Line 17: Line 17:
 * [[CLIO/Plans/CoilDriver|アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End]]
Line 24: Line 23:
 * RF intensity noise investigation (担当:我妻)

== Pending Tasks ==
 * MC WFS and beam orientation control (担当:我妻)
 * Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。
 * BS pendulum modification (担当:三代木)
 * ST pendulum modification (担当:三代木)
 * Main suspension Y-stage installation (担当:内山)
 * [[CLIO/Plans/CoilDriver|アクチュエイター雑音低減・第2段(担当:辰巳) コイルアクチュエイター効率の低減]]
 * [[CLIO/Plans/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段(担当:辰巳)]]
 * Up-conversion noise investigation (担当:新井)
 * Shadow sensor (担当:辰巳、高橋)
Line 26: Line 37:
 * [[CLIO/Plans/BeamCenter|粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End]]

== To Do / To Buy ==
 * [[CLIO/todo|To do List]]
 * [[CLIO/buy|買い物リスト]]
 * [[CLIO/mystery|CLIOの謎集]]
 * [[CLIO/Plans/DigitalControl/AnalogFrontEnd|デジタル化アナログフロントエンド・第1段(担当:辰巳) due: 2009/3/End]]
 * [[CLIO/Plans/CoilDriver|アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End]]
 * [[CLIO/Plans/BeamCenter|粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6]]

CLIO Project

PROJECT

MEETING

SCHEDULES&TASKS

TECHNICAL

LINKS

HOWTO


Current top-priority tasks

  • マイルストーン: 常温での熱雑音感度の達成

    • 熱雑音感度検証作業
  • マイルストーン: 低温での常温感度再現

    • 低温化準備作業
  • マイルストーン: 低温での常温感度再現

    • 低温時noise budget作成作業

参考資料 6月ヒアリング資料(黒田)

Small Tasks & Schedules

Pending Tasks

Past small Tasks