA, the motion drive source will be an electric motor(?).
Line 29: Line 23:
TBD  . TBD
Line 32: Line 26:
TBD  . TBD
Line 37: Line 31:
For each arm, preliminary locations of targets is shown in [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=816|JGW-T1200816]]  . For each arm, preliminary locations of targets is shown in [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=816|JGW-T1200816]]
Line 46: Line 40:
TBD  . TBD
Line 50: Line 44:
TBD  . TBD
Line 53: Line 47:
TBD  . TBD
Line 56: Line 50:
For this subsystem, the complete installation means that it is installed '''''and verified'''''.
The targets will be installed along with vacuum chambers.
This system is indispensable for the initial alignment of beam lines, so at least it should be installed and tested by 201x.
 . For this subsystem, the complete installation means that it is installed '''''and verified'''''. The targets will be installed along with vacuum chambers. This system is indispensable for the initial alignment of beam lines, so at least it should be installed and tested by 201x.

Automatic Target System

Related subgroups: VAC, MIF(Initial Alignment, Instrument Control), DGS


back to AOS top

Scope

  • The scope of Automatic Target System is to provide targets on the way of a beam line, and to be used for the alignment of the beam line in the interferometer.
  • This system helps commissioning phase, and will be turned off during the observation mode.
  • For example, each arm cavity should have this system. Several targets will be located in the arm tube, and have an accessible human interface for operators to easily and remotely turn them on/off from the center room.

Applicable Documents

  • None.

General Description

  • This kind of system has been already developed and practically used in TAMA300.
  • Each unit of target system consists of an liner feed-through (as a manipulator) and a circle plate (as a target head) with a center hole, where a part of laser beam can pass through even when the target is tuned on. The linear feed-through is driven by pressure air then.
  • For KAGRA, the motion drive source will be an electric motor(?).

Functions

  • TBD

Naming Conventions

  • TBD

Locations

  • X-arm tube
  • Y-arm tube
  • For each arm, preliminary locations of targets is shown in JGW-T1200816

Requirements

  • It should be remotely turned on/off.
  • It should be viewable (not necessarily visual) when the target head is illuminated by IR/green lasers. Note that these laser powers for initial alignment would be somewhat smaller.

Characteristics

  • TBD

Inspection plans

  • TBD

Procurement process and plans

  • TBD

Installation plan

  • For this subsystem, the complete installation means that it is installed and verified. The targets will be installed along with vacuum chambers. This system is indispensable for the initial alignment of beam lines, so at least it should be installed and tested by 201x.

LCGT/subgroup/AOS/BeamTarget1 (last edited 2012-09-16 20:38:56 by KiwamuIzumi)