Line 7: Line 7:
|| Compressor for cryocooler <<FootNote(24台×11kW)>> ||<)> 264kW || ×24×365×100% ||<)>2,312,640 kWh || || Compressor for cryocooler <<FootNote(11kW x24)>> ||<)> 264kW || ×24×365×100% ||<)>2,312,640 kWh ||

変電設備

配電盤

年間電力使用量試算 by Kuroda

Compressor for cryocooler 1

264kW

×24×365×100%

2,312,640 kWh

Computer w/ air conditioner

80kW

×24×365×100%

700,800 kWh

Vacuum pupm

50kW

×24×365× 5%

21,900 kWh

Measurement instruments

5kW

×12×365×100%

21,900 kWh

Air conditioner w/ HEPA

10kW

×12×365×100%

43,800 kWh

Lighting equipment

2kW

×24×365× 20%

3,504 kWh

Cooling water pump  

1kW

×24×365×100%

8,760 kWh

Vacuum tanks (center room)

1kW

×24×365×100%

8,760 kWh

Total sum.      

413kW

 3,122,064 kWh

  1. 11kW x24 (1)