Differences between revisions 34 and 48 (spanning 14 versions)
Revision 34 as of 2009-03-25 15:07:27
Size: 1531
Editor: whitehole
Comment:
Revision 48 as of 2009-06-14 09:07:09
Size: 2249
Editor: whitehole
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= CLIO Project =
||[[CLIO|PROJECT]] ||[[CLIO/Meeting|MEETING]] ||[[CLIO/Plans|SCHEDULES&TASKS]] ||[[CLIO/Technical|TECHNICAL]] ||[[CLIO/Links|LINKS]] ||[[CLIO/HowTo|HOWTO]] ||


----
Line 17: Line 12:
 * [[CLIO/Plans/CoilBobbin|コイルボビン (担当:鈴木、内山) due: 200X/XX/XX]]  * [[CLIO/Plans/CoilBobbin|コイルボビン]] (担当:内山) 75% done @ 2009/06/15 / due: 2009/09/End
Line 23: Line 18:
 * RF intensity noise investigation (担当:我妻)
 * BS pendulum modification (担当:三代木) start:2009/06
 * ST pendulum modification (担当:三代木) start:2009/06

== Pending Tasks ==
 * MC WFS and beam orientation control (担当:我妻)
 * Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。
 * Main suspension Y-stage installation (担当:内山)
 * [[CLIO/Plans/CoilDriver|アクチュエイター雑音低減・第2段(担当:辰巳) コイルアクチュエイター効率の低減]]
 * [[CLIO/Plans/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段(担当:辰巳)]]
 * Up-conversion noise investigation (担当:新井)
 * Shadow sensor (担当:辰巳、高橋)
Line 25: Line 32:
 * [[CLIO/Plans/DigitalControl/AnalogFrontEnd|デジタル化アナログフロントエンド・第1段(担当:辰巳) due: 2009/3/End]]
Line 28: Line 36:
== To Do / To Buy ==
 * [[CLIO/todo|To do List]]
 * [[CLIO/buy|買い物リスト]]
 * [[CLIO/mystery|CLIOの謎集]]
----
||[[CLIO|CLIO wiki Top]]||[[LCGT|LCGT wiki Top]]||

Current top-priority tasks

  • マイルストーン: 常温での熱雑音感度の達成

    • 熱雑音感度検証作業
  • マイルストーン: 低温での常温感度再現

    • 低温化準備作業
  • マイルストーン: 低温での常温感度再現

    • 低温時noise budget作成作業

参考資料 6月ヒアリング資料(黒田)

Small Tasks & Schedules

Pending Tasks

Past small Tasks


CLIO wiki Top

LCGT wiki Top

CLIO/Plans (last edited 2010-01-05 14:30:55 by DaisukeTatsumi)