Line 23: | Line 23: |
* Asked Bin-Hua to bring parts. | * Ordering parts. |
Line 25: | Line 25: |
* Relay is suspected. Will confirm using tester. * Asked Bin-Hua to bring parts. * Interlock equipment * Switch is equipped to modules. * Connector between chassis and laser system is repaired. |
* Relay is OK. Investigating the cause. * Asked Bin-Hua to bring relay. |
Line 35: | Line 32: |
* Check DAC input between MEDM and actual | * DAC input bias between MEDM and actual |
Line 54: | Line 51: |
* Ordered. Will arrive Kamioka on 9/10. | * Ordered. Will arrive Kamioka on 9/11. |
Line 58: | Line 55: |
* Waiting for new post. | * New post arrived. To be set. |
Line 76: | Line 73: |
Detailed task list of PCal is listed here.
X-end PCal
Urgent
- TxPD1 repairing
- THS4631 seems broken
- Ordering parts.
- OFS2 closed loop functionality repairing
- Relay is OK. Investigating the cause.
- Asked Bin-Hua to bring relay.
- DAC noise problem
- With DAC cable, very large noise and offset are observed. It may be difficult to set working point.
2nd-urgent
- DAC input bias between MEDM and actual
- Laser remote control
- PC will be setup.
- Same script as in Y-end may be applicable.
- Stray light
- Put dumpers
- Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
- Put dumpers
- WSK measurement
- Alignment of the last 2 mirrors (Accidentally moved)
- Modification is required from LIGO's procedure.
- Code for WSK measurement analysis
- To be delivered on 9/19 or 20.
- May have to prepare voltage calibrator to calibrate readout by DGS.
~9/11
- Periscope install
- Equip picomoters to the mirror
- Wall between duct and modules
- Ordered. Will arrive Kamioka on 9/11.
- Set duct and wall.
- Green laser preparation
- Power supplies are OK.
- New post arrived. To be set.
- TCam has to come back.
- PC has to be re-installed.
~JPS meeting 9/14
- AOM response measurement
- Check working point is consistent to that in KEK
- OL/CL TF measurement
- RPN measurement
- Laser noise measurement
- Harmonics noise measurement
- VGA noise measurement
- Excitation noise measurement
- Peak stability test
- Shot noise
- Offset input noise
- Noise model
~9/28
- Complete periscope install
- Rx module alignment
~X-arm commissioning line injection
- BPM test
- Picomoter setting
- Preparation for X-arm commissioning calibration line injection
~O3
- Unstable D-sub connection at Tx module
- Some connectors are dead.
- Cable arrangement
- OFS upgrade
- Operation tool preparation
Bonus work
- AOM current
- Sometimes over 0.5 V ?
- Take care about grounding
- Initial laser power just after turned on seems too small ?
Pre-categorization
Y-end PCal