= Initial Alignment = | = [OBSOLETE] Initial Alignment = |
Line 7: | Line 7: |
The scope of ''Initial Alignment'' is to determine the procedure for initially aligning the LCGT main optics. | The scope of ''Initial Alignment'' is to determine the procedure for initially aligning the LCGT main optics as well as the main optical paths. |
Line 12: | Line 12: |
|| Determining the procedure || MIF || || | || Determining the procedure || MIF/Aso || || |
[OBSOLETE] Initial Alignment
Related subgroups: MIF, IOO, VAC, CRY, VIS
Contents
Scope
The scope of Initial Alignment is to determine the procedure for initially aligning the LCGT main optics as well as the main optical paths. This task also includes procurement of tools required for the pursuance.
Activity Allocation
Activities |
Assinged to |
Memo |
Determining the procedure |
MIF/Aso |
|
Procurement of tools |
|
Autocollimator? |
Applicable Documents
None.
General Description
It is important. This needs to be determined before the LCGT installation.
Requirements
TBD
Characteristics
TBD
Inspection plans
TBD
Procurement process and plans
TBD