Line 20: Line 20:
 * Excitation port noise

Detailed task list of PCal is listed here.

X-end PCal

Urgent

  • Excitation port noise

2nd-urgent

  • Stray light
    • Tx PDs detect light even if the AOM input is almost 0.
    • Put dumpers
    • Module wall will be black coated.

~11/3 first test to inject PCal laser to the X-end test mass

  • Rx module alignment
    • Rx PD done.
    • QPD alignment
  • AOM response measurement
    • Done. To be checked periodically.
  • OL/CL TF measurement
    • Done.
    • OFS board gain seems strange.
    • Strange bump in AA/AI (~6 kHz)
  • WSK measurement
    • Code for WSK measurement analysis
    • X-end done, but it may affected by stray light.

~X-arm commissioning line injection

  • BPM test
  • Preparation for X-arm commissioning calibration line injection
    • Guardian

~O3

  • RPN measurement
  • Laser noise measurement
  • Harmonics noise measurement
  • VGA noise measurement
  • Excitation noise measurement
    • DGS part seems not noisy, but cause large noise when connected to the OFS.
  • Peak stability test
  • Shot noise
  • Offset input noise
  • Noise model
  • Unstable D-sub connection at Tx module
    • Some connectors are dead.
  • Cable arrangement
  • OFS upgrade
  • Operation tool preparation

Bonus work

  • AOM current
    • Sometimes over 0.5 V ?
  • Take care about grounding
  • Initial laser power just after turned on seems too small ?

Pre-categorization

Y-end PCal

  • Periscope re-installation

Laser power calibration setting in Toyama Univ.

~Y-arm commissioning

  • Prepare cross calibration setup and calibrate an integrating sphere