Differences between revisions 5 and 29 (spanning 24 versions)
Revision 5 as of 2018-09-06 11:34:04
Size: 2508
Comment:
Revision 29 as of 2018-11-22 09:41:33
Size: 2022
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
=X-end PCal= = X-end PCal =
Line 19: Line 19:
 * TxPD1 repairing
  * THS4631 seems broken
  * Asked Bin-Hua to bring parts.
 * OFS2 closed loop functionality repairing
  * Relay is suspected. Will confirm using tester.
  * Asked Bin-Hua to bring parts.
 * Interlock equipment
  * Switch is equipped to modules.
  * Connector between chassis and laser system is repaired.
 * Unstable D-sub connection at Tx module
  * Some connectors are dead.
 * Cable arrangement
 * Laser remote control
  * PC will be setup.
  * Same script as in Y-end may be applicable.
Urgent
 * Excitation port noise

2nd-urgent

 * Stray light
  * Tx PDs detect light even if the AOM input is almost 0.
  * Put dumpers

~11/3 first test to inject PCal laser to the X-end test mass

 * Rx module alignment
  * QPD alignment
 * OL/CL TF measurement
  * OFS board gain seems strange. Saturation around 13 dB.
  * Strange bump in AA/AI (~6 kHz)

~X-arm commissioning line injection
Line 35: Line 39:
  * Picomoter setting
 * Periscope install
  * Equip picomoters to the mirror
  * Wall between duct and modules
   * Ordered. Will arrive Kamioka on 9/10.
  * Set duct and wall.
  * Green laser preparation
   * Power supplies are OK.
   * Waiting for new post.
  * Rx module alignment
  * TCam has to come back.
   * PC has to be re-installed.
 * AOM current
  * Sometimes over 0.5 V ?
 * Stray light
  * Put dumpers
   * Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
 * WSK measurement
  * Alignment of the last 2 mirrors (Accidentally moved)
  * Modification is required from LIGO's procedure.
  * Code for WSK measurement analysis
  * To be delivered on 9/19 or 20.
  * May have to prepare voltage calibrator to calibrate readout by DGS.
 * DAC noise problem
  * With DAC cable, very large noise and offset are observed. It may be difficult to set working point.
 * Take care about grounding
 * OL/CL TF measurement
 * Preparation for X-arm commissioning calibration line injection
  * Guardian

~O3
Line 67: Line 49:
  * DGS part seems not noisy, but cause large noise when connected to the OFS.
 * Peak stability test
 * Shot noise
 * Offset input noise
Line 68: Line 54:

 * Unstable D-sub connection at Tx module
  * Some connectors are dead.
Line 69: Line 58:
 * Operation tool preparation

Bonus work

 * AOM current
  * Sometimes over 0.5 V ?
 * Take care about grounding

Pre-categorization
Line 71: Line 69:
=Laser power calibration setting in Toyama Univ.= = Y-end PCal =

 * Periscope re-installation

=
Laser power calibration setting in Toyama Univ. =
Line 73: Line 75:
~Y-arm commissioning

 * Prepare cross calibration setup and calibrate an integrating sphere

Detailed task list of PCal is listed here.

X-end PCal

Urgent

  • Excitation port noise

2nd-urgent

  • Stray light
    • Tx PDs detect light even if the AOM input is almost 0.
    • Put dumpers

~11/3 first test to inject PCal laser to the X-end test mass

  • Rx module alignment
    • QPD alignment
  • OL/CL TF measurement
    • OFS board gain seems strange. Saturation around 13 dB.
    • Strange bump in AA/AI (~6 kHz)

~X-arm commissioning line injection

  • BPM test
  • Preparation for X-arm commissioning calibration line injection
    • Guardian

~O3

  • RPN measurement
  • Laser noise measurement
  • Harmonics noise measurement
  • VGA noise measurement
  • Excitation noise measurement
    • DGS part seems not noisy, but cause large noise when connected to the OFS.
  • Peak stability test
  • Shot noise
  • Offset input noise
  • Noise model
  • Unstable D-sub connection at Tx module
    • Some connectors are dead.
  • OFS upgrade
  • Operation tool preparation

Bonus work

  • AOM current
    • Sometimes over 0.5 V ?
  • Take care about grounding

Pre-categorization

Y-end PCal

  • Periscope re-installation

Laser power calibration setting in Toyama Univ.

~Y-arm commissioning

  • Prepare cross calibration setup and calibrate an integrating sphere

PcalTask (last edited 2018-11-22 09:41:33 by chihiro.kozakai)