1500
Comment:
|
2120
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
* KA 081218 example | |
Line 18: | Line 17: |
* [[CLIO/Plans/CoilDriver|アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End]] | |
Line 21: | Line 19: |
* [[CLIO/Plans/BeamCenter|粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End]] | |
Line 27: | Line 24: |
== To Do / To Buy == * [[CLIO/todo|To do List]] * [[CLIO/buy|買い物リスト]] * [[CLIO/mystery|CLIOの謎集]] |
== Pending Tasks == * MC WFS and beam orientation control (担当:我妻) * Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。 * BS pendulum modification (担当:三代木) * ST pendulum modification (担当:三代木) * Main suspension Y-stage installation (担当:内山) * アクチュエイター雑音低減・第2段(担当:辰巳) コイルアクチュエイター効率の低減 * デジタル化アナログフロントエンド・第2段(担当:辰巳) * Up-conversion noise investigation (担当:新井) * RF intensity noise investigation (担当:我妻) * Shadow sensor (担当:辰巳、高橋) == Past small Tasks == * [[CLIO/Plans/CoilDriver|アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End]] * [[CLIO/Plans/BeamCenter|粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6]] |
CLIO Project
Current top-priority tasks
マイルストーン: 常温での熱雑音感度の達成
- 熱雑音感度検証作業
マイルストーン: 低温での常温感度再現
- 低温化準備作業
マイルストーン: 低温での常温感度再現
- 低温時noise budget作成作業
Small Tasks & Schedules
Pending Tasks
- MC WFS and beam orientation control (担当:我妻)
- Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。
- BS pendulum modification (担当:三代木)
- ST pendulum modification (担当:三代木)
- Main suspension Y-stage installation (担当:内山)
- アクチュエイター雑音低減・第2段(担当:辰巳) コイルアクチュエイター効率の低減
- デジタル化アナログフロントエンド・第2段(担当:辰巳)
- Up-conversion noise investigation (担当:新井)
- RF intensity noise investigation (担当:我妻)
- Shadow sensor (担当:辰巳、高橋)