Line 4: Line 4:
== Today's work plan: 2019/11/18 1PM - 2019/11/19 1PM ==

=== Afternoon ===
 * ASC work for measuring demodulation phase for AS using Y arm (Lucia, Ushiba, Nakano, Anamaria)
 * ISC meeting for ASC things from 2pm (Michimura leads)
 * OMC assembling for gluing a mirrro (Aso)
 * Modification for DAQ guardian (Yamamoto)
 * Pcal shutter (Yamamoto)

=== Evening ===
 * FPMI lock (Nakano)
  * Fix find resonance routine (Nakano)
 * PRMI lock (Nakano)
 * VIS noise budget (Lucia, Ushiba)
 * ETMY calibration (Ogaki)
 
=== Nov. 19 Morning ===
 * ASC work with MICH (Ushiba, Lucia, Anamaria)
 * Check BIO cable at BS (Yamamoto, Fabian)
 * ETMX measurement with misaligned state (Yamada)
 * ETMY measurement with misaligned state (Okutomi)


||Configuration||11/19 silent-run slot||Morning ||11/18 Afternoon ||Evening || ||
|| || || || || || ||
|| || || || || || ||
|| || || || || || ||
||PSL || || || || || ||
||IMC || || || || || ||
||X-arm || || ||ASC || || ||
||Y-arm || || ||ASC || || ||
||MICH || ||ASC || || || ||
||ALS-DARM || || || || || ||
||FPMI || || ||Nakano ||Nakano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || ||Yamada || || || ||
||ETMY || ||Okutomi || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||POP port || || || || || ||
||AS port || || || || || ||


------


== Today's work plan: 2019/11/15 1PM - 2019/11/18 1PM ==

=== Afternoon ===
 * ASC work for Y arm or X arm (Eleonora, Lucia, K.Tanaka)
 * Fixing phase noise cancel for both X, Y green (Nakano)
 * ISS noise measurement (Yoshioka, Miyakawa)
 * PEM turn on vacuum pump aound 3pm (Yokozawa, Washimi)
 * Entering PSL shortly (Kokeyama)
 * Laser power for PCal needs EX alignment (Yamamoto)

=== Evening ===
 * FPMI lock (Nakano)
 
=== Weekend ===
 * FPMI lock (Nakano)
 * VIS noise budget (Lucia, Ushiba)
 * Type A measurement on Saturday morning (Fujii)
 * PEM measurement with FPMI on Sunday daytime
 * ETMX calibration on Sunday mornintg (Ogaki)
 * Injection of cal line during silent run (Yamamoto)
 * Implementation roll off filter (Yamada)

=== Nov. 18 Morning ===
 * Maintenance of DGS for replacing power supply, needs Type B and Type Bp in the safe mode (Oshino, Yamamoto)
 * ASC work for demodulation phase tuning (Ushiba, Lucia, Terrencer)
 * PEM work around ISS table (Yokozawa)
 * OMC assembling for gluing mirror (Aso)
 * Stopping cryocooler at ETMX shield without closing gate valve (Tomaru)


||Configuration||11/18 silent-run slot||Morning ||11/15 Afternoon ||Evening ||Weekend ||
|| || || || || || ||
|| || ||DGS maintenance || || ||VIS noise budget, Type A measurement, Injection ||
|| || || || || || ||
||PSL || || ||Kokeyama || || ||
||IMC || || || || || ||
||X-arm || ||ASC ||ASC, PCal || || ||
||Y-arm || ||ASC ||ASC || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || ||ASC ||Nakano ||Nakano, Yamada ||Nakano, Yamada ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || ||Tomaru ||PCal || ||Ogaki on Sun. morning||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||POP port || || || || || ||
||AS port || || || || || ||


------

== Today's work plan: 2019/11/14 1PM - 2019/11/15 1PM ==

=== Afternoon ===
 * OMC work (Aso)
 * Double demodulation work (Kokeyama, Koyama)

=== Evening ===
 * FPMI lock (Nakano)

=== Nov. 15 Morning ===
 * ASC work for FPMI (Eleonora, Lucia, K.Tanaka)
 * ISS whitening installation (Yoshioka, Miyakawa)
 * Double demodulation work (Kokeyama, Koyama)
 * PEM work around ISS table (Yokozawa)
 * Temperature tuning for EYC and IXV (Miyoki)

||Configuration||11/15 silent-run slot||Morning ||11/14 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || || || || || ||
||IMC || || || || || ||
||X-arm ||ASC || ||ASC || || ||
||Y-arm ||ASC || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI ||ASC || ||Nakano ||Nakano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || ||ASC || || ||
||POP port || || ||ASC || || ||
||AS port || || || || || ||


------


== Today's work plan: 2019/11/13 1PM - 2019/11/14 1PM ==

=== Afternoon ===
 * Restarting TMS model and DAQ (K.Tanaka)
 * Fix REFL QPD for ASC in the mine (Eleonora, Lucia)
 * Arranging POP optical layout (Kokeyama, Terrence)
 * Cooler maintenance for PSL room (Hayakawa)
 * FPMI lock trial to fix CALM in the mine(Nakano)
 * OMC work (Aso)

=== Evening ===
 * FPMI lock trial (Nakano)

=== Nov. 14 Morning ===
 * ASC test with X arm (Eleonora, Lucia, K.Tanaka)
 * Double demodulation work (Kokeyama, Koyama)
 * Assembling OMC (Aso)
 * Cable work at EY (Yamada)
 * Removing accelerometer (Washimi)


||Configuration||11/14 silent-run slot||Morning ||11/13 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || || || || || ||
||IMC || || || || || ||
||X-arm ||ASC || ||ASC || || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || || ||Nakano ||Nakano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY ||Wasnimi, Yamada || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || ||ASC || || ||
||POP port || || ||ASC || || ||
||AS port || || || || || ||


------

== Today's work plan: 2019/11/13 1PM - 2019/11/14 1PM ==

=== Afternoon ===
 * Restarting TMS model and DAQ (K.Tanaka)
 * Fix REFL QPD for ASC in the mine (Eleonora, Lucia)
 * Arranging POP optical layout (Kokeyama, Terrence)
 * Cooler maintenance for PSL room (Hayakawa)
 * FPMI lock trial to fix CALM in the mine(Nakano)
 * OMC work (Aso)

=== Evening ===
 * FPMI lock trial (Nakano)

=== Nov. 13 Morning ===
 * ASC test with X arm (Eleonora, Lucia, K.Tanaka)
 * Assembling OMC (Aso)
 * ISS work (Yoshioka)



||Configuration||11/14 silent-run slot||Morning ||11/13 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || || || || || ||
||IMC || || || || || ||
||X-arm ||ASC || ||ASC || || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || || ||Nakano ||Nakano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || ||ASC || || ||
||POP port || || ||ASC || || ||
||AS port || || || || || ||


------

== Today's work plan: 2019/11/12 1PM - 2019/11/13 1PM ==

=== Afternoon ===
 * Fix X arm lock for IR (Ushiba, Yokozawa, Nakano)
 * FPMI lock trial (Nakano)
 * Alignment check for X arm (Kokeyama, Terrence)
 * ASC test with X arm (Eleonora, Lucia, K.Tanaka)

 * Fix green instability (Nakano, Miyakawa)
 * ISS measurement in mine (Yoshioka, Miyakawa)
 * OMC work (Aso)

=== Evening ===
 * Fix green instability (Nakano, Miyakawa)
 * FPMI lock trial (Nakano)

=== Nov. 13 Morning ===
 * ASC test with X arm (Eleonora, Lucia, K.Tanaka)
 * Assembling OMC (Aso)

 * ISS Guardian test (Miyakawa)
 * PEM work for 46Hz hunting (Yokozawa)



||Configuration||11/13 silent-run slot||Morning ||11/12 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || || || || || ||
||IMC || || || || || ||
||X-arm ||ASC || ||ASC || || ||
||Y-arm || || || || || ||
||MICH ||ASC || || || || ||
||ALS-DARM || || || || || ||
||FPMI || || ||Nakano ||Nakano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX ||Tomaru || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||


------


== Today's work plan: 2019/11/11 1PM - 2019/11/12 1PM ==

=== Afternoon ===
 * Fix green instability (Nakano, Yamamoto)
 * ASC test with X arm (Eleonora, Lucia, K.Tanaka)
 * FPMI lock trial (Nakano, Yamamoto)
 * ISS measurement in mine (Yoshioka)
 *

=== Evening ===
 * Fix green instability (Nakano, Yamamoto)
 * FPMI lock trial (Nakano, Yamamoto)


=== Nov. 12 Morning ===
 * Measurement for Type A from 6am (Fujii)
 * ASC test with X arm (Eleonora, Lucia, K.Tanaka)
 * Preparation for OMC work (Aso)
 * ISS Guardian test (Yoshioka, Miyakawa)
 * Changing valve unit for IXC (Tomaru)
 * Assembling OMC (Aso)


||Configuration||11/12 silent-run slot||Morning ||11/11 Afternoon ||Evening || ||
|| || || || || || ||
|| ||Type A, Fujii || || || || ||
|| || || || || || ||
||PSL || || ||Nakano || || ||
||IMC || || || || || ||
||X-arm ||ASC || ||ASC || || ||
||Y-arm || || || || || ||
||MICH ||ASC || || || || ||
||ALS-DARM || || || || || ||
||FPMI || || || || || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX ||Tomaru || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||

------

== Today's work plan: 2019/11/8 1PM - 2019/11/11 1PM ==

=== Afternoon ===
 * FPMI lock trial (Nakano, Takano)
 * Closing ASC loop for X arm until 3pm (Eleonora, Lucia, K.Tanaka, Ushiba)
 * Pcal calibration for X arm necessary ETMX alignment from 2pm to 4pm (Inoue, Darkhan)
 * ISS Guardian test (Miyakawa)

=== Evening ===
 * FPMI lock trial (Nakano, Takano)

=== Weekend ===
 * FPMI lock trial (Nakano, Takano)
 * MC work for replacing FSS (Nakano)
 * Type A measurement with FPMI (Fujii)

=== Nov. 11 Morning ===
 * DGS maintenance.
  * Jumper setting for ETMX HPCD (Shimode, Yamamoto)
  * Replacement DC power supply for PRM and PR3 (Tomura, Kamiizumi)
  * Exchanging FW1 computer (Oshino)
 * Checking ground loop TMSX and TMSY (Yokozawa, T.Tanaka)
 * Modifying RT model for all Type A, needs safe mode (Okutomi, Yamada)
 * Preparation for OMC work (Aso)

||Configuration||11/11 silent-run slot||Morning ||11/8 Afternoon ||Evening ||Weekend ||
|| || ||Maintenance || || || ||
||PSL || || ||ASC ~3pm || || ||
||IMC || || ||ASC ~3pm || ||Nakano ||
||X-arm || || || || || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || || ||LSC 3pm~ ||LSC ||LSC ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || ||Pcal || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||


------

== Today's work plan: 2019/11/7 1PM - 2019/11/8 1PM ==

=== Afternoon ===
 * Fixing PLL for GRX (Matteo, Aso)
 * Closing ASC loop for X arm (Eleonora, Lucia, K.Tanaka)
 * Assembling OSTM (Takahashi)
 * Measurement on IMC for FSS (Nakano)
 * OMC assembly (Aso)
 * Absolute power measurement for PCal at ETMY (Inoue, Darkhan)

=== Evening ===
 * Fixing PLL (Takano, Matteo)

=== Nov. 8 Morning ===
 * Fixing PLL for AOM alignment to avoid coupling PDH to intensity (Takano, Matteo)
 * Alignment check for ASC QPD (Eleonora, Lucia, Ushiba)


||Configuration||11/8 silent-run slot||Morning ||11/7 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || ||Nakano, Takano ||Matteo || || ||
||X-arm || || ||Kokeyama || || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || || || ||Nakano, Takano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||


------

== Today's work plan: 2019/11/6 1PM - 2019/11/7 1PM ==

=== Afternoon ===
 * Closing ASC loop for X arm (Eleonora, Lucia)
 * Fixing PLL for GRX (Matteo, Aso)
 * Assembling OSTM (Takahashi)
 * AEL team investigate the location for storage (Tomura, Shimode, Miyakawa)
 * Check network cables in central area (Miyakawa)
 * Fixing Type A saturation by temperature drift (Lucia, Okutomi)

=== Evening ===
 * Fixing PLL (Takano, Matteo)

=== Nov. 7 Morning ===
 * OSTM (Takahashi)
 * Fixing PLL (Takano, Matteo)
 * OMC assembly (Aso)
 * Fixing temperature sensor check at End stations (Yamada)
 * Closing ASC loop for X arm (Eleonora, Lucia)


||Configuration||11/7 silent-run slot||Morning ||11/6 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || ||Aso, Takano ||Matteo || || ||
||X-arm || || ||Kokeyama || || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || || || ||Nakano, Takano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||


------


== Today's work plan: 2019/11/5 1PM - 2019/11/6 1PM ==

=== Afternoon ===
 * FSS investigation for oscillation ~80MHz to avoid slew rate limit (Nakano, Takano)

=== Evening ===
 * ASC phasing for RELF using X arm (Kokeyama, Lucia, Eleonora)

=== Nov. 6 Morning ===
 * ASC work (Eleonora, Lucia)
 * Fixing PLL for GRX (Matteo)
 * Fixing Type A saturation by temperature drift (Lucia)
 * Fixing temperature monitor (Oshino, Yokozawa, Jaewan, Seojoon)
 * OMC assembly (Aso)
 * PRM misalign investigation (Fabian)


||Configuration||11/6 silent-run slot||Morning ||11/5 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || ||Matteo ||Nakano || || ||
||X-arm || ||Eleonora ||Kokeyama ||Kokeyama || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || || || || || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || ||Fabian || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||


------


== Today's work plan: 2019/11/1 1PM - 2019/11/5 1PM ==

=== Afternoon ===
 * Gain adjustment for PD at both end (Takano, Yokozawa)
 * Check PRM with aligned state (Shoda)
 * Keeping FPMI locked (Takano, Ushiba, Aso)
 * ISS measurement (Yoshioka, Miyakawa)
 * TMS TF measurement using on QPD (K.Tanaka)

=== Evening ===
 * FPMI lock (Takano, Aso)
 * TMS TF measurement using on QPD (K.Tanaka)
 * Measurement for Type A remotely in the night (Fujii)
 * ETMX and ITMX actuator efficiency (Yamamoto)

=== Weekend ===
 * Saturday
  * Yokozawa, Yamamoto
  * PEM acoustic or coil injection (T.Tanaka)

 * Sunday
  * Takano, Kokeyama, Yokozawa, Yamamoto, Miyakawa
  * Measurement for Type A remotely in the night (Fujii)
  * WFS work (Kokeyama)
  * MICH calibration (Yamamoto)

 * Monday
  * Takano, Kokeyama, Yokozawa, Yamamoto, Aso
  * WFS work (Kokeyama)
  * Measurement for Type A remotely in the night(Fujii)
  * MICH calibration (Yamamoto)

 * FPMI lock (Takano, Aso)
 * TMS TF measurement using on QPD (K.Tanaka)
 * ETMX and ITMX actuator efficiency (Yamamoto)


=== Nov. 5 Morning ===
 * FPMI lock (Takano, Ushiba)


||Configuration||11/1 silent-run slot||Morning ||11/1 Afternoon ||Evening ||Weekend ||
|| || || || || || ||
||PSL || || || || || ||
||X-arm || || || || || ||
||Y-arm || || || ||Yamamoto || ||
||MICH || || || || ||Yamamoto ||
||ALS-DARM || || || || || ||
||FPMI || ||Takano ||Takano, K.Tanaka ||Takano, K.Tanaka ||Takano, Kokeyama, K.Tanaka ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || ||Fujii, Yamamoto ||Fujii, Yamamoto ||
||ITMY || || || ||Fujii, ||Fujii ||
||ETMX || ||Takano ||Takano ||Fujii, Yamamoto ||Fujii, Yamamoto ||
||ETMY || ||Takano ||Takano ||Fujii ||Fujii ||
||PRM || ||Fabian ||Shoda || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||


------


== Today's work plan: 2019/10/31 1PM - 2019/11/1 1PM ==

=== Afternoon ===
 * FPMI lock for CALM hand off (Takano, Ushiba)
 * ISS circuit check and installation (Miyakawa, Yoshioka)
 * PCal measurement at Xend (Wshimi, Ito)
 * TMS TF measurement using on QPD (K.Tanaka)

=== Evening ===
 * FPMI lock (Takano, Aso)
 * TMS TF measurement using on QPD (K.Tanaka)
 * ETMX and ITMX actuator efficiency (Yamamoto)

=== Nov. 1 Morning ===
 * Tuning off test vacuum pump (Yokozawa, Saito)
 * Installation of ISS (Yoshioka, Miyakawa)
 * Gain adjustment for PD at both end (Takano, Yokozawa)
 * Modify Guardian script for PRM misaligned state (Fabian, Shoda)
 * FPMI lock (Takano, Ushiba)


||Configuration||11/1 silent-run slot||Morning ||10/31 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || || || || || ||
||X-arm || || || || || ||
||Y-arm || || || ||Yamamoto || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || ||Takano ||Takano ||Takano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || ||Yamamoto || ||
||ITMY || || || || || ||
||ETMX || ||Takano || ||Yamamoto || ||
||ETMY || ||Takano || || || ||
||PRM || ||Fabian || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||

------

== Today's work plan: 2019/10/30 1PM - 2019/10/31 1PM ==

=== Afternoon ===
 * FPMI lock for CALM/DARM hand off (Takano, Ushiba)
 * ISS circuit check (Miyakawa)


=== Evening ===
 * FPMI lock (Takano, Aso)
 * Actuator efficiency measurement for ITMY and ETMY (Yamamoto)
 * Type A measurement (Fujii)

=== Oct. 31 Morning ===
 * Duct cooler on/off test for IXC chamber (Washimi, Tomaru)
 * Investigating oplev mount by touching (Tomaru)
 * Measurement of 24Hz for IY0 (Yokozawa, TN.Tanaka)
 * Modification for ISS board (Yoshioka, Miyakawa)
 * Investigation for PRM misaligned state (Fabian)
 * Filter test for Type A (Licia)
 * FPMI lock (Takano, Ushiba)


||Configuration||10/31 silent-run slot||Morning ||10/30 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || || || || || ||
||X-arm || || || || || ||
||Y-arm || || || || || ||
||MICH || || || ||Yamamoto || ||
||ALS-DARM || || || || || ||
||FPMI ||Yokozawa ||Takano ||Takano ||Takano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || ||Lucia || ||Yamamoto, Fujii || ||
||ITMY || ||Lucia || ||Fujii || ||
||ETMX || ||Lucia || ||Yamamoto, Fujii || ||
||ETMY || ||Lucia || ||Fujii || ||
||PRM || ||Fabian || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || ||Takano || || ||
||AS port || || || || || ||


------


== Today's work plan: 2019/10/29 1PM - 2019/10/30 1PM ==

=== Afternoon ===
 * Replacing PDA1 on RELF table (Takano, Ushiba)
 * FPMI lock (Takano, Aso)
  * Investigation for noise injection from REFL PD.
 * ISS work outside of PSL room (Yoshioka)
 * Checking fan on/off test at SR booth in short time (Washimi)
 * Measurement of magnetic field of 18V power supply for circulator (Yokozawa, TN.Tanaka)


=== Evening ===
 * FPMI lock (Takano, Aso)
 * Measurement for VIS (Fujii)
 * Measurement for actuator efficiency for ITM, ETMY (Yamamoto)

=== Oct. 30 Morning ===
 * Measurement among some sensors using IFO (Yokozawa, Tanaka)
 * ISS circuit modification to shift integrator frequency lower (MiyakawaY)
 * Investigation PRM misalign state (Fabian)
 * FPMI lock (Takano, Aso)


||Configuration||10/30 silent-run slot||Morning ||10/29 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || || || || || ||
||X-arm || || || || || ||
||Y-arm || || || || || ||
||MICH || || || ||Yamamoto || ||
||ALS-DARM || || || || || ||
||FPMI ||Yokozawa ||Takano ||Takano ||Takano || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || ||Yamamoto, Fujii || ||
||ITMY || || || ||Fujii || ||
||ETMX || || || ||Yamamoto, Fujii || ||
||ETMY || || || ||Fujii || ||
||PRM || ||Fabian || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || ||Takano || || ||
||AS port || || || || || ||


------

== Today's work plan: 2019/10/28 1PM - 2019/10/29 1PM ==

=== Afternoon ===
 * FPMI lock (Takano, Aso)
  * Alignment of Y arm for ETMY.
  * Remove clip of green on TMSY.
  * Investigation for noise injection from REFL PD.
  * Ground issue on REFL QPD.
 * Engage ISS in the PSL room (Yoshioka, Ushiba)
 * Checking fan on/off test at SR booth in short time (Washimi)
 * Measurement of magnetic field of 18V power supply (Yokozawa, TN.Tanaka)

=== Evening ===
 * FPMI lock (Takano, Aso)

=== Oct. 29 Morning ===
 * Replacing PDA1 on RELF table (Takano, Ushiba)
 * ISS work outside of PSL room (Yoshioka)
 * Maintenance gyro cooler at ETMY and ETMX (Kimura)
 * Measurement of magnetic field of 18V power supply (Yokozawa, Ito)
 * FPMI lock (Takano, Aso)


||Configuration||10/29 silent-run slot||Morning ||10/28 Afternoon ||Evening ||Weekend ||
|| || || || || || ||
||PSL || ||Yoshioka ||Yoshioka || || ||
||X-arm || || || || || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || ||Takano ||Takano ||Takano ||Takano ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||PR2 || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||


------

== Today's work plan: 2019/10/24 1PM - 2019/10/25 1PM ==

=== Afternoon ===
 * ALS DARM noise investigation (Takano, Izumi, Aso, Ushiba)
 * ISS circuit fix (Yoshioka, Ushiba)

=== Evening ===
 * ALS DARM noise investigation (Takano, Izumi, Aso, Ushiba)
 * FPMI lock (Takano, Ushiba, Izumi, Aso)

=== Oct. 25 Morning ===
 * Investigation of REFL table (Aso)
 * FPMI lock (Aso, Takano)
 * Fixing ISS board (Yoshioka, Shimode)
 * 46Hz investigation (Washimi, T.Tanaka)
 * Pcal maintenance (Inoue, Ito)
 * Exchanging one of the 16 fire detectors on ceiling ()
 * Investigate for the weak signal of ondotori (Yamamoto)

||Configuration||10/25 silent-run slot||Morning ||10/25 Afternoon ||Evening ||Weekend ||
|| || || || || || ||
||PSL || || || || || ||
||X-arm || || || || || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || ||Aso || || || ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || || || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || ||Inoue || || || ||
||ETMY || ||Inoue || || || ||
||PRM || || || || || ||
||SRM || || || || || ||
||REFL port || ||Aso || || || ||
||AS port || || || || || ||

------

== Today's work plan: 2019/10/23 1PM - 2019/10/24 1PM ==

=== Afternoon ===
 * REFL ASC commissioning using single arm for demod phase(Izumi, Lucia)
 * BS TF for ASC (Fabian)
 * ITMY for checking filters (Yamada)
 * ISS modification (Shimode)
 * FPMI lock (Takano)

=== Evening ===
 * FPMI lock (Takano)
 * Noise budget (Takano)
 * TF of TMS motion to TMS QPD (K.Tanaka)
 * OLTF measurement and ETM calibration with FPMI for 1 and half hour (Ogaki)

=== Oct. 24 Morning ===
 * FPMI lock (Takano)
 * ASC work (Izumi)
 * SR optimization (Fabian)
 * ISS implementation (Yshioka, Ushiba)


||Configuration||10/24 silent-run slot||Morning ||10/23 Afternoon ||Evening || ||
|| || || || || || ||
||PSL || ||Yoshioka || || || ||
||X-arm || || ||Izumi, Lucia || || ||
||Y-arm || || ||Yamada || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || ||Takano || ||Takano, K. Tanaka, Ogaki|| ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || ||Fabian ||Fabian || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||SRM || ||Fabian || || || ||
||REFL port || || ||Izumi, Lucia || || ||
||AS port || || || || || ||


------

== Today's work plan: 2019/10/21 1PM - 2019/10/23 1PM ==

=== Afternoon ===
 * ISS installation to PSL for short time (Yoshioka, Izumi)
 * Putting covers (Hayakawa)
 * X arm lock first, then Y arm lock (Kokeyama, Aso)
 * Camera man will enter the mine (Yokozwa)



=== Evening ===
 * FPMI lock (Takano)
 * Noise budget (Takano)
 * TF of TM motion to TMS QPD (K.Tanaka)
 * OLTF measurement and ETM calibration for 1 and half hour (Ogaki)

=== Oct.22 ===
 * FPMI lock (Takano)
 * VIS measurement with FPMI (Fujii)


=== Oct. 23 Morning ===
 * FPMI lock (Takano)
 * ASC work (Izumi)
 * BS optimization (Fabian)


||Configuration||10/23 silent-run slot||Morning ||10/21 Afternoon ||Evening ||10/22 ||
|| || || || || || ||
||PSL || || ||Yoshioka in short time|| || ||
||X-arm || ||Izumi, Lucia ||Kokeyama, Aso || || ||
||Y-arm || || ||Kokeyama, Aso || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI || ||Takano || ||Takano, K. Tanaka ||Takano, Fujii ||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || ||Fabian || || || ||
||ITMX || || || || || ||
||ITMY || || || || || ||
||ETMX || || || || || ||
||ETMY || || || || || ||
||PRM || || || || || ||
||SRM || || || || || ||
||REFL port || || || || || ||
||AS port || || || || || ||


------


== Today's work plan: 2019/10/18 1PM - 2019/10/21 1PM ==

=== Afternoon ===
 * OSTM assembly (Takahashi, Sato)
 * ASC work at REFL table (Kokeyama, Terrence, Miyoki)
 * ISS work in/out PSL (Yoshioka)
 * Diagonalizaton for ASC work (Lucia, Yamada)
 * Replacement for coil driver for ETMX (Yamamoto, Yamada)
 * Putting covers (Hayakawa)

 * BS TF measurement (Fabian)
 * ITMs TF measurement (Lucia)
 * All Type A TF measurement (Lucia)


=== Evening ===
 * FPMI lock (Takano)
 * Noise budget (Takano)
 * VIS measurement with FPMI (Fujii)
 * ETMY actuator efficiency (Yamamoto, Ogaki)

=== Weekend ===
 * Saturday morning: Installation of ion pump around OMC (Mira-pro)
 * Saturday: REFL WFS work needs PRM (Kokeyama, Terrence)
 * Saturday afternoon: Fan on/off test (Yokozawa)
 * Saturday afternoon: Sound injection (Yokozawa)
 * VIS work for ASC (Licia)
 * TF measurement with IFO with no people (Lucia)
 * VIS measurement with FPMI (Fujii)
 * ETMY actuator efficiency (Yamamoto, Ogaki)
 * Measurement of TF of TMS VIS stage to TMS QPD with FPMI locking (K.Tanaka)


=== Oct. 21 Morning ===
 * DGS maintenance for taking backup of dc then fw, tw. DAQ will be down for 1hour (Yamamoto, Oshino)
 * BS TF measurement for ASC (Fabian)
 * ISS work in/out PSL (Yoshioka)
 * PEM measurement in PSL (Yokozawa)


||Configuration||10/21 silent-run slot||Morning ||10/18 Afternoon ||Evening ||Weekend ||
|| || || || || || ||
||PSL || ||Yoshioka, Yokozawa||Yoshioka || || ||
||X-arm || || || || || ||
||Y-arm || || || || || ||
||MICH || || || || || ||
||ALS-DARM || || || || || ||
||FPMI ||Takano || || ||Takano, Fujii, Yamamoto||Yokozawa for fan off, Lucia, Fujii, Yamamoto, Tanaka||
||PFPMI || || || || || ||
|| || || || || || ||
||BS || ||Fabian ||Fabian || || ||
||ITMX || ||Lucia for ASC ||Lucia ||Fujii || ||
||ITMY || || ||Lucia ||Fujii || ||
||ETMX || ||Yamamoto ||Yamamoto, then Lucia||Fujii, Yamamoto || ||
||ETMY || ||Yamamoto ||Lucia ||Fujii || ||
||PRM || ||Kokeyama ||Kokeyama || ||Kokeyama ||
||SRM || || ||Lucia, Yamada || || ||
||REFL port || ||Kokeyama ||Kokeyama || ||Kokeyama ||
||AS port || || ||Nakano || || ||


------


== Today's work plan: 2019/10/17 1PM - 2019/10/18 1PM ==

=== Afternoon ===
 * OSTM assembly (Takahashi, Sato)
 * ASC work at REFL table (Kokeyama)
 * Motorized power adjuster for AS port (Nakano, Kokeyama)
 * Noise budget for ISS (Nakano, Takano)
 * Fan on/off test (Nakano)
 * Diagonalizaton for ASC work (Lucia, Yamada)


=== Evening ===
 * PRFPMI lock acquisition (Nakano, Takano)

=== Oct. 18 Morning ===
 * Recovering FPMI (Nakano)
  * Fix BIO at EX (Yamamoto, Tomura)

 * BS TF measurement for ASC (Fabian)
 * Ion pump leak test at all the area (Mira-pro)
 * OSTM assembly (Takahashi, Sato)
 * Preparation sound injection for weekend (Yokozawa)

 * TF measurement with IFO with no people (Lucia)
 * REFL WFS work needs PRM (Kokeyama, Terrence)


||Configuration||silent-run slot ||Morning ||10/17 Afternoon ||Evening||
|| || || || || ||
||X-arm || || || || ||
||Y-arm || || || || ||
||MICH || || || || ||
||ALS-DARM || || || || ||
||FPMI || ||Nakano for recover||Nakano for fan off|| ||
||PFPMI ||Nakano || || ||Nakano ||
|| || || || || ||
||BS || ||Fabian || || ||
||ITMX || ||Lucia for ASC ||Lucia, Yamada || ||
||ITMY || || ||Lucia, Yamada || ||
||ETMX || ||Yamamoto ||Lucia, Yamada || ||
||PRM || ||Kokeyama || || ||
||SRM || || ||Lucia, Yamada || ||
||REFL port || ||Kokeyama ||Kokeyama || ||
||AS port || || ||Nakano || ||


------

== Today's work plan: 2019/10/16 1PM - 2019/10/17 1PM ==

=== Afternoon ===
 * Power measurement for AS PD (Nakano)
 * Move OSTM in the afternoon (Takahashi, Sato)
 * Alignment for AS table (Nakano)
 * BS TF measurement for ASC (Fabian)
 * ITM TF measurement for ASC (Lucia)
 * Picomotor (Kokeyama)

 * Dark noise impovement with FPMI lock (Nakano, Izumi, Takano)
 * OLTF measurement

=== Evening ===

 * Dark noise impovement with FPMI lock (Nakano, Izumi, Takano)
 * Angle to DARM measumrne (Lucia)



=== Oct. 17 Morning ===

 * BS TF measurement for ASC (Fabian)
 * ETM TF measurement for ASC (Lucia)
 * Ion pump leak test for all the place with gate valve open (Mira-pro)
 * OSTM assembly (Takahashi, Sato)
 * Afternoon ASC with simple MICH (Kokeyama)

||Configuration||silent-run slot ||Morning||10/17 Afternoon ||Evening||
|| || || || || ||
||X-arm || || || || ||
||Y-arm || || ||Tanaka || ||
||MICH || || || || ||
||ALS-DARM || || || || ||
||FPMI ||Fujii || || || ||
|| || || || || ||
||BS || ||Fabian ||Fabian || ||
||ITMX || ||Lucia ||Lucia || ||
||ITMY || || ||Lucia || ||
||ETMX || ||Lucia || || ||
||SRM || || || || ||
||AS port || || ||Takahashi for OSTM|| ||


------

== Today's work plan: 2019/10/15 1PM - 2019/10/16 1PM ==

=== Afternoon ===
 * Noise budget for Type A DARM using green lock for both arm (Lucia)
 * DAQ restart (Takano)
 * Coil balancing (Fujii)
 * BS TF measurement for ASC (Fabian)
 * TMS TF maesuremt using single arm (Tanaka)

 * Investigate the REFL PD coupling into the ALS error signals. (Nakano, Takano)

=== Evening ===

 * Recover FPMI lock (Nakano, Ushiba, Takano)
 * TMS TF maesuremt using single arm (Tanaka)
 * Taking all SDF snapshots (Yamamoto)


=== Oct. 16 Morning ===
 * ASC with simple MICH (Kokeyama)
 * ETM TF measurement for ASC (Lucia)
 * Move OSTM in the afternoon (Takahashi, Sato)

||Configuration||silent-run slot ||Morning ||Afternoon ||Evening||
|| || || || || ||
||X-arm ||K.Tanaka for 2hr|| || || ||
||Y-arm || || || || ||
||MICH ||Yokozawa for 1hr|| || || ||
||ALS-DARM || || || || ||
||FPMI || || || || ||
|| || || || || ||
||BS || ||Fabian || || ||
||ITMX || ||Lucia || || ||
||ETMX || ||Lucia || || ||
||SRM || ||Fabian fixs guardian|| || ||
||AS port || || ||Takahashi for OSTM|| ||

==== Comments (from YF, please feel free to rm this comments after reading:) ====

 * Why not have a table/spreadsheet like the following somewhere as Yokozawa-san suggested? We definitly need much more fancy one and user-friendly one though. I could not find any other good idea now sorry. '''Could someone please work on it?''' The number of the people who want to use the interferometer is NOT one or two anymore.
   * mainly for day-time work and silent-run
   * maybe for requesting, or for showing the planned/allowed ones.
   * with proposer name and rough estimation of the necessary time slot (duration)?
|| Configuration || silent-run slot || day-time ||
|| X-arm || YF for 2hr || ||
|| || KT for 2hr || ||
|| Y-arm || || ||
|| MICH || || ||
|| ALS-DARM || || ||
|| FPMI || || ||
|| ... || || ||


------


== Today's work plan: 2019/10/11 1PM - 2019/10/15 1PM ==

=== Afternoon ===
 * WFS QPD signal check for POP (Kokeyama, Miyoki, Eleonora, Jun Gyu)
 * Investigate the REFL PD coupling into the ALS error signals. (Nakano, Takano, Ushiba)
  * Check for all PD or other circuits for grounding on table (Ushiba, Takano)
 * Some VIS work until alignment start (VIS)
  * checking the new HPCD (Lucia)
  * ITMX Op''''''Lev glitch investigation
 * Preparation for ion pump (Mira-pro)

=== Evening ===
 * Recover FPMI lock (Nakano, Ushiba, Takano)
 * Try PRFPMI lock (Nakano, Ushiba, Takano)

=== Weekend ===
 * Sat: morning ion pump move to OMC area (Mira-pro)
 * TMSX and TMSY calibration (K.Tanaka, Nakano)
 * Sunday or Monday morning: WFS test for POP and AS table (Kokeyama, Eleonora)
 * Some VIS work until alignment start (Fijii)
 * Try FPMI lock (Nakano, Ushiba, Takano)
 * Try PRFPMI lock (Nakano, Ushiba, Takano)

=== Oct. 15 Morning ===
 * Noise budget for Type A DARM using green lock for both arm (Lucia)
 * Coil balancing (Fujii)
 * ASC work for single arm (Kokeyama)
 * TMS work using single arm (Tanaka)
 * Move OSTM in the afternoon (Takahashi, Sato)

------


== Today's work plan: 2019/10/9 1PM - 2019/10/10 1PM ==

=== Afternoon ===
 * Finish the REFL power adjustment work (Kokeyama, Eleonora, June Gyu)
 * Investigate "PD dark noise" (Nakano, Takano)
  * Measuring the noise of each electronics (whitening, I-Q demod, PD with the diode completely covered)
 * SR2 sensor correction (Fabian)
 * Suspension TF measurement with IFO locked (Ushiba, Lucia, Okutomi, Terrence, Yamada)
  * Especially, make a noise budget for the ETMX MN drive
 * Think about the cause of the OpLev glitches (Okutomi)

=== Evening ===
 * Measure tilt TFs for the X-arm TR QPDs (TanakaK, Nakano)
 * Investigate the ALS stability by changing the REFL power (Nakano, Aso)
 * Try locking PRFPMI with reduced REFL power (Nakano, Aso)

=== Early Morning ===
 * Suspension Q measurements (Fujii)

=== Morning ===
 * Continue the suspension TF measurements with IFO (Ushiba, Lucia, Okutomi, Terrence, Yamada)

== Today's work plan: 2019/10/8 4PM - 2019/10/9 1PM ==

=== Evening ===
 * Fix beam clipping using reflection of PRM. (Kokeyama, Eleonora)
 * Lock FPMI and noise hunting (Nakano)
 * VIS work (VIS team)
  * Implementing notch filters (Lucia)
  * Investigation of oplev glitch, oplev noise floor (Okutomi, Yamada)
 * To measure TF from TM MN motion to TMS using single arm (K.Tanaka, Nakano)

=== Oct 9, Morning ===
 * Setting polarizing power rotator at REFL port (Kokeyama, Eleonora)
 * VIS work (VIS team)
  * VIS work with Y arm (Fujii)
  * SR damping work (Fabian)
 * Moving 7 ion pumps work at ETMX (Mira-pro)


== Today's work plan: 2019/10/8 4PM - 2019/10/9 1PM ==

=== Evening ===
 * Fix beam clipping using reflection of PRM. (Kokeyama, Eleonora)
 * Lock FPMI and noise hunting (Nakano)
 * VIS work (VIS team)
  * Implementing notch filters (Lucia)
  * Investigation of oplev glitch, oplev noise floor (Okutomi, Yamada)
 * To measure TF from TM MN motion to TMS using single arm (K.Tanaka, Nakano)

=== Oct 9, Morning ===
 * Setting polarizing power rotator at REFL port (Kokeyama, Eleonora)
 * VIS work (VIS team)
  * VIS work with Y arm (Fujii)
  * SR damping work (Fabian)
 * Moving 7 ion pumps work at ETMX (Mira-pro)

----


== Standing issues 2019/10/8 ==

[[https://paper.dropbox.com/doc/VIS-Commissioning-Task-List--Ajp3qd1D4Z0~YpldRCShrQx6AQ-RKcNXfMFrqOtTAPU48qQf|VIS Task List]]

 * PEM - measured data sharing (Washimi, Yokozawa)
 * How to control the PSL temperature when people enters the room (Miyoki)

 * We need IFO commissioning strategy!!!
 * One arm WFS test
 * DRMI lock stability
  * 3f transition
  * Search for better Gouy phase in PRC
 * PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?

 * VIS related
  * Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
  * United Guardian for all 4 suspensions (Okutomi)
  * Damping
  * Type A: Feed forward technic to suppress extra motion (Nakano)
  * Automation script for damping for calm down phase

  * PR2 & PRM oplev wind shield, PR3 LS oplev centering
  * Wind shield for PR2 and PRM (Enomoto)

 * For ASC things
  * Measure TF of VIS as ASC actuator (Okutomi)

 * Calibration for Oplevs at center area using IFO signal (Enomoto)
 * Fix clipping at IFI with IFO (Aso)
 * ETMY strong damping (Lucia, Ushiba)
 * Fix DAC comb noise problem (Miyakawa)
 * DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699)
 * QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
 * Establishing investigation method for diagonalization using ETMY only (all VIS power)
 * Fix oplev noise for ITMY
 * Fix oplev noise for ITMX
 * Fix oplev gain for ETMY (Akutsu)
 * Covering wind shield for oplevs of iMC (Akutsu, or somebody)
 * Investigation for noise of length oplev noise for ITMs (VIS + CRY)
 * PD dark noise investigation (Kozakai)

-----


== Today's work plan: 2019/10/7 1PM - 2019/10/8 4PM ==

=== After noon and Evening ===
 * Fix beam clipping for IMMT trans. (Kokeyama)
 * VIS work (VIS team)
  * ITMX is too shaky.

 * To measure TF from TM motion to TMS using single arm (K.Tanaka, Nakano)
 * SR2 test (Fabian)
 * Rebuild for all Type B model (Terrence)
 * Recovering FPMI locked by Guardian (Nakano, Ushiba)


=== Morning ===
 * Fix beam clipping using Green flash for X arm (Kokeyama, Eleonora)
 * VIS work (VIS team)
  * ETMX work from 3AM (Fujii)
  * SRMs work for restarting RT models(Fabian)

 * Moving 7 ion pumps to center area (Mira-pro)

----



== Today's work plan: 2019/10/3 1PM - 2019/10/7 1PM ==

=== After noon and Evening ===
 * Recovering FPMI (Nakano, Ushiba)
  * Let's see all the peak again and start hunting them above 10Hz first.
 * 40Hz peak suppression without control (Okutomi, Lucia)
 * ASC work at AS port. It may needs real IFO beam but other laser diode can be used (Kokeyama, Miyoki)
 * VIS works for SRMs if AS port is not used. (Fabian)


=== Oct. 3 ===
 * Ceremony
  * IFO test for ceremony (Nakano, Yamamoto)

 * ASC work with single arm (K.Tanaka)
 * VIS work (Fujii)
 * FPMI work(Nakano, Ushiba)

=== weekend ===
 * ASC work on Sunday (Kokeyama)
 * Line injection (Yamamoto, Ogaki)
 * PEM acoustic injection on Saturday or Sunday (Yokozawa)

=== Oct. 7 ===
 * DGS maintenance for replacing SR2 PC (Oshino, Yamamoto, Miyakawa)
 * Power cable change on LSC rack (Tomura)
 * Fix beam clipping using PRM reflection (Kokeyama)
 * VIS work (VIS team)

----

== Today's work plan: 2019/10/2 1PM - 2019/10/3 1PM ==

=== After noon and Evening ===
 * VIS works for SRMs (Fabian)
 * ND filter change (Nakano)
 * 40Hz peak suppression (Ushiba, Lucia)
 * Swapping AS WFS with restarting k1omc (Kokeyama)
 * Maintenance for cryo shield for ETMX and ITMX (Kimura)
 * FPMI lock from 4 or 5 pm and noise hunting starts (Nakano)

=== Oct. 3 Morning ===
 * VIS works (Fabian for SRMs, Lucia, Fujii)
 * air compresser (Kimura)
 * Gluiding OSTM dummy mirror (Takahashi)
 * Modification of MEDM for injection screen (Sawada)
 * Modification of camera script (Inoue)
----

== Today's work plan: 2019/10/1 1PM - 2019/10/2 4PM ==

=== After noon and Evening ===
 * It's a good time to try FPMI.
 * VIS work with IFO.
  * 40Hz peak (Ushiba)
 * TMS work as ASC preparation (Tanaka)
 * Lock acquisition for PRFPMI (Nakano).
 * AS WFS work (Kokeyama, Miyoki, Miyakawa)

=== Oct. 2 daytime ===
 * Damping 40Hz peak with single arm lock (Okutomi, Ushiba)
 * ND filter change (Nakano)
 * VIS works (Fabian for SRMs, Lucia)
 * Maintenance for cryo shield for ETMX and ITMX (Kimura)
 * Magnet meter (Yokozawa, Tanaka)
 * Installation demos board etc. for AS WFS (Kokeyama, Miyoki)

----

== Today's work plan: 2019/9/27 1PM - 2019/10/1 1PM ==

=== After noon and Evening ===
 * PRFPMI variable finesse lock (Nakano + others)
 * ITMX damping (Yamada)

=== Weekend ===
 * VIS work in the morning basically.
  * ITMX damping (Yamada)
  * ITMX and ETMX, maybe midnight (Fujii)

 * PRFPMI variable finesse lock (Nakano + others)
 * IMC ASC on Sunday morning (Kokeyama)

=== Sept. 30 morning ===
 * DGS maintenance: backup k1script, and k1nfs0 system disk
 * VIS work in the morning basically.

=== Oct. 1 morning ===
 * AS WFS work (Kokeyama)
 * VIS works
 * Magneto meter (Yokozawa, Tanaka)

----


== Today's work plan: 2019/9/26 1PM - 2019/9/27 1PM ==

=== After noon and Evening ===
 * Discuss the OpLev and actuator diagonalization method (VIS + CRY + Nakano)
 * PRFPMI variable finesse lock (Nakano + others)
 * MC WFS calibration (Kokeyama)

=== Sept. 27(Wed.) morning ===
 * Request form Nakano-kun for ETMY (Ushiba)
  * Length photosensor will be used.
  * Damp for 20Hz~.
  * Fix DC conflict MN oplev using High/Low gain
 * ETMX damping (Fujii)
 * ITMX damping (Yamada)
 * Payload work (Lucia)
 * Type-A QPD and actuator diagonalization (VIS)
 * iMC WFS (Kokeyama)
 * Bug fix on perl cord for oplev (Yamamoto)

----

== Today's work plan: 2019/9/25 1PM - 2019/9/26 1PM ==

=== After noon and Evening ===
 * Some measurement using X arm for finesse or something (Nakano, Jerome)
 * RT model modification for ETMY (Nakano)
 * Investigation of ETMY for glitch and hysteresis (Aso, Lucia, Fabian, Yamamoto)

 * Fix oplev noise at ITMY (Aso)
 * AS WFS (Kokeyama)
 * Works for OMC circuit (Somiya, Ogawa)
 

=== Sept. 26(Wed.) morning ===
 * MICH WFS (Kokeyama)
 * Diagnalization for VIS (all VIS team)

== Today's work plan: 2019/9/24 4PM - 2019/9/25 1PM ==

=== Evening ===
 * Investigation of ETMY for glitch and hysteresis (Lucia, Terrence, Fabian, Okutomi, Nakano)
 * MC WFS work (Kokeyama)
 * Installation of the repaired LVDT driver for ITMY (Okutomi)
 * Installation of QPD driver for OMC (Somiya)
 

=== Sept. 25(Wed.) morning ===
 * AS WFS (Kokeyama)
 * Disassembling OMC suspension and test (Somiya, Ogawa, Kokeyama)
 * DAC investigation for 0.2Hz (Miyakawa, Aso, Yamamoto, Lucia Fabian)
 * VIS work for X arm (Fujii)

----

== Today's work plan: 2019/9/20 4PM - 2019/9/24 4PM ==

=== Afternoon ===
 * Lock acquisition with some hierarchy models (Rana, Nakano, Aso)
 * Free swinging for ETMY (Rana)
 * CAL: restarting CAL model
 
=== Wweekend ===
 * Lock acquisition from afternoon (Nakano, Rana)
 * PEM vibration measurement in the center room in the morning.
 * PCAL: alignment work at ETMY (Darkhan, Ogaki)
 * Adding new memory to k1ctrXX on Monday (Oshino)

=== Sept. 24(Tue.) daytime ===

 * Investigation of ETMY for glitch and hysteresis (O)
 * Disassembling OMC suspension (Somiya, Aso, Koseyama)
 * Optical table cover around OMC chamber (Michimura)
 * PCal work for ETMX, ETMY remotely (Inoue)
 * SR2 sensor correction (Fabian)
 * Maintenance for PEM work (Yokozawa)
 * Jerome has a talk for optical parameters of aVIRGO at 3pm.

----


== Today's work plan: 2019/9/19 4PM - 2019/9/20 4PM ==

=== Evening ===
 * BS L2P filter (Terrence, Lucia)
 * Long term stability test for matrix diagonalization for ETMY (Lucia, Jenne)
 * Try variable finesse locking for PRFPMI (Nakano, Rana, Jenne)

=== Sept. 20(Fri.) daytime ===
 * GIF feedforward test using X arm (Yokozawa, Miyo)
 * IFO lock acquisition or noise hunting (Nakano, Rana)
 * AS DAC noise problem: check the up-sampling filter in IOP (Miyakawa)
 * PCal work for ETMX, ETMY remotely (Inoue)

----

== Today's work plan: 2019/9/18 4PM - 2019/9/19 4PM ==

=== Evening ===
 * Foil for QPD for PRM (Akutsu)
 * Matrix diagonalization for ETMY(Lucia, Jenne)
 * Opleve investigation and hierarchy control (Rana)
 * Try variable finesse locking for PRFPMI (Nakano, Rana, Jenne)
 * Xarm + GIF control in the morning if possible(Miyo, Yokozawa)

=== Sept. 19(Wed.) daytime ===
 * AS DAC noise problem: check the up-sampling filter in IOP (Rana, Yamamoto, Miyakawa)
 * Clean up portable accelerometer (Yokozawa)
 * PRM diagonalization (Shoda)
 * Diagonalization of oplev with ETMX(Lucia)
 * BS diagnalization (Terrence)
 * Some measurement for Type A (Fujii)
 * Damping work for ITMY and ETMY (Ushiba)
 * PCal work for ETMX, ETMY (Inoue)

----


== Today's work plan: 2019/9/17 4PM - 2019/9/18 4PM ==

=== Evening ===
 * BS damping with the same strategy as PR3 (Rana)
 * Try variable finesse locking for PRFPMI (Nakano, Rana, Jenne)
 * Kick mirrors for OpLev diagonalization
 * Restart the k1ex0 (Inoue)

=== Sept. 18(Tue) daytime ===
 * Vertical sensor correction with ETMY&ITMX (Lucia)
 * OpLev diagonalization (Shoda ?)
 * ETMX damping (Fujii)
 * ITMY BP comb damping (Ushiba)
 * IMC pico to change the beam spot on MCo
 * AS DAC noise problem: check the up-sampling filter in IOP (Rana, Miyakawa)

----

Archive of the Daily Commissioning Meeting at 1PM

Contents

  1. Archive of the Daily Commissioning Meeting at 1PM
    1. Today's work plan: 2019/11/18 1PM - 2019/11/19 1PM
    2. Today's work plan: 2019/11/15 1PM - 2019/11/18 1PM
    3. Today's work plan: 2019/11/14 1PM - 2019/11/15 1PM
    4. Today's work plan: 2019/11/13 1PM - 2019/11/14 1PM
    5. Today's work plan: 2019/11/13 1PM - 2019/11/14 1PM
    6. Today's work plan: 2019/11/12 1PM - 2019/11/13 1PM
    7. Today's work plan: 2019/11/11 1PM - 2019/11/12 1PM
    8. Today's work plan: 2019/11/8 1PM - 2019/11/11 1PM
    9. Today's work plan: 2019/11/7 1PM - 2019/11/8 1PM
    10. Today's work plan: 2019/11/6 1PM - 2019/11/7 1PM
    11. Today's work plan: 2019/11/5 1PM - 2019/11/6 1PM
    12. Today's work plan: 2019/11/1 1PM - 2019/11/5 1PM
    13. Today's work plan: 2019/10/31 1PM - 2019/11/1 1PM
    14. Today's work plan: 2019/10/30 1PM - 2019/10/31 1PM
    15. Today's work plan: 2019/10/29 1PM - 2019/10/30 1PM
    16. Today's work plan: 2019/10/28 1PM - 2019/10/29 1PM
    17. Today's work plan: 2019/10/24 1PM - 2019/10/25 1PM
    18. Today's work plan: 2019/10/23 1PM - 2019/10/24 1PM
    19. Today's work plan: 2019/10/21 1PM - 2019/10/23 1PM
    20. Today's work plan: 2019/10/18 1PM - 2019/10/21 1PM
    21. Today's work plan: 2019/10/17 1PM - 2019/10/18 1PM
    22. Today's work plan: 2019/10/16 1PM - 2019/10/17 1PM
    23. Today's work plan: 2019/10/15 1PM - 2019/10/16 1PM
    24. Today's work plan: 2019/10/11 1PM - 2019/10/15 1PM
    25. Today's work plan: 2019/10/9 1PM - 2019/10/10 1PM
    26. Today's work plan: 2019/10/8 4PM - 2019/10/9 1PM
    27. Today's work plan: 2019/10/8 4PM - 2019/10/9 1PM
    28. Standing issues 2019/10/8
    29. Today's work plan: 2019/10/7 1PM - 2019/10/8 4PM
    30. Today's work plan: 2019/10/3 1PM - 2019/10/7 1PM
    31. Today's work plan: 2019/10/2 1PM - 2019/10/3 1PM
    32. Today's work plan: 2019/10/1 1PM - 2019/10/2 4PM
    33. Today's work plan: 2019/9/27 1PM - 2019/10/1 1PM
    34. Today's work plan: 2019/9/26 1PM - 2019/9/27 1PM
    35. Today's work plan: 2019/9/25 1PM - 2019/9/26 1PM
    36. Today's work plan: 2019/9/24 4PM - 2019/9/25 1PM
    37. Today's work plan: 2019/9/20 4PM - 2019/9/24 4PM
    38. Today's work plan: 2019/9/19 4PM - 2019/9/20 4PM
    39. Today's work plan: 2019/9/18 4PM - 2019/9/19 4PM
    40. Today's work plan: 2019/9/17 4PM - 2019/9/18 4PM
    41. Today's work plan: 2019/9/13 1PM - 2019/9/17 4PM
    42. Today's work plan: 2019/9/12 4PM - 2019/9/13 1PM
    43. Today's work plan: 2019/9/11 1PM - 2019/9/12 1PM
    44. Today's work plan: 2019/9/10 1PM - 2019/9/11 1PM
    45. Today's work plan: 2019/9/9 1PM - 2019/9/10 1PM
    46. Today's work plan: 2019/9/6 1PM - 2019/9/9 1PM
    47. Today's work plan: 2019/9/4 1PM - 2019/9/5 1PM
    48. Today's work plan: 2019/9/3 1PM - 2019/9/4 1PM
    49. Today's work plan: 2019/9/2 1PM - 2019/9/3 1PM
    50. Today's work plan: 2019/8/30 1PM - 2019/9/2 1PM
    51. Today's work plan: 2019/8/29 1PM - 2019/8/30 1PM
    52. Today's work plan: 2019/8/28 1PM - 2019/8/29 1PM
    53. Today's work plan: 2019/8/27 1PM - 2019/8/28 1PM
    54. Today's work plan: 2019/8/26 1PM - 2019/8/27 1PM
    55. Today's work plan: 2019/8/21 1PM - 2019/8/26 1PM
    56. Today's work plan: 2019/8/20 1PM - 2019/8/21 1PM
    57. Today's work plan: 2019/8/19 1PM - 2019/8/20 1PM
    58. Today's work plan: 2019/8/16 1PM - 2019/8/19 1PM
    59. Today's work plan: 2019/8/15 1PM - 2019/8/16 1PM
    60. Today's work plan: 2019/8/9 1PM - 2019/8/15 1PM
    61. Today's work plan: 2019/8/8 1PM - 2019/8/9 1PM
    62. Today's work plan: 2019/8/7 1PM - 2019/8/8 1PM
    63. Today's work plan: 2019/8/6 1PM - 2019/8/7 1PM
    64. Standing issues 2019/8/5
    65. Today's work plan: 2019/8/5 1PM - 2019/8/6 1PM
    66. Today's work plan: 2019/8/1 1PM - 2019/8/2 1PM
    67. Today's work plan: 2019/8/2 1PM - 2019/8/5 1PM
    68. Today's work plan: 2019/8/1 1PM - 2019/8/2 1PM
    69. Today's work plan: 2019/7/31 1PM - 2019/8/1 1PM
    70. Today's work plan: 2019/7/30 1PM - 2019/7/31 1PM
    71. Today's work plan: 2019/7/26 1PM - 2019/7/30 1PM
    72. Today's work plan: 2019/7/25 1PM - 2019/7/26 1PM
    73. Today's work plan: 2019/7/24 1PM - 2019/7/25 1PM
    74. Standing issues
    75. Today's work plan: 2019/7/23 1PM - 2019/7/24 1PM
    76. Today's work plan: 2019/7/22 1PM - 2019/7/23 1PM
    77. Today's work plan: 2019/7/19 1PM - 2019/7/22 1PM
    78. Today's work plan: 2019/7/17 1PM - 2019/7/18 1PM


Today's work plan: 2019/11/18 1PM - 2019/11/19 1PM

Afternoon

  • ASC work for measuring demodulation phase for AS using Y arm (Lucia, Ushiba, Nakano, Anamaria)
  • ISC meeting for ASC things from 2pm (Michimura leads)
  • OMC assembling for gluing a mirrro (Aso)
  • Modification for DAQ guardian (Yamamoto)
  • Pcal shutter (Yamamoto)

Evening

  • FPMI lock (Nakano)
    • Fix find resonance routine (Nakano)
  • PRMI lock (Nakano)
  • VIS noise budget (Lucia, Ushiba)
  • ETMY calibration (Ogaki)

Nov. 19 Morning

  • ASC work with MICH (Ushiba, Lucia, Anamaria)
  • Check BIO cable at BS (Yamamoto, Fabian)
  • ETMX measurement with misaligned state (Yamada)
  • ETMY measurement with misaligned state (Okutomi)

Configuration

11/19 silent-run slot

Morning

11/18 Afternoon

Evening

PSL

IMC

X-arm

ASC

Y-arm

ASC

MICH

ASC

ALS-DARM

FPMI

Nakano

Nakano

PFPMI

BS

ITMX

ITMY

ETMX

Yamada

ETMY

Okutomi

PRM

PR2

SRM

REFL port

POP port

AS port


Today's work plan: 2019/11/15 1PM - 2019/11/18 1PM

Afternoon

  • ASC work for Y arm or X arm (Eleonora, Lucia, K.Tanaka)
  • Fixing phase noise cancel for both X, Y green (Nakano)
  • ISS noise measurement (Yoshioka, Miyakawa)
  • PEM turn on vacuum pump aound 3pm (Yokozawa, Washimi)
  • Entering PSL shortly (Kokeyama)
  • Laser power for PCal needs EX alignment (Yamamoto)

Evening

  • FPMI lock (Nakano)

Weekend

  • FPMI lock (Nakano)
  • VIS noise budget (Lucia, Ushiba)
  • Type A measurement on Saturday morning (Fujii)
  • PEM measurement with FPMI on Sunday daytime
  • ETMX calibration on Sunday mornintg (Ogaki)
  • Injection of cal line during silent run (Yamamoto)
  • Implementation roll off filter (Yamada)

Nov. 18 Morning

  • Maintenance of DGS for replacing power supply, needs Type B and Type Bp in the safe mode (Oshino, Yamamoto)
  • ASC work for demodulation phase tuning (Ushiba, Lucia, Terrencer)
  • PEM work around ISS table (Yokozawa)
  • OMC assembling for gluing mirror (Aso)
  • Stopping cryocooler at ETMX shield without closing gate valve (Tomaru)

Configuration

11/18 silent-run slot

Morning

11/15 Afternoon

Evening

Weekend

DGS maintenance

VIS noise budget, Type A measurement, Injection

PSL

Kokeyama

IMC

X-arm

ASC

ASC, PCal

Y-arm

ASC

ASC

MICH

ALS-DARM

FPMI

ASC

Nakano

Nakano, Yamada

Nakano, Yamada

PFPMI

BS

ITMX

ITMY

ETMX

Tomaru

PCal

Ogaki on Sun. morning

ETMY

PRM

PR2

SRM

REFL port

POP port

AS port


Today's work plan: 2019/11/14 1PM - 2019/11/15 1PM

Afternoon

  • OMC work (Aso)
  • Double demodulation work (Kokeyama, Koyama)

Evening

  • FPMI lock (Nakano)

Nov. 15 Morning

  • ASC work for FPMI (Eleonora, Lucia, K.Tanaka)
  • ISS whitening installation (Yoshioka, Miyakawa)
  • Double demodulation work (Kokeyama, Koyama)
  • PEM work around ISS table (Yokozawa)
  • Temperature tuning for EYC and IXV (Miyoki)

Configuration

11/15 silent-run slot

Morning

11/14 Afternoon

Evening

PSL

IMC

X-arm

ASC

ASC

Y-arm

ASC

MICH

ALS-DARM

FPMI

ASC

Nakano

Nakano

PFPMI

BS

ITMX

ITMY

ETMX

ETMY

PRM

PR2

SRM

REFL port

ASC

POP port

ASC

AS port


Today's work plan: 2019/11/13 1PM - 2019/11/14 1PM

Afternoon

  • Restarting TMS model and DAQ (K.Tanaka)
  • Fix REFL QPD for ASC in the mine (Eleonora, Lucia)
  • Arranging POP optical layout (Kokeyama, Terrence)
  • Cooler maintenance for PSL room (Hayakawa)
  • FPMI lock trial to fix CALM in the mine(Nakano)
  • OMC work (Aso)

Evening

  • FPMI lock trial (Nakano)

Nov. 14 Morning

  • ASC test with X arm (Eleonora, Lucia, K.Tanaka)
  • Double demodulation work (Kokeyama, Koyama)
  • Assembling OMC (Aso)
  • Cable work at EY (Yamada)
  • Removing accelerometer (Washimi)

Configuration

11/14 silent-run slot

Morning

11/13 Afternoon

Evening

PSL

IMC

X-arm

ASC

ASC

Y-arm

MICH

ALS-DARM

FPMI

Nakano

Nakano

PFPMI

BS

ITMX

ITMY

ETMX

ETMY

Wasnimi, Yamada

PRM

PR2

SRM

REFL port

ASC

POP port

ASC

AS port


Today's work plan: 2019/11/13 1PM - 2019/11/14 1PM

Afternoon

  • Restarting TMS model and DAQ (K.Tanaka)
  • Fix REFL QPD for ASC in the mine (Eleonora, Lucia)
  • Arranging POP optical layout (Kokeyama, Terrence)
  • Cooler maintenance for PSL room (Hayakawa)
  • FPMI lock trial to fix CALM in the mine(Nakano)
  • OMC work (Aso)

Evening

  • FPMI lock trial (Nakano)

Nov. 13 Morning

  • ASC test with X arm (Eleonora, Lucia, K.Tanaka)
  • Assembling OMC (Aso)
  • ISS work (Yoshioka)

Configuration

11/14 silent-run slot

Morning

11/13 Afternoon

Evening

PSL

IMC

X-arm

ASC

ASC

Y-arm

MICH

ALS-DARM

FPMI

Nakano

Nakano

PFPMI

BS

ITMX

ITMY

ETMX

ETMY

PRM

PR2

SRM

REFL port

ASC

POP port

ASC

AS port


Today's work plan: 2019/11/12 1PM - 2019/11/13 1PM

Afternoon

  • Fix X arm lock for IR (Ushiba, Yokozawa, Nakano)
  • FPMI lock trial (Nakano)
  • Alignment check for X arm (Kokeyama, Terrence)
  • ASC test with X arm (Eleonora, Lucia, K.Tanaka)
  • Fix green instability (Nakano, Miyakawa)
  • ISS measurement in mine (Yoshioka, Miyakawa)
  • OMC work (Aso)

Evening

  • Fix green instability (Nakano, Miyakawa)
  • FPMI lock trial (Nakano)

Nov. 13 Morning

  • ASC test with X arm (Eleonora, Lucia, K.Tanaka)
  • Assembling OMC (Aso)
  • ISS Guardian test (Miyakawa)
  • PEM work for 46Hz hunting (Yokozawa)

Configuration

11/13 silent-run slot

Morning

11/12 Afternoon

Evening

PSL

IMC

X-arm

ASC

ASC

Y-arm

MICH

ASC

ALS-DARM

FPMI

Nakano

Nakano

PFPMI

BS

ITMX

Tomaru

ITMY

ETMX

ETMY

PRM

PR2

SRM

REFL port

AS port


Today's work plan: 2019/11/11 1PM - 2019/11/12 1PM

Afternoon

  • Fix green instability (Nakano, Yamamoto)
  • ASC test with X arm (Eleonora, Lucia, K.Tanaka)
  • FPMI lock trial (Nakano, Yamamoto)
  • ISS measurement in mine (Yoshioka)

Evening

  • Fix green instability (Nakano, Yamamoto)
  • FPMI lock trial (Nakano, Yamamoto)

Nov. 12 Morning

  • Measurement for Type A from 6am (Fujii)
  • ASC test with X arm (Eleonora, Lucia, K.Tanaka)
  • Preparation for OMC work (Aso)
  • ISS Guardian test (Yoshioka, Miyakawa)
  • Changing valve unit for IXC (Tomaru)
  • Assembling OMC (Aso)

Configuration

11/12 silent-run slot

Morning

11/11 Afternoon

Evening

Type A, Fujii

PSL

Nakano

IMC

X-arm

ASC

ASC

Y-arm

MICH

ASC

ALS-DARM

FPMI

PFPMI

BS

ITMX

Tomaru

ITMY

ETMX

ETMY

PRM

PR2

SRM

REFL port

AS port


Today's work plan: 2019/11/8 1PM - 2019/11/11 1PM

Afternoon

  • FPMI lock trial (Nakano, Takano)
  • Closing ASC loop for X arm until 3pm (Eleonora, Lucia, K.Tanaka, Ushiba)
  • Pcal calibration for X arm necessary ETMX alignment from 2pm to 4pm (Inoue, Darkhan)
  • ISS Guardian test (Miyakawa)

Evening

  • FPMI lock trial (Nakano, Takano)

Weekend

  • FPMI lock trial (Nakano, Takano)
  • MC work for replacing FSS (Nakano)
  • Type A measurement with FPMI (Fujii)

Nov. 11 Morning

  • DGS maintenance.
    • Jumper setting for ETMX HPCD (Shimode, Yamamoto)
    • Replacement DC power supply for PRM and PR3 (Tomura, Kamiizumi)
    • Exchanging FW1 computer (Oshino)
  • Checking ground loop TMSX and TMSY (Yokozawa, T.Tanaka)
  • Modifying RT model for all Type A, needs safe mode (Okutomi, Yamada)
  • Preparation for OMC work (Aso)

Configuration

11/11 silent-run slot

Morning

11/8 Afternoon

Evening

Weekend

Maintenance

PSL

ASC ~3pm

IMC

ASC ~3pm

Nakano

X-arm

Y-arm

MICH

ALS-DARM

FPMI

LSC 3pm~

LSC

LSC

PFPMI

BS

ITMX

ITMY

ETMX

Pcal

ETMY

PRM

PR2

SRM

REFL port

AS port


Today's work plan: 2019/11/7 1PM - 2019/11/8 1PM

Afternoon

  • Fixing PLL for GRX (Matteo, Aso)
  • Closing ASC loop for X arm (Eleonora, Lucia, K.Tanaka)
  • Assembling OSTM (Takahashi)
  • Measurement on IMC for FSS (Nakano)
  • OMC assembly (Aso)
  • Absolute power measurement for PCal at ETMY (Inoue, Darkhan)

Evening

  • Fixing PLL (Takano, Matteo)

Nov. 8 Morning

  • Fixing PLL for AOM alignment to avoid coupling PDH to intensity (Takano, Matteo)
  • Alignment check for ASC QPD (Eleonora, Lucia, Ushiba)

Configuration

11/8 silent-run slot

Morning

11/7 Afternoon

Evening

PSL

Nakano, Takano

Matteo

X-arm

Kokeyama

Y-arm

MICH

ALS-DARM

FPMI

Nakano, Takano

PFPMI

BS

ITMX

ITMY

ETMX

ETMY

PRM

PR2

SRM

REFL port

AS port


Today's work plan: 2019/11/6 1PM - 2019/11/7 1PM

Afternoon

  • Closing ASC loop for X arm (Eleonora, Lucia)
  • Fixing PLL for GRX (Matteo, Aso)
  • Assembling OSTM (Takahashi)
  • AEL team investigate the location for storage (Tomura, Shimode, Miyakawa)
  • Check network cables in central area (Miyakawa)
  • Fixing Type A saturation by temperature drift (Lucia, Okutomi)

Evening

  • Fixing PLL (Takano, Matteo)

Nov. 7 Morning

  • OSTM (Takahashi)
  • Fixing PLL (Takano, Matteo)
  • OMC assembly (Aso)
  • Fixing temperature sensor check at End stations (Yamada)
  • Closing ASC loop for X arm (Eleonora, Lucia)

Configuration

11/7 silent-run slot

Morning

11/6 Afternoon

Evening

PSL

Aso, Takano

Matteo

X-arm

Kokeyama

Y-arm

MICH

ALS-DARM

FPMI

Nakano, Takano

PFPMI

BS

ITMX

ITMY

ETMX

ETMY

PRM

PR2

SRM

REFL port

AS port


Today's work plan: 2019/11/5 1PM - 2019/11/6 1PM

Afternoon

  • FSS investigation for oscillation ~80MHz to avoid slew rate limit (Nakano, Takano)

Evening

  • ASC phasing for RELF using X arm (Kokeyama, Lucia, Eleonora)

Nov. 6 Morning

  • ASC work (Eleonora, Lucia)
  • Fixing PLL for GRX (Matteo)
  • Fixing Type A saturation by temperature drift (Lucia)
  • Fixing temperature monitor (Oshino, Yokozawa, Jaewan, Seojoon)
  • OMC assembly (Aso)
  • PRM misalign investigation (Fabian)

Configuration

11/6 silent-run slot

Morning

11/5 Afternoon

Evening

PSL

Matteo

Nakano

X-arm

Eleonora

Kokeyama

Kokeyama

Y-arm

MICH

ALS-DARM

FPMI

PFPMI

BS

ITMX

ITMY

ETMX

ETMY

PRM

Fabian

PR2

SRM

REFL port

AS port


Today's work plan: 2019/11/1 1PM - 2019/11/5 1PM

Afternoon

  • Gain adjustment for PD at both end (Takano, Yokozawa)
  • Check PRM with aligned state (Shoda)
  • Keeping FPMI locked (Takano, Ushiba, Aso)
  • ISS measurement (Yoshioka, Miyakawa)
  • TMS TF measurement using on QPD (K.Tanaka)

Evening

  • FPMI lock (Takano, Aso)
  • TMS TF measurement using on QPD (K.Tanaka)
  • Measurement for Type A remotely in the night (Fujii)
  • ETMX and ITMX actuator efficiency (Yamamoto)

Weekend

  • Saturday
    • Yokozawa, Yamamoto
    • PEM acoustic or coil injection (T.Tanaka)
  • Sunday
    • Takano, Kokeyama, Yokozawa, Yamamoto, Miyakawa
    • Measurement for Type A remotely in the night (Fujii)
    • WFS work (Kokeyama)
    • MICH calibration (Yamamoto)
  • Monday
    • Takano, Kokeyama, Yokozawa, Yamamoto, Aso
    • WFS work (Kokeyama)
    • Measurement for Type A remotely in the night(Fujii)
    • MICH calibration (Yamamoto)
  • FPMI lock (Takano, Aso)
  • TMS TF measurement using on QPD (K.Tanaka)
  • ETMX and ITMX actuator efficiency (Yamamoto)

Nov. 5 Morning

  • FPMI lock (Takano, Ushiba)

Configuration

11/1 silent-run slot

Morning

11/1 Afternoon

Evening

Weekend

PSL

X-arm

Y-arm

Yamamoto

MICH

Yamamoto

ALS-DARM

FPMI

Takano

Takano, K.Tanaka

Takano, K.Tanaka

Takano, Kokeyama, K.Tanaka

PFPMI

BS

ITMX

Fujii, Yamamoto

Fujii, Yamamoto

ITMY

Fujii,

Fujii

ETMX

Takano

Takano

Fujii, Yamamoto

Fujii, Yamamoto

ETMY

Takano

Takano

Fujii

Fujii

PRM

Fabian

Shoda

PR2

SRM

REFL port

AS port


Today's work plan: 2019/10/31 1PM - 2019/11/1 1PM

Afternoon

  • FPMI lock for CALM hand off (Takano, Ushiba)
  • ISS circuit check and installation (Miyakawa, Yoshioka)
  • PCal measurement at Xend (Wshimi, Ito)
  • TMS TF measurement using on QPD (K.Tanaka)

Evening

  • FPMI lock (Takano, Aso)
  • TMS TF measurement using on QPD (K.Tanaka)
  • ETMX and ITMX actuator efficiency (Yamamoto)

Nov. 1 Morning

  • Tuning off test vacuum pump (Yokozawa, Saito)
  • Installation of ISS (Yoshioka, Miyakawa)
  • Gain adjustment for PD at both end (Takano, Yokozawa)
  • Modify Guardian script for PRM misaligned state (Fabian, Shoda)
  • FPMI lock (Takano, Ushiba)

Configuration

11/1 silent-run slot

Morning

10/31 Afternoon

Evening

PSL

X-arm

Y-arm

Yamamoto

MICH

ALS-DARM

FPMI

Takano

Takano

Takano

PFPMI

BS

ITMX

Yamamoto

ITMY

ETMX

Takano

Yamamoto

ETMY

Takano

PRM

Fabian

PR2

SRM

REFL port

AS port


Today's work plan: 2019/10/30 1PM - 2019/10/31 1PM

Afternoon

  • FPMI lock for CALM/DARM hand off (Takano, Ushiba)
  • ISS circuit check (Miyakawa)

Evening

  • FPMI lock (Takano, Aso)
  • Actuator efficiency measurement for ITMY and ETMY (Yamamoto)
  • Type A measurement (Fujii)

Oct. 31 Morning

  • Duct cooler on/off test for IXC chamber (Washimi, Tomaru)
  • Investigating oplev mount by touching (Tomaru)
  • Measurement of 24Hz for IY0 (Yokozawa, TN.Tanaka)
  • Modification for ISS board (Yoshioka, Miyakawa)
  • Investigation for PRM misaligned state (Fabian)
  • Filter test for Type A (Licia)
  • FPMI lock (Takano, Ushiba)

Configuration

10/31 silent-run slot

Morning

10/30 Afternoon

Evening

PSL

X-arm

Y-arm

MICH

Yamamoto

ALS-DARM

FPMI

Yokozawa

Takano

Takano

Takano

PFPMI

BS

ITMX

Lucia

Yamamoto, Fujii

ITMY

Lucia

Fujii

ETMX

Lucia

Yamamoto, Fujii

ETMY

Lucia

Fujii

PRM

Fabian

PR2

SRM

REFL port

Takano

AS port


Today's work plan: 2019/10/29 1PM - 2019/10/30 1PM

Afternoon

  • Replacing PDA1 on RELF table (Takano, Ushiba)
  • FPMI lock (Takano, Aso)
    • Investigation for noise injection from REFL PD.
  • ISS work outside of PSL room (Yoshioka)
  • Checking fan on/off test at SR booth in short time (Washimi)
  • Measurement of magnetic field of 18V power supply for circulator (Yokozawa, TN.Tanaka)

Evening

  • FPMI lock (Takano, Aso)
  • Measurement for VIS (Fujii)
  • Measurement for actuator efficiency for ITM, ETMY (Yamamoto)

Oct. 30 Morning

  • Measurement among some sensors using IFO (Yokozawa, Tanaka)
  • ISS circuit modification to shift integrator frequency lower (MiyakawaY)
  • Investigation PRM misalign state (Fabian)
  • FPMI lock (Takano, Aso)

Configuration

10/30 silent-run slot

Morning

10/29 Afternoon

Evening

PSL

X-arm

Y-arm

MICH

Yamamoto

ALS-DARM

FPMI

Yokozawa

Takano

Takano

Takano

PFPMI

BS

ITMX

Yamamoto, Fujii

ITMY

Fujii

ETMX

Yamamoto, Fujii

ETMY

Fujii

PRM

Fabian

PR2

SRM

REFL port

Takano

AS port


Today's work plan: 2019/10/28 1PM - 2019/10/29 1PM

Afternoon

  • FPMI lock (Takano, Aso)
    • Alignment of Y arm for ETMY.
    • Remove clip of green on TMSY.
    • Investigation for noise injection from REFL PD.
    • Ground issue on REFL QPD.
  • Engage ISS in the PSL room (Yoshioka, Ushiba)
  • Checking fan on/off test at SR booth in short time (Washimi)
  • Measurement of magnetic field of 18V power supply (Yokozawa, TN.Tanaka)

Evening

  • FPMI lock (Takano, Aso)

Oct. 29 Morning

  • Replacing PDA1 on RELF table (Takano, Ushiba)
  • ISS work outside of PSL room (Yoshioka)
  • Maintenance gyro cooler at ETMY and ETMX (Kimura)
  • Measurement of magnetic field of 18V power supply (Yokozawa, Ito)
  • FPMI lock (Takano, Aso)

Configuration

10/29 silent-run slot

Morning

10/28 Afternoon

Evening

Weekend

PSL

Yoshioka

Yoshioka

X-arm

Y-arm

MICH

ALS-DARM

FPMI

Takano

Takano

Takano

Takano

PFPMI

BS

ITMX

ITMY

ETMX

ETMY

PRM

PR2

SRM

REFL port

AS port


Today's work plan: 2019/10/24 1PM - 2019/10/25 1PM

Afternoon

  • ALS DARM noise investigation (Takano, Izumi, Aso, Ushiba)
  • ISS circuit fix (Yoshioka, Ushiba)

Evening

  • ALS DARM noise investigation (Takano, Izumi, Aso, Ushiba)
  • FPMI lock (Takano, Ushiba, Izumi, Aso)

Oct. 25 Morning

  • Investigation of REFL table (Aso)
  • FPMI lock (Aso, Takano)
  • Fixing ISS board (Yoshioka, Shimode)
  • 46Hz investigation (Washimi, T.Tanaka)
  • Pcal maintenance (Inoue, Ito)
  • Exchanging one of the 16 fire detectors on ceiling ()
  • Investigate for the weak signal of ondotori (Yamamoto)

Configuration

10/25 silent-run slot

Morning

10/25 Afternoon

Evening

Weekend

PSL

X-arm

Y-arm

MICH

ALS-DARM

FPMI

Aso

PFPMI

BS

ITMX

ITMY

ETMX

Inoue

ETMY

Inoue

PRM

SRM

REFL port

Aso

AS port


Today's work plan: 2019/10/23 1PM - 2019/10/24 1PM

Afternoon

  • REFL ASC commissioning using single arm for demod phase(Izumi, Lucia)
  • BS TF for ASC (Fabian)
  • ITMY for checking filters (Yamada)
  • ISS modification (Shimode)
  • FPMI lock (Takano)

Evening

  • FPMI lock (Takano)
  • Noise budget (Takano)
  • TF of TMS motion to TMS QPD (K.Tanaka)
  • OLTF measurement and ETM calibration with FPMI for 1 and half hour (Ogaki)

Oct. 24 Morning

  • FPMI lock (Takano)
  • ASC work (Izumi)
  • SR optimization (Fabian)
  • ISS implementation (Yshioka, Ushiba)

Configuration

10/24 silent-run slot

Morning

10/23 Afternoon

Evening

PSL

Yoshioka

X-arm

Izumi, Lucia

Y-arm

Yamada

MICH

ALS-DARM

FPMI

Takano

Takano, K. Tanaka, Ogaki

PFPMI

BS

Fabian

Fabian

ITMX

ITMY

ETMX

ETMY

PRM

SRM

Fabian

REFL port

Izumi, Lucia

AS port


Today's work plan: 2019/10/21 1PM - 2019/10/23 1PM

Afternoon

  • ISS installation to PSL for short time (Yoshioka, Izumi)
  • Putting covers (Hayakawa)
  • X arm lock first, then Y arm lock (Kokeyama, Aso)
  • Camera man will enter the mine (Yokozwa)

Evening

  • FPMI lock (Takano)
  • Noise budget (Takano)
  • TF of TM motion to TMS QPD (K.Tanaka)
  • OLTF measurement and ETM calibration for 1 and half hour (Ogaki)

Oct.22

  • FPMI lock (Takano)
  • VIS measurement with FPMI (Fujii)

Oct. 23 Morning

  • FPMI lock (Takano)
  • ASC work (Izumi)
  • BS optimization (Fabian)

Configuration

10/23 silent-run slot

Morning

10/21 Afternoon

Evening

10/22

PSL

Yoshioka in short time

X-arm

Izumi, Lucia

Kokeyama, Aso

Y-arm

Kokeyama, Aso

MICH

ALS-DARM

FPMI

Takano

Takano, K. Tanaka

Takano, Fujii

PFPMI

BS

Fabian

ITMX

ITMY

ETMX

ETMY

PRM

SRM

REFL port

AS port


Today's work plan: 2019/10/18 1PM - 2019/10/21 1PM

Afternoon

  • OSTM assembly (Takahashi, Sato)
  • ASC work at REFL table (Kokeyama, Terrence, Miyoki)
  • ISS work in/out PSL (Yoshioka)
  • Diagonalizaton for ASC work (Lucia, Yamada)
  • Replacement for coil driver for ETMX (Yamamoto, Yamada)
  • Putting covers (Hayakawa)
  • BS TF measurement (Fabian)
  • ITMs TF measurement (Lucia)
  • All Type A TF measurement (Lucia)

Evening

  • FPMI lock (Takano)
  • Noise budget (Takano)
  • VIS measurement with FPMI (Fujii)
  • ETMY actuator efficiency (Yamamoto, Ogaki)

Weekend

  • Saturday morning: Installation of ion pump around OMC (Mira-pro)
  • Saturday: REFL WFS work needs PRM (Kokeyama, Terrence)
  • Saturday afternoon: Fan on/off test (Yokozawa)
  • Saturday afternoon: Sound injection (Yokozawa)
  • VIS work for ASC (Licia)
  • TF measurement with IFO with no people (Lucia)
  • VIS measurement with FPMI (Fujii)
  • ETMY actuator efficiency (Yamamoto, Ogaki)
  • Measurement of TF of TMS VIS stage to TMS QPD with FPMI locking (K.Tanaka)

Oct. 21 Morning

  • DGS maintenance for taking backup of dc then fw, tw. DAQ will be down for 1hour (Yamamoto, Oshino)
  • BS TF measurement for ASC (Fabian)
  • ISS work in/out PSL (Yoshioka)
  • PEM measurement in PSL (Yokozawa)

Configuration

10/21 silent-run slot

Morning

10/18 Afternoon

Evening

Weekend

PSL

Yoshioka, Yokozawa

Yoshioka

X-arm

Y-arm

MICH

ALS-DARM

FPMI

Takano

Takano, Fujii, Yamamoto

Yokozawa for fan off, Lucia, Fujii, Yamamoto, Tanaka

PFPMI

BS

Fabian

Fabian

ITMX

Lucia for ASC

Lucia

Fujii

ITMY

Lucia

Fujii

ETMX

Yamamoto

Yamamoto, then Lucia

Fujii, Yamamoto

ETMY

Yamamoto

Lucia

Fujii

PRM

Kokeyama

Kokeyama

Kokeyama

SRM

Lucia, Yamada

REFL port

Kokeyama

Kokeyama

Kokeyama

AS port

Nakano


Today's work plan: 2019/10/17 1PM - 2019/10/18 1PM

Afternoon

  • OSTM assembly (Takahashi, Sato)
  • ASC work at REFL table (Kokeyama)
  • Motorized power adjuster for AS port (Nakano, Kokeyama)
  • Noise budget for ISS (Nakano, Takano)
  • Fan on/off test (Nakano)
  • Diagonalizaton for ASC work (Lucia, Yamada)

Evening

  • PRFPMI lock acquisition (Nakano, Takano)

Oct. 18 Morning

  • Recovering FPMI (Nakano)
    • Fix BIO at EX (Yamamoto, Tomura)
  • BS TF measurement for ASC (Fabian)
  • Ion pump leak test at all the area (Mira-pro)
  • OSTM assembly (Takahashi, Sato)
  • Preparation sound injection for weekend (Yokozawa)
  • TF measurement with IFO with no people (Lucia)
  • REFL WFS work needs PRM (Kokeyama, Terrence)

Configuration

silent-run slot

Morning

10/17 Afternoon

Evening

X-arm

Y-arm

MICH

ALS-DARM

FPMI

Nakano for recover

Nakano for fan off

PFPMI

Nakano

Nakano

BS

Fabian

ITMX

Lucia for ASC

Lucia, Yamada

ITMY

Lucia, Yamada

ETMX

Yamamoto

Lucia, Yamada

PRM

Kokeyama

SRM

Lucia, Yamada

REFL port

Kokeyama

Kokeyama

AS port

Nakano


Today's work plan: 2019/10/16 1PM - 2019/10/17 1PM

Afternoon

  • Power measurement for AS PD (Nakano)
  • Move OSTM in the afternoon (Takahashi, Sato)
  • Alignment for AS table (Nakano)
  • BS TF measurement for ASC (Fabian)
  • ITM TF measurement for ASC (Lucia)
  • Picomotor (Kokeyama)
  • Dark noise impovement with FPMI lock (Nakano, Izumi, Takano)
  • OLTF measurement

Evening

  • Dark noise impovement with FPMI lock (Nakano, Izumi, Takano)
  • Angle to DARM measumrne (Lucia)

Oct. 17 Morning

  • BS TF measurement for ASC (Fabian)
  • ETM TF measurement for ASC (Lucia)
  • Ion pump leak test for all the place with gate valve open (Mira-pro)
  • OSTM assembly (Takahashi, Sato)
  • Afternoon ASC with simple MICH (Kokeyama)

Configuration

silent-run slot

Morning

10/17 Afternoon

Evening

X-arm

Y-arm

Tanaka

MICH

ALS-DARM

FPMI

Fujii

BS

Fabian

Fabian

ITMX

Lucia

Lucia

ITMY

Lucia

ETMX

Lucia

SRM

AS port

Takahashi for OSTM


Today's work plan: 2019/10/15 1PM - 2019/10/16 1PM

Afternoon

  • Noise budget for Type A DARM using green lock for both arm (Lucia)
  • DAQ restart (Takano)
  • Coil balancing (Fujii)
  • BS TF measurement for ASC (Fabian)
  • TMS TF maesuremt using single arm (Tanaka)
  • Investigate the REFL PD coupling into the ALS error signals. (Nakano, Takano)

Evening

  • Recover FPMI lock (Nakano, Ushiba, Takano)
  • TMS TF maesuremt using single arm (Tanaka)
  • Taking all SDF snapshots (Yamamoto)

Oct. 16 Morning

  • ASC with simple MICH (Kokeyama)
  • ETM TF measurement for ASC (Lucia)
  • Move OSTM in the afternoon (Takahashi, Sato)

Configuration

silent-run slot

Morning

Afternoon

Evening

X-arm

K.Tanaka for 2hr

Y-arm

MICH

Yokozawa for 1hr

ALS-DARM

FPMI

BS

Fabian

ITMX

Lucia

ETMX

Lucia

SRM

Fabian fixs guardian

AS port

Takahashi for OSTM

Comments (from YF, please feel free to rm this comments after reading:)

  • Why not have a table/spreadsheet like the following somewhere as Yokozawa-san suggested? We definitly need much more fancy one and user-friendly one though. I could not find any other good idea now sorry. Could someone please work on it? The number of the people who want to use the interferometer is NOT one or two anymore.

    • mainly for day-time work and silent-run
    • maybe for requesting, or for showing the planned/allowed ones.
    • with proposer name and rough estimation of the necessary time slot (duration)?

Configuration

silent-run slot

day-time

X-arm

YF for 2hr

KT for 2hr

Y-arm

MICH

ALS-DARM

FPMI

...


Today's work plan: 2019/10/11 1PM - 2019/10/15 1PM

Afternoon

  • WFS QPD signal check for POP (Kokeyama, Miyoki, Eleonora, Jun Gyu)
  • Investigate the REFL PD coupling into the ALS error signals. (Nakano, Takano, Ushiba)
    • Check for all PD or other circuits for grounding on table (Ushiba, Takano)
  • Some VIS work until alignment start (VIS)
    • checking the new HPCD (Lucia)
    • ITMX OpLev glitch investigation

  • Preparation for ion pump (Mira-pro)

Evening

  • Recover FPMI lock (Nakano, Ushiba, Takano)
  • Try PRFPMI lock (Nakano, Ushiba, Takano)

Weekend

  • Sat: morning ion pump move to OMC area (Mira-pro)
  • TMSX and TMSY calibration (K.Tanaka, Nakano)
  • Sunday or Monday morning: WFS test for POP and AS table (Kokeyama, Eleonora)
  • Some VIS work until alignment start (Fijii)
  • Try FPMI lock (Nakano, Ushiba, Takano)
  • Try PRFPMI lock (Nakano, Ushiba, Takano)

Oct. 15 Morning

  • Noise budget for Type A DARM using green lock for both arm (Lucia)
  • Coil balancing (Fujii)
  • ASC work for single arm (Kokeyama)
  • TMS work using single arm (Tanaka)
  • Move OSTM in the afternoon (Takahashi, Sato)


Today's work plan: 2019/10/9 1PM - 2019/10/10 1PM

Afternoon

  • Finish the REFL power adjustment work (Kokeyama, Eleonora, June Gyu)
  • Investigate "PD dark noise" (Nakano, Takano)
    • Measuring the noise of each electronics (whitening, I-Q demod, PD with the diode completely covered)
  • SR2 sensor correction (Fabian)
  • Suspension TF measurement with IFO locked (Ushiba, Lucia, Okutomi, Terrence, Yamada)
    • Especially, make a noise budget for the ETMX MN drive
  • Think about the cause of the OpLev glitches (Okutomi)

Evening

  • Measure tilt TFs for the X-arm TR QPDs (TanakaK, Nakano)
  • Investigate the ALS stability by changing the REFL power (Nakano, Aso)
  • Try locking PRFPMI with reduced REFL power (Nakano, Aso)

Early Morning

  • Suspension Q measurements (Fujii)

Morning

  • Continue the suspension TF measurements with IFO (Ushiba, Lucia, Okutomi, Terrence, Yamada)

Today's work plan: 2019/10/8 4PM - 2019/10/9 1PM

Evening

  • Fix beam clipping using reflection of PRM. (Kokeyama, Eleonora)
  • Lock FPMI and noise hunting (Nakano)
  • VIS work (VIS team)
    • Implementing notch filters (Lucia)
    • Investigation of oplev glitch, oplev noise floor (Okutomi, Yamada)
  • To measure TF from TM MN motion to TMS using single arm (K.Tanaka, Nakano)

Oct 9, Morning

  • Setting polarizing power rotator at REFL port (Kokeyama, Eleonora)
  • VIS work (VIS team)
    • VIS work with Y arm (Fujii)
    • SR damping work (Fabian)
  • Moving 7 ion pumps work at ETMX (Mira-pro)

Today's work plan: 2019/10/8 4PM - 2019/10/9 1PM

Evening

  • Fix beam clipping using reflection of PRM. (Kokeyama, Eleonora)
  • Lock FPMI and noise hunting (Nakano)
  • VIS work (VIS team)
    • Implementing notch filters (Lucia)
    • Investigation of oplev glitch, oplev noise floor (Okutomi, Yamada)
  • To measure TF from TM MN motion to TMS using single arm (K.Tanaka, Nakano)

Oct 9, Morning

  • Setting polarizing power rotator at REFL port (Kokeyama, Eleonora)
  • VIS work (VIS team)
    • VIS work with Y arm (Fujii)
    • SR damping work (Fabian)
  • Moving 7 ion pumps work at ETMX (Mira-pro)


Standing issues 2019/10/8

VIS Task List

  • PEM - measured data sharing (Washimi, Yokozawa)
  • How to control the PSL temperature when people enters the room (Miyoki)
  • We need IFO commissioning strategy!!!
  • One arm WFS test
  • DRMI lock stability
    • 3f transition
    • Search for better Gouy phase in PRC
  • PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
  • VIS related
    • Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
    • United Guardian for all 4 suspensions (Okutomi)
    • Damping
    • Type A: Feed forward technic to suppress extra motion (Nakano)
    • Automation script for damping for calm down phase
    • PR2 & PRM oplev wind shield, PR3 LS oplev centering

    • Wind shield for PR2 and PRM (Enomoto)
  • For ASC things
    • Measure TF of VIS as ASC actuator (Okutomi)
  • Calibration for Oplevs at center area using IFO signal (Enomoto)
  • Fix clipping at IFI with IFO (Aso)
  • ETMY strong damping (Lucia, Ushiba)
  • Fix DAC comb noise problem (Miyakawa)
  • DAC non-linearity (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10699)

  • QPD diagonalization ETMX and ETMY, for remote work (Akutsu)
  • Establishing investigation method for diagonalization using ETMY only (all VIS power)
  • Fix oplev noise for ITMY
  • Fix oplev noise for ITMX
  • Fix oplev gain for ETMY (Akutsu)
  • Covering wind shield for oplevs of iMC (Akutsu, or somebody)
  • Investigation for noise of length oplev noise for ITMs (VIS + CRY)
  • PD dark noise investigation (Kozakai)


Today's work plan: 2019/10/7 1PM - 2019/10/8 4PM

After noon and Evening

  • Fix beam clipping for IMMT trans. (Kokeyama)
  • VIS work (VIS team)
    • ITMX is too shaky.
  • To measure TF from TM motion to TMS using single arm (K.Tanaka, Nakano)
  • SR2 test (Fabian)
  • Rebuild for all Type B model (Terrence)
  • Recovering FPMI locked by Guardian (Nakano, Ushiba)

Morning

  • Fix beam clipping using Green flash for X arm (Kokeyama, Eleonora)
  • VIS work (VIS team)
    • ETMX work from 3AM (Fujii)
    • SRMs work for restarting RT models(Fabian)
  • Moving 7 ion pumps to center area (Mira-pro)


Today's work plan: 2019/10/3 1PM - 2019/10/7 1PM

After noon and Evening

  • Recovering FPMI (Nakano, Ushiba)
    • Let's see all the peak again and start hunting them above 10Hz first.
  • 40Hz peak suppression without control (Okutomi, Lucia)
  • ASC work at AS port. It may needs real IFO beam but other laser diode can be used (Kokeyama, Miyoki)
  • VIS works for SRMs if AS port is not used. (Fabian)

Oct. 3

  • Ceremony
    • IFO test for ceremony (Nakano, Yamamoto)
  • ASC work with single arm (K.Tanaka)
  • VIS work (Fujii)
  • FPMI work(Nakano, Ushiba)

weekend

  • ASC work on Sunday (Kokeyama)
  • Line injection (Yamamoto, Ogaki)
  • PEM acoustic injection on Saturday or Sunday (Yokozawa)

Oct. 7

  • DGS maintenance for replacing SR2 PC (Oshino, Yamamoto, Miyakawa)
  • Power cable change on LSC rack (Tomura)
  • Fix beam clipping using PRM reflection (Kokeyama)
  • VIS work (VIS team)


Today's work plan: 2019/10/2 1PM - 2019/10/3 1PM

After noon and Evening

  • VIS works for SRMs (Fabian)
  • ND filter change (Nakano)
  • 40Hz peak suppression (Ushiba, Lucia)
  • Swapping AS WFS with restarting k1omc (Kokeyama)
  • Maintenance for cryo shield for ETMX and ITMX (Kimura)
  • FPMI lock from 4 or 5 pm and noise hunting starts (Nakano)

Oct. 3 Morning

  • VIS works (Fabian for SRMs, Lucia, Fujii)
  • air compresser (Kimura)
  • Gluiding OSTM dummy mirror (Takahashi)
  • Modification of MEDM for injection screen (Sawada)
  • Modification of camera script (Inoue)


Today's work plan: 2019/10/1 1PM - 2019/10/2 4PM

After noon and Evening

  • It's a good time to try FPMI.
  • VIS work with IFO.
    • 40Hz peak (Ushiba)
  • TMS work as ASC preparation (Tanaka)
  • Lock acquisition for PRFPMI (Nakano).
  • AS WFS work (Kokeyama, Miyoki, Miyakawa)

Oct. 2 daytime

  • Damping 40Hz peak with single arm lock (Okutomi, Ushiba)
  • ND filter change (Nakano)
  • VIS works (Fabian for SRMs, Lucia)
  • Maintenance for cryo shield for ETMX and ITMX (Kimura)
  • Magnet meter (Yokozawa, Tanaka)
  • Installation demos board etc. for AS WFS (Kokeyama, Miyoki)


Today's work plan: 2019/9/27 1PM - 2019/10/1 1PM

After noon and Evening

  • PRFPMI variable finesse lock (Nakano + others)
  • ITMX damping (Yamada)

Weekend

  • VIS work in the morning basically.
    • ITMX damping (Yamada)
    • ITMX and ETMX, maybe midnight (Fujii)
  • PRFPMI variable finesse lock (Nakano + others)
  • IMC ASC on Sunday morning (Kokeyama)

Sept. 30 morning

  • DGS maintenance: backup k1script, and k1nfs0 system disk
  • VIS work in the morning basically.

Oct. 1 morning

  • AS WFS work (Kokeyama)
  • VIS works
  • Magneto meter (Yokozawa, Tanaka)


Today's work plan: 2019/9/26 1PM - 2019/9/27 1PM

After noon and Evening

  • Discuss the OpLev and actuator diagonalization method (VIS + CRY + Nakano)

  • PRFPMI variable finesse lock (Nakano + others)
  • MC WFS calibration (Kokeyama)

Sept. 27(Wed.) morning

  • Request form Nakano-kun for ETMY (Ushiba)
    • Length photosensor will be used.
    • Damp for 20Hz~.
    • Fix DC conflict MN oplev using High/Low gain
  • ETMX damping (Fujii)
  • ITMX damping (Yamada)
  • Payload work (Lucia)
  • Type-A QPD and actuator diagonalization (VIS)
  • iMC WFS (Kokeyama)
  • Bug fix on perl cord for oplev (Yamamoto)


Today's work plan: 2019/9/25 1PM - 2019/9/26 1PM

After noon and Evening

  • Some measurement using X arm for finesse or something (Nakano, Jerome)
  • RT model modification for ETMY (Nakano)
  • Investigation of ETMY for glitch and hysteresis (Aso, Lucia, Fabian, Yamamoto)
  • Fix oplev noise at ITMY (Aso)
  • AS WFS (Kokeyama)
  • Works for OMC circuit (Somiya, Ogawa)

Sept. 26(Wed.) morning

  • MICH WFS (Kokeyama)
  • Diagnalization for VIS (all VIS team)

Today's work plan: 2019/9/24 4PM - 2019/9/25 1PM

Evening

  • Investigation of ETMY for glitch and hysteresis (Lucia, Terrence, Fabian, Okutomi, Nakano)
  • MC WFS work (Kokeyama)
  • Installation of the repaired LVDT driver for ITMY (Okutomi)
  • Installation of QPD driver for OMC (Somiya)

Sept. 25(Wed.) morning

  • AS WFS (Kokeyama)
  • Disassembling OMC suspension and test (Somiya, Ogawa, Kokeyama)
  • DAC investigation for 0.2Hz (Miyakawa, Aso, Yamamoto, Lucia Fabian)
  • VIS work for X arm (Fujii)


Today's work plan: 2019/9/20 4PM - 2019/9/24 4PM

Afternoon

  • Lock acquisition with some hierarchy models (Rana, Nakano, Aso)
  • Free swinging for ETMY (Rana)
  • CAL: restarting CAL model

Wweekend

  • Lock acquisition from afternoon (Nakano, Rana)
  • PEM vibration measurement in the center room in the morning.
  • PCAL: alignment work at ETMY (Darkhan, Ogaki)
  • Adding new memory to k1ctrXX on Monday (Oshino)

Sept. 24(Tue.) daytime

  • Investigation of ETMY for glitch and hysteresis (O)
  • Disassembling OMC suspension (Somiya, Aso, Koseyama)
  • Optical table cover around OMC chamber (Michimura)
  • PCal work for ETMX, ETMY remotely (Inoue)
  • SR2 sensor correction (Fabian)
  • Maintenance for PEM work (Yokozawa)
  • Jerome has a talk for optical parameters of aVIRGO at 3pm.


Today's work plan: 2019/9/19 4PM - 2019/9/20 4PM

Evening

  • BS L2P filter (Terrence, Lucia)
  • Long term stability test for matrix diagonalization for ETMY (Lucia, Jenne)
  • Try variable finesse locking for PRFPMI (Nakano, Rana, Jenne)

Sept. 20(Fri.) daytime

  • GIF feedforward test using X arm (Yokozawa, Miyo)
  • IFO lock acquisition or noise hunting (Nakano, Rana)
  • AS DAC noise problem: check the up-sampling filter in IOP (Miyakawa)
  • PCal work for ETMX, ETMY remotely (Inoue)


Today's work plan: 2019/9/18 4PM - 2019/9/19 4PM

Evening

  • Foil for QPD for PRM (Akutsu)
  • Matrix diagonalization for ETMY(Lucia, Jenne)
  • Opleve investigation and hierarchy control (Rana)
  • Try variable finesse locking for PRFPMI (Nakano, Rana, Jenne)
  • Xarm + GIF control in the morning if possible(Miyo, Yokozawa)

Sept. 19(Wed.) daytime

  • AS DAC noise problem: check the up-sampling filter in IOP (Rana, Yamamoto, Miyakawa)
  • Clean up portable accelerometer (Yokozawa)
  • PRM diagonalization (Shoda)
  • Diagonalization of oplev with ETMX(Lucia)
  • BS diagnalization (Terrence)
  • Some measurement for Type A (Fujii)
  • Damping work for ITMY and ETMY (Ushiba)
  • PCal work for ETMX, ETMY (Inoue)


Today's work plan: 2019/9/17 4PM - 2019/9/18 4PM

Evening

  • BS damping with the same strategy as PR3 (Rana)
  • Try variable finesse locking for PRFPMI (Nakano, Rana, Jenne)
  • Kick mirrors for OpLev diagonalization

  • Restart the k1ex0 (Inoue)

Sept. 18(Tue) daytime

  • Vertical sensor correction with ETMY&ITMX (Lucia)

  • OpLev diagonalization (Shoda ?)

  • ETMX damping (Fujii)
  • ITMY BP comb damping (Ushiba)
  • IMC pico to change the beam spot on MCo
  • AS DAC noise problem: check the up-sampling filter in IOP (Rana, Miyakawa)


Today's work plan: 2019/9/13 1PM - 2019/9/17 4PM

Afternoon + Evening

  • Update the T-cam script (Inoue)
  • Ondotori maintenance (Yamamoto)
  • IFO locking (Nakano, Jenne, Rana, Michimura)
    • Continue PRFPMI lock trial

Weekend

  • IFO work (Nakano, et al)
  • EPICS gateway maintenance (Yamamoto)
  • Calibration line injection (Inoue)

Sept. 17(Tue) morning

  • ETMX payload damping (Fujii)
  • PRM L-A decoupling (Shoda)
  • ITMX BF sensor correction (Lucia)
  • ETMY and ITMY BP comb damping (Ushiba)
  • IMC beam spot position check (Kokeyama, Terrence)

Today's work plan: 2019/9/12 4PM - 2019/9/13 1PM

Evening

  • IFO locking (Nakano, Jenne)
    • Continue PRFPMI lock trial

9/13(Fri.)

  • VIS time until 10:45AM
    • SR2 sensor correction (Fabian)
    • PRM L-A decoupling (Shoda)
    • ETMX BF sensor correction (Lucia)
    • ITMY BP comb damping (Yamada)
  • IFO time from 10:45AM
    • PRFPMI lock (Nakano, Jenne, Rana)

Today's work plan: 2019/9/11 1PM - 2019/9/12 1PM

Afternoon

  • ETMX BF sensor correction (Lucia)
  • ETMY BP Comb damping (Ushiba)
    • ETMY L-P, L-Y decoupling (Lucia)
  • ITMY BP comb damping (Yamada)
  • SR2 watchdog cable check (Fabian)
  • ASC: AS optical layout change (Kokeyama)

Evening

  • IFO locking (Nakano, Jenne)
    • Continue PRFPMI lock trial

9/12(Tue.) Morning

  • SR2 BIO cable investigation (Fabian) (until 1PM)
  • SR2 sensor correction (Fabian) (until 1PM)
  • PRM L-A decoupling (Shoda) (until 1PM)
  • AS table optical layout modification for ASC (Kokeyama) (from 1PM)
  • ETMX BF sensor correction (Lucia)
  • ETMY L-P, L-Y decoupling (Lucia)
  • ITMY BP comb damping (Yamada)

Today's work plan: 2019/9/10 1PM - 2019/9/11 1PM

Afternoon

  • SR2 sensor correction. Installation of the modified realtime code (Fabian) -> RT model installation done

  • ITMY sensor correction both IP and BF (Lucia) in progress
  • ETMX actuator balancing MN&IM (Ushiba) -> Done

  • ETMY actuator balancing MN&IM (Ushiba) -> Done

  • BP Comb tuning for ETMY (Ushiba) -> in progress

  • Driving matrix optimization (MN) for ITMX (Okutomi)
  • Installation of IIRrational, fitting tool (Jenne)
  • k1ex0 reboot (Inoue)

Evening

  • IFO locking (Nakano, Jenne, Stefan)
    • PRFPMI
    • Maybe subtract f1 signal from 3f ?

9/11(Tue.) Morning

  • ITMY sensor correction both IP and BF (Lucia)
  • All Type-A: implementing the vertical LVDT sensor correction (Miyo, Lucia)
  • ETMY BP Comb damping (Ushiba)
    • Once ETMY damping is done. LP decoupling for ETMs (Lucia, Jenne)
  • SR2 sensor correction (Fabian): Actual test.
  • Driving matrix optimization (MN) for ITMX (Okutomi)
  • Duct shield cryocooler repair (EX) (Kimura)
  • PEM injection test preparation (IYC) (Yokozawa)
  • ISS phase delay investigation (Yoshioka)
  • ASC work (Kokeyama, Terrence)
    • Restart SRM RTM
    • Activate the IFI STMs
    • Cabling at AS
    • AS table optical layout modification

Today's work plan: 2019/9/9 1PM - 2019/9/10 1PM

Afternoon

  • ISS (Yoshioka)
  • Type-B sensor correction PI (Fabian)
  • LP decoupling for ETMs (Lucia, Jenne)
  • ITMY sensor correction (Lucia, Jenne)
  • BS OpLev loop optimization (Shoda)

  • AS table optical layout optimization for ASC (Terrence)

Evening

  • IFO locking (Nakano, Jenne)
    • Measure CARM OPLG
    • SRFPMI lock with opposite CARM offset
    • Try DRMI again

9/10(Tue.) Morning

  • VIS strategy meeting from 10AM

Today's work plan: 2019/9/6 1PM - 2019/9/9 1PM

Afternoon

  • Cryopayload diagonalization (Yamada)
  • Balancing ETMX (Lucia)
  • REFL port arrangement (Kokeyama, Eleonora)
  • PCAL: exchanging whitening filter (Yamamoto, Tanaka)

Evening

  • Lock acquisition for SRFPMI (Nakano, Jenne)
  • Type A coupling measurement test using X arm (Okutomi)
  • Silent run after daily work done until morning

Weekend

  • Lock acquisition for SRFPMI (Nakano, Jenne)
  • PEM noise measurement with/without FFU in Sat. morning (Yokozawa, Washimi, Miyoki)
  • Calibration for Oplevs at center area using IFO signal (Enomoto)
  • Type A coupling measurement test using X arm (Okutomi)

9/9(Mon.) Morning

  • Type A coupling measurement test using X arm (Okutomi)
  • Balancing coil (Lucia)
  • Type A work (Fujii, Yamada)
  • Type B noise hunting for 16Hz and 17Hz with PEM results (Fabian)
  • MICH calibration (Ogaki, Yokozawa)
  • REFL tabe configuration (Kokeyama, Eleonora, Terrence)


Today's work plan: 2019/9/4 1PM - 2019/9/5 1PM

Afternoon

  • Type A work ETMX and ITMX (Fujii)
  • Type A work ETMY (Lucia)
  • Type B work for SRM (Fabian)
  • Payload damping ITMY (Yamada)
  • ISS work in the PSL in short time (Yoshioka, Ushiba)
  • Mine work for SRFPMI lock acquisition (Nakano, Ushiba, Yokozawa)
  • Investigation for alignment on Y end (Akutsu)
  • Ghost beam check (Kokeyama, Eleonora, Terrence, Akutsu)
  • ASC work with Xarm or Yarm (Okutommi)

Evening

  • Mine work for SRFPMI lock acquisition (Nakano, Ushiba, Yokozawa)
  • Investigation for alignment on Y end (Akutsu)
  • ASC work with Xarm or Yarm (Okutommi)
  • Silent run after daily work done until morning

Weekend

Morning

  • No VIS work Friday afternoon. IFO is used for lock acquisition or signal injection.
  • Type A test using X arm (Okutomi)
  • Impact test using hummer at center room(Washimi, Takana)
  • MICH calibration (Ogaki, Yokozawa)
  • ISS work (Ushiba)
  • PEM: measurement without IFO. (Yokozawa, etc.)
  • REFL tabe configuration (Kokeyama, Eleonora, Terrence)


Today's work plan: 2019/9/3 1PM - 2019/9/4 1PM

Afternoon

  • TMX investigation with X arm lock (Okutomi, Akutsu)
  • QPD centering at ETMX (Nakano, Tanaka)
  • Type A work ETMX and ITMX (Fujii)
  • Type A work ETMY (Lucia)
  • Payload damping ITMY (Yamada)
  • Type B work (Fabian)
  • Payload work for optical lever control in the central part (Shoda)
  • ISS work in the PSL(Yoshioka, Ushiba)
  • Bean profile measurement (Kokeyama, Eleonora)

Evening

  • IFO realignment and lock acquisition for SRFPMI (Nakano, Yokozawa, Okutomi, Ushiba)
    • Changing modulation frequency for f1 and f2.
  • TMSY IR QPD work. (Akutsu, Tanaka, Kokeyama)
  • Silent run after daily work done until morning

Weekend

Morning

  • Calibration of MI (Ogaki)
  • Type A work ETMX and ITMX (Fujii)
  • Type A work ETMY (Lucia)
  • Payload damping ITMY (Yamada)
  • PEM work around SR3 (Yokozawa)
  • ASC work (Kokeyama, Eleonora)


Today's work plan: 2019/9/2 1PM - 2019/9/3 1PM

Afternoon

  • Investigate 46Hz noise on Pitch of ITMX, and for damping ETMY (Okutomi, Fujii)
  • Payload damping ITMY (Yamada)
  • Type A sensor correction for EX and EY (Lucia, Fujii)
  • Type B work (Fabian)
  • Payload work for optical control in the central part, specially for SRs (Shoda)
  • AS table beam profile with PRM misaligned from 2-3pm (Kokeyama)
  • Measuring accelerometers 1:30-2pm (Fabian, Yokozawa)

Evening

  • IFO realignment and lock acquisition for SRFPMI (Nakano, Yokozawa, Okutomi, Ushiba)
  • Silent run after daily work done until morning
  • Beam profile at the end. (Akutsu)

Weekend

Morning

  • Modification BS calm down script when misaligned. (Fabian)
  • BS yaw > 100mHz. (Fabian)

  • Green fabler covering (Miyoki)
    • REFL table modification (Kokeyama, Eleonora, Terrence)
  • IFO is green from 10am.
  • Type A work ETMX and ITMX (Fujii)
  • Type A work ETMY (Lucia)
  • Type B work for SRM (Fabian)
  • Diagonalizaton of Oplev for SRM and SR2 (Fabian)
  • Payload damping ITMY (Yamada)
  • PEM measurement for SRM and PRM area (Yokozawa)


Today's work plan: 2019/8/30 1PM - 2019/9/2 1PM

Afternoon

  • Investigate 46Hz noise on ITMX (Okutomi)
  • Type A sensor correction for EX and EY (Lucia, Fujii)
  • Payload damping ITMY (Yamada)
  • Updating PEM model and needs DAQ restart (Washimi)

Evening

  • ITMX wrok for damping (Okutomi)
  • CAL measurement for SRC (Yamamoto)
  • IFO lock acquisition for SRFPMI (Nakano)
  • Silent run after daily work done until morning

Weekend

  • CAL measurement for SRC (Yamamoto)
  • Damping for Type A (Fujii, Lucia, Ushiba, Okutomi, Yamada)
  • Damping for Type B (Fabian)
  • IFO lock acquisition for SRFPMI (Nakano)
  • Silent run after daily work done until morning

Morning

  • Fixing k1gate (Yamamoto, Miyakawa)
  • Damping for Type A (Fujii, Lucia, Ushiba, Okutomi, Yamada)
  • DGS maintenance for k1fw0 (Yamamoto, Oshino)
  • Adding accelerometers (Fabian, Yokozawa)
  • Payload work for optical control in the central part, specially for SRs (Shoda)
  • Centering oplev for SR2 (Yokozawa, SR2)
  • REFL beam profile with PRM aligned (Kokeyama)


Today's work plan: 2019/8/29 1PM - 2019/8/30 1PM

Afternoon

  • Finesse measurement using X arm (Sotsuka)
  • ASC centering (Kokeyama, Washimi)
  • Investigate 46Hz noise on ITMX (Okutomi)
  • Updating for Type B model for Dolphin connection (Fabian)
  • Type A sensor correction (Lucia, Fujii)
  • Payload damping ITMY (Yamada)
  • Fix k1fw0 (Miyakawa, Oshino)
  • Covering oplev for PR2 and PRM (Akutsu)

Evening

  • IFO lock acquisition for SRMI (Nakano)
  • Silent run

Weekend

Morning

  • Damping for Type A (Fujii, Lucia, Ushiba, Okutomi, Yamada)
  • Damping for Type B (Fabian)
  • PEM measurement, and injection test (Yokozawa, Washimi)
  • Exchanging k1fw0 (Oshino, Miyakawa)
  • Noise measurement for ALS (Enomoto)


Today's work plan: 2019/8/28 1PM - 2019/8/29 1PM

Afternoon

  • Damping work for ITMX MN at 46Hz (Okutomi)
  • Type A work for ETMX (Lucia)
  • Damping PRM (Fujii)
  • Type A work feedforward or common mode rejection (Yamada, Lucia, Fujii)
  • Type B work (Fabian)
  • ISS work in the PSL (Yoshioka, Nakano)
  • Exchanging the 60inch monitor in the control room.
  • Fixing detchar tool (Alex)

Evening

  • Finesse measurement (Nakano, Sotsuka)
  • Measurement for ALS (Enomoto)
  • Check the SRM direction (Yokozawa)
  • Silent run

Weekend

Morning

  • Fix k1fw0 (Miyakawa, Oshino)
  • Damping for Type A (Fujii, Lucia, Ushiba, Okutomi, Yamada)
  • Damping for Type B (Fabian)
  • ASC centering (Kokeyama)


Today's work plan: 2019/8/27 1PM - 2019/8/28 1PM

Afternoon

  • ASC tutorial soon (Nakano)
  • Type A work for ITMX and ITMY (Okutomi, Yamada, Fujii, Lucia)
  • Some PRs work for oplev control loop (Shoda)
  • ISS work in the PSL (Yoshioka, Nakano)
  • Investigation for ASL glitch noise (Enomoto)
  • Length oplev centering (Enomoto)
  • Accelerometer work (Yokozawa, Washimi)
  • Interview in the mine (Miyakawa)

Evening

  • Finesse measurement (Nakano, Sotsuka)
  • IFO works with tuning FPMI lock from 5pm(Nakano, Enomoto)
  • Silent run

Weekend

Morning

  • Silent run for DET (Yokozawa)
  • Wind shield for PR2 and PRM (Akutsu)
  • Type A work for EX and EY (Fujii, Lucia, Ushiba, Okutomi, Yamada)
  • Damping for Type B (Fabian)

Today's work plan: 2019/8/26 1PM - 2019/8/27 1PM

Afternoon

  • ASC tutorial at 4pm (Nakano)
  • Exchanging coil driver (Yamada)
  • Type A work for EX and EY (Fujii, Lucia)
  • Damping for Type B (Fabian)
  • Some PRs work for oplev control loop until 3pm (Shoda)
  • Investigation for ASL glitch noise (Enomoto)
  • Finesse measurement from 3pm (Nakano, Sotsuka)

Evening

  • Interview at control room at 5pm (Miyakawa)
  • IFO works with tuning FPMI lock (Nakano, Enomoto, Michimura)
  • Silent run

Weekend

Morning

  • Silent run for DET (Yokozawa)
  • Type A work for EX and EY (Fujii, Lucia, Ushiba, Okutomi, Yamada)
  • Damping for Type B (Fabian)
  • Some PRs work for oplev control loop (Shoda)
  • ITMY and ETMX cryocooler work.


Today's work plan: 2019/8/21 1PM - 2019/8/26 1PM

Afternoon

  • Type A work for EX and EY (Fujii, Lucia)
  • Damping for Type B (Fabian)
  • Automation for finesse measurement (Sotsuka)

Evening

  • IFO works with tuning FPMI lock (Nakano, Enomoto, Michimura)

Weekend

  • IFO works with tuning FPMI lock (Nakano, Enomoto, Michimura)

8/26 Morning

  • Type A work for EX and EY (Fujii, Lucia, Ushiba, Okutomi, Yamada)
  • Damping for Type B (Fabian)
  • DGS Maintenance for replacing TW SSD (Miyakawa)
  • DGS Maintenance for fixing DAQ (Yamamoto, Oshino)
  • Exchanging 24V at LSC rack. (Kamiizumi, Shimode)
  • Preparation for replacing and arrangement for HPCD.(Aso, Yamada)
    • HPDC modification (Shimode)
  • Investigation for ASL glitch noise (Enomoto)
  • Cooling valve at IYC will be replaced (Kimura)


Today's work plan: 2019/8/20 1PM - 2019/8/21 1PM

Afternoon

  • Type A work for EX and EY (Fujii, Lucia)
  • Damping for Type B (Fabian)
  • Implementation of calm down state for ETMY (Ushiba, Okutomi)
  • Connecting BIO cable (Enomoto)
  • Some work for AS tube (Michimura)
  • Automation for finesse measurement (Sotsuka)
  • OMC check (Aso)
  • updating DAQ Gardian (Yamamoto)

Evening

  • updating DAQ Gardian (Yamamoto)
  • IFO works with tuning FPMI lock (Nakano, Enomoto, Michimura)
  • Leave IFO locked from night to morning (Nakano, Enomoto)

Weekend

Morning

  • IFO works with tuning FPMI lock (Nakano, Enomoto, Michimura)
  • Type A work for EX and EY (Fujii, Lucia, Ushiba, Okutomi, Yamada)
  • Damping for Type B (Fabian)


Today's work plan: 2019/8/19 1PM - 2019/8/20 1PM

Afternoon

  • Type A work for EX and EY (Fujii, Lucia, Ushiba, Okutomi)
  • Damping for Type B (Fabian)
  • Work for PLL for Fiber noise cancel (Enomoto)
  • Automation for finesse measurement (Sotsuka)
  • Updating spectrum tool (Kozakai)
  • Ondotori maintanance (Yokozawa)
  • Maintenance for k1dc0 to add memory (Oshino)

Evening

  • IFO works with tuning FPMI lock (Nakano, Enomoto)
  • Leave IFO locked from night to morning (Nakano, Enomoto)

Weekend

Morning

  • Type A work for EX and EY (Fujii, Lucia, Ushiba, Okutomi, Yamada)
    • Tuning IYC length oplev (Ushiba)
  • Connecting BIO cable (Enomoto)
  • Excahnging k1dc0


Today's work plan: 2019/8/16 1PM - 2019/8/19 1PM

Afternoon

  • Non linearity check TMY by searching a good position mechanically or check HPCD (Enomoto, Lucia, Nakano)
  • Hunting 150mHz on all Type B (Fabian)
  • Noise measurement Fiber noise cancel (Sugimoto)
  • OMC work (Kokeyama)
  • Type A work for EX and EY (Fujii, Lucia)
  • Automation for finesse measurement (Sotsuka)
  • Updating gif model (Miyo, Yamamoto)

Evening

  • IFO works with Yarm for FPMI (Nakano)
  • Leave IFO locked from night to morning (Nakano)

Weekend

  • Measuring sensing gain for green lock (Enomoto, Sugimoto, Kimura)
  • Automation for finesse measurement (Sotsuka)
  • IFO works with Yarm for FPMI (Nakano)
  • Leave IFO locked from night to morning (Nakano)
  • Stopping EPICS gateway on Sat. night or Sun. morning(Yamamoto)

Morning

  • DGS maintenance for exchanging k1dc0 and adding a BIO card to k1ioo1 or k1als1 (Yamamoto, Oshino)
  • Type A work (Fujii, Lucia)
  • Hunting 150mHz on all Type B (Fabian)


Today's work plan: 2019/8/15 1PM - 2019/8/16 1PM

Afternoon

  • PEM: Noise hunting 44Hz in the PSL room (Yokozawa)
  • Type A work for EX and EY (Fujii, Lucia)
  • IMC measurement (Guiguo)
  • Automation for finesse measurement (Sotsuka)

Evening

  • IFO works with Yarm for FPMI (Nakano)
  • Leave IFO locked from night to morning (Nakano)

Weekend

  • Fiber noise cancel, Enomoto, Sugimoto

Morning

  • Exchanging cryo valve unit at EX (Kimura, Yakahashi)
  • Type A work (Fujii, Lucia)
  • Non linearity check TMX (Enomoto, Lucia)
  • PEM: Noise measurement at both END (Yokozawa, Washimi)
  • RFM work at 500m in Xarm (Yamamoto, Miyo)
  • Noise measurement for fiber noise cancellation (Enomoto, Sugimono)
  • Hunting 150mHz on BS (Fabian)


Today's work plan: 2019/8/9 1PM - 2019/8/15 1PM

Afternoon

  • Hunting ITMY big morion (Lucia)
  • Type A work (Fujii, Lucia)
  • Work for fiber cancelation for replacing power supply to avoid magnetic field of small DC power supply (Enomoto, Sugimoto)
  • SR3 TF measurement (Fabian)
  • Restarting DAQ at 5pm (Yamamoto)
  • PEM: measure vibration noise of pump (Yokozawa, Kaihotsu)
  • PEM: measure fiber noise for ALS (Washimi)
  • CAL: AOM will be tested from control room for Y end (Inoue)
  • ISS work outside PSL (Yoshioka, Kuromiya, Nakano)
  • Covering for TMS at ETMX (Akutsu)

Evening

  • Finesse measurement (Nakano)
  • IFO works with Yarm for FPMI (Nakano)
  • Work for fiber cancelation (Enomoto, Sugimoto)
  • Leave IFO locked from night to morning (Nakano)

Weekend

  • IFO works with Yarm (Nakano)
  • Work for fiber cancelation (Enomoto, Sugimoto)

8/15 Morning

  • Type A work (Fujii, Lucia)
  • IMC measurement (Guiguo)


Today's work plan: 2019/8/8 1PM - 2019/8/9 1PM

Afternoon

  • Leak check at ITMY (Kimura)
  • Work for fiber cancelation (Enomoto, Sugimoto)
  • Measure TF of ITMY for top part by making health check list (Liucia)
  • Starting EY cry cooler (Kimura)
  • Put cover on TMSX at X end (Akutsu)
  • OSTM work (Takahashi)
  • CAL: Replacing AOM at ETMY, tuning camera at ETMY (Inoue)
  • SR3 TF measurement (Fabian)

Evening

  • Work for fiber cancelation (Enomoto, Sugimoto, Akutsu)
  • Some IFO work with Yarm (Nakano)
  • Leave IFO locked (Nakano)

Weekend

Morning

  • Stop ETMX cryo cooler (Kimura)
  • SR3 TF measurement (Fabian)
  • X fiber noise for temp. control (Enomoto, Sugimoto)
  • Type A work (Fujii, Lucia)
  • ISS servo in the PLS morning (Yoshioka)


Today's work plan: 2019/8/7 1PM - 2019/8/8 1PM

Afternoon

  • Lock fiber cancelation, entering PSL and turning off filters (Enomoto, Sugimoto)
  • ISS work outside of PSL (Yoshioka, Nakano)
  • SR3 noise investigation (Fabian)
  • Measure TF of ITMY for top part by making health check list (Liucia)
  • OSTM work (Takahashi)
  • Exchanging IX oplev source (Akutsu)

Evening

  • One arm WFS test with X arm(Nakano)
  • Leave IFO locked (Nakano)

Weekend

Morning

  • X fiber noise control or temperate control for Y (Enomoto, Sugimoto)
  • SR2, 3 noise investigation (Fabian)
  • OSTM work (Takahashi)
  • Type A work (Fujii, Lucia)


Today's work plan: 2019/8/6 1PM - 2019/8/7 1PM

Afternoon

  • Opening GV for ITMX (VAC)
  • ITMX oplev work before Finesse measurement (Yamada)
  • Finesse measurement for Xarm (Nakano)
  • Measure TF of ITMY for top and cryopayload by making health check list (Okutomi, Yamada)
  • OSTM work (Takahashi)
  • WFS centering at REFL (Nakano)
  • HDD installation for CAL PC (Darkhan)
  • Exchanging PC for VAC mon (Yokozawa)

Evening

  • One arm WFS test with X arm(Nakano)
  • Leave IFO locked (Nakano)

Weekend

Morning

  • Exchanging k1dc0 in early morning 8am (Yamamoto, Oshino)
  • Fiber cancelation work (Enomoto, Sugimoto)
  • ISS work in the PSL (Yoshioka)
  • SR2, 3 noise investigation (Fabian)
  • OSTM work (Takahashi)
  • Type A work (Fujii, Lucia)


Standing issues 2019/8/5

  • Sensitivity monitor for various DoF (CAL)
  • PEM - measured data sharing (Washimi, Yokozawa)
  • How to control the PSL temperature when people enters the room (Miyoki)
  • We need IFO commissioning strategy!!!
  • One arm WFS test
  • DRMI lock stability
    • 3f transition
    • Search for better Gouy phase in PRC
  • PRFRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
  • Arm: transition
    • Y-arm lock
  • Try ALS mass lock with FFUs and ACs turned off
  • Type-A related
    • Fast shut off feature on type-A after lockloss not to ring (real time model change, Stefan)
    • Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
    • United Guardian for all 4 suspensions (Okutomi)
    • Damping
    • Exchanging modified HPCD.
    • Type A: Feed forward technic to suppress extra motion (Nakano)

Meeting archive


Today's work plan: 2019/8/5 1PM - 2019/8/6 1PM

Afternoon

  • Damping monitor (Okutomi, Lucia)
  • Finesse measurement for Xarm. (Nakano)
  • Damping work for Type A. (Fujii)
  • SR2, 3 noise investigation (Fabian)
  • Entering cleaning area for taking pictures (with Yokozawa)
  • Cabling ALS fiber noise cancellation (Enomonoto, Miyoki)
  • OSTM work for OSEM inve(Takahashi)

Evening

  • One arm WFS test (Nakano)

Weekend

Morning

  • Fix vacuum monitor (Yokozawa)
  • Increasing ITMX temperature (CRY)
  • Entering cleaning area for taking pictures (with Kokeyama)
  • SR2, 3 noise investigation (Fabian)
  • Installation circuit to ITMY, and control test (Yamada)
  • OSTM work (Takahashi)
  • Fixing k1IOO1 (Yamamoto)
  • IXV work (Fujii)


Today's work plan: 2019/8/1 1PM - 2019/8/2 1PM

Afternoon

  • GV opened last night
  • ITMY release ongoing (CRY, VIS)
  • After releasing, ITMY alignment using MICH (Nakano, CRY, VIS)
  • Fabian will investigate the difference between FLOAT and ALIGNED (Fabian)
  • Finesse re-measurement (Nakano) - We might want to warm up IY. To be discussed. Maybe if 70-80K doesn't recover the finesse.
  • Type-A common guardian
  • Oplev swap for IMMT2
  • Oplev swap for PR2 if possible with IFO

Evening

  • Finesse measurement
  • Arm transition method commissioning

Morning

  • Continued SRs study (Fabian)
  • IY final checks (earthquake stops etc) and cleaning (Aso, Ushiba)

We want a sensitivity monitor!

We want to plan Feedforward on typeA!

We want to decide the Commissioning strategy!

Note

  • IY chamber will be closed on Saturday


Today's work plan: 2019/8/2 1PM - 2019/8/5 1PM

Afternoon

  • ITMY problem investigation (CRY&VIS)

  • Finesse measurement (Nakano)
  • X-arm transition (Nakano)
  • ISS (Yoshioka)
  • ITMX Type-A control (VGAS oscillation) (Lucia)
  • PEM measurements around IFO REFL (Yokozawa)
  • ALS fiber noise cancellation (Enomonoto)

Weekend

  • Fiber noise cancellation
    • Turn off FFU, ACs

8/5 Morning

  • ITMY pumping (VIS, CRY)
  • SR2, 3 noise investigation (Fabian)
  • DGS maintenance (Yamamomot, Oshio, Miyakawa)
    • dc0 replacement
    • Add BIO to k1ioo1
  • Installation of circuit to ALS (Enomoto)


Today's work plan: 2019/8/1 1PM - 2019/8/2 1PM

Afternoon

  • GV opened last night
  • ITMY release ongoing (CRY, VIS)
  • After releasing, ITMY alignment using MICH (Nakano, CRY, VIS)
  • Fabian will investigate the difference between FLOAT and ALIGNED (Fabian)
  • Finesse re-measurement (Nakano) - We might want to warm up IY. To be discussed. Maybe if 70-80K doesn't recover the finesse.
  • Type-A common guardian
  • Oplev swap for IMMT2
  • Oplev swap for PR2 if possible with IFO

Evening

  • Finesse measurement
  • Arm transition method commissioning

Morning

  • Continued SRs study (Fabian)
  • IY final checks (earthquake stops etc) and cleaning (Aso, Ushiba)

We want a sensitivity monitor!

We want to plan Feedforward on typeA!

We want to decide the Commissioning strategy!

Note

  • IY chamber will be closed on Saturday


Today's work plan: 2019/7/31 1PM - 2019/8/1 1PM

Commissioning leader: Miyakawa (July 29-30), Aso (August 1-3)

Afternoon

  • ITMY: BF work. (Okutomi, Sato, Fujii)
  • ITMY: H1 actuator investigation. (Ushiba, Yamada)
  • PEM: Reporting Temperature. (Yokozawa)
  • VAC, MIF: Opning GV, alingment. (Saito, Nakano, Michimura, Akutsu)
  • ASO: Small works at ETMX (Akutsu)
  • Replacing light source for IMMT2. (Akutsu)
  • Type B: Back to aligned mode. (Fabian)
  • DET: replacing OS of DET computer for offline analysis. (T.Yamamoto)
  • CAL: Xend Tcam will be touched. (Inoue)

Evening

  • IFO some work. (Nakano, Michimura, Akutsu)
  • VIS work can be done for Y arm work since Y arm is not available for a while. (Fujii, Okutomi)

Weekend

Morning

  • Releasing ITMY suspension. (Ushiba)
  • PSL work for grounding problem. (Nakano)
  • Maintenance for Ondotori at X-end (T.Yamamoto)


Today's work plan: 2019/7/30 1PM - 2019/7/31 1PM

Commissioning leader: Miyakawa (July 29-30), Aso (August 1-3)

Afternoon

  • Fix ITYM F0 motor and to check BF. (Okutomi, Sato, Fujii)
  • Check H1 actuator. (Ushiba, Tomaru, Yamada)
  • ALS: Tuning returning beam at center area, and in PSL room shortly. (Enomoto, Sugimoto)
  • Connecting tube on the AS table. (Michimura)
  • ISS: work for servo in the PSL for 30min. (Yoshioka, Nakano)
  • AOS: Some small works in the center room for oplev. (Akutsu)
  • PEM: test a new sensor at IY0 rack. (Yokozawa, Washimi)
  • BS: measurement of noise. (Fabian)

Evening

  • IFO some work. (Nakano, Michimura, Akutsu)

Weekend

Morning

  • DGS maintenance for exchanging k1dc0, adding BIO cards to k1ioo1 for ALS control (Yamamoto, Oshino)
    • VIS should go safe mode. (Fabian)
    • DC power source will be exchanged at ALS0 and ALS1 rack. (Kamiizumi)
  • Fix ITYM F0 motor and to check BF. (Okutomi, Sato, Fujii)
  • Connecting tube on the AS table. (Michimura)
  • AOS: Some small works at Y end for oplev. (Akutsu)
  • PEM: work around IYC chamber. (Yokozawa, Washimi)


Today's work plan: 2019/7/26 1PM - 2019/7/30 1PM

Commissioning leader: Miyakawa (July 29-30), Aso (August 1-3)

Afternoon

  • Monitor for venting ITMY (Okutomi)
    • Updating RT model for Type A, except for ITMY (Okutomi)
  • ASC test on ITMX (Ushiba)
  • ETMX work (Fujii)
  • SR3 work for control loop IM yaw (Fabian)
  • OMC characterization with control (Kokeyama, Somiya)
  • Fiber noise cancellation at control room(Enomoto, Sugimoto)
  • ISS put wind shield outside PSL (Yoshioka, Kukromiya)
  • Pick up Moku:Lab (Guiguo)

  • Stop venting around the evening (Ushiba)
  • Checking cable noise for PEM (T.Takana)
  • PEM: Vibration measurement at IXC (Yokozawa)
  • Measurement for PRs (Shoda)

Evening

  • Fiber noise cancellation (Enomoto)

Weekend

  • Fiber noise cancellation work at PSL on Saturday and Sunday(Enomoto, Sugimoto)
    • Changing optics for Yarm.
  • Venting again on Sunday morning (Ushiba)
    • Monitor for venting ITMY (Okutomi)
  • ETMX work on Saturday and Sunday(Fujii)

Monday Morning

  • SRs TF measurement, off load (Fabian)

Monday Aftenoon

  • SRs TF measurement, off load (Fabian)

Monday Evening


Today's work plan: 2019/7/25 1PM - 2019/7/26 1PM

Commissioning leader: Miyakawa (22nd-26th)

Afternoon

  • Fixing ITMY stuck (Okutomi)
  • ASC test on ITMX (Ushiba)
  • ETMX work (Fujii)
  • SR3 work for control loop IM yaw (Terrence)
  • Cabling for BIO this afternoon (Enomoto)
  • Xarm ALS hand over to IR using TR (Enomoto)
  • OMC characterization with control (Kokeyama, Darkhan)

Evening

  • Xarm ALS hand over to IR using TR (Enomoto)

Weekend

Morning

  • ITMY damping (Okutomi)
  • Type A work (Fujii)
  • ITMX damping (Ushiba)
  • Cryo cooler valve exchange (Kimura, Ushiba)
  • SR3 TF measurement (Fabian)
  • Automation for SR3 and SRM (Shoda)
  • Noise source by cable or something in the center room (Yokozawa)
  • Setting magnet meter at Y end (Yokozawa)


Today's work plan: 2019/7/24 1PM - 2019/7/25 1PM

Commissioning leader: Miyakawa (22nd-26th)

Afternoon

  • Replacing LVDT driver on SR3(Fabian)
  • Single arm locking (Nakano)
  • Fix AC to stablize temeparute (Miyoki)
  • ITMY damping (Okutomi)
  • Maintenance for Ondotori (Yokozawa, T. Tanaka)
  • ALS model medication (Enomoto, Sugimoto)
  • MZ in PSL room for a hour (Guiguo)
  • OMC characterization with control (Kokeyama, Darkhan)

Evening

  • ALS hand over to IR using TR (Nakano, Enomoto)
  • DRFPMI lock (Nakano, Enomoto)

Weekend

Morning

  • ITMY damping (Okutomi)
  • Type A work (Fujii)
  • SR3 OSEM check (Fabian, Terrence)
  • Automation for Suspensions except for SR3 (Shoda)


Standing issues

  • Try FPPRMI: with stable 3f signals and ALS extra range, FPPRMI may fix the glitches?
  • Fast shut off feature on type-A after lockloss not to ring (real time model change, Stefan)
  • Y-arm lock
    • ETMY suspension control
    • ITMY damping
      • One IM magnet is broken. Need a different strategy. Use MN ? (Yamada, Okutomi)
  • DRMI lock stability
    • Model HOM-PHD signal distortion (Aso, Kokeyama)
    • Search for better Gouy phase in PRC
  • Initial alignment automation (Nakano)
  • IFO configuration Guardian (Kokeyama)
  • SDF for all the VIS (Shoda, Okutomi)
  • Type-A related
    • Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
    • United Guardian for all 4 suspensions (Okutomi)
    • Damping
    • Exchanging modified HPCD.
    • Type A: Feed forward technic to suppress extra motion (Nakano)
  • Type-B related
    • SR3 Yaw motion is too large (Fabian, Terrence)
  • Type-C related
    • OSEM characterization for OSTM (on going, Takahashi)
  • OMC
    • Check the OMC on the AS table
    • OMC characterization with control
  • Laser safety
    • Debug the laser safety guardian (Nakano)
  • IR QPD, centering on IR , green QPD at ETMY (Akutsu)
  • AS tube installation on 7/30-31 (Michimura)
  • Valve unit exchange for ITMX on 7/26 for 1-2 hours (Kimura)
  • Fiber noise cancellation on Saturday (Enomoto, Sugimoto)


Today's work plan: 2019/7/23 1PM - 2019/7/24 1PM

Commissioning leader: Miyakawa (22nd-26th)

Afternoon

  • PEM: 320.5Hz noise (Yokozawa)
  • Preparation for fiber noise cancellation (Enomoto, Sugimoto)
    • This turns on air filters.
  • OMC control (Kokeyama, Darkhan)
  • ALS hand over to IR(Stefan, Valera, Nakano)

Evening

  • ALS hand over to IR (Stefan, Valera, Nakano)
  • DRFPMI lock (Stefan, Valera, Nakano)

Weekend

Morning (Monday)

  • ITMY damping (Okutomi)
  • Type A work (Fujii)
  • SR3 OSEM check (Fabian)
    • DGS maintenance for prm or srm.
  • Adding BIO card to k1als0, k1ioo1.
  • Exchanging old type modified HPCD. (Ushiba, Takahashi)
  • ISS control servo (Yoshioka, Kokeyama)


Today's work plan: 2019/7/22 1PM - 2019/7/23 1PM

Commissioning leader: Miyakawa (22nd-26th)

Afternoon

  • Exchanging HPCD(Fabian, Washimini)
    • check the range of new HPCD using oplev (Valera, Nakano).
  • ITMY damping (Okutomi)
  • ALS sweep to find IR resonance (MN, VF)
    • TEMP00 lock with dither(Nakano).

Evening

  • ALS sweep to find IR resonance (MN, VF)
  • DRMI lock (Stefan)

Weekend

Morning (Monday)

  • ITMY damping (Okutomi)
  • SR3 OSEM check (Fabian)
  • Type A: Feed forward technic to suppress extra motion (Nakano)


Today's work plan: 2019/7/19 1PM - 2019/7/22 1PM

Commissioning leader: Aso (19th), Miyakawa (22nd)

Afternoon

  • ALS sweep to find IR resonance (MN, VF)
  • Start X-End cryocooler (Yamada, TakahashiM)
  • Implement BF stage control on ALIGNED state on type-A guardian (Kokeyama)
  • ISS servo setup and OLTF measurement (Yoshioka, Kuromiya, Yamamoto)
  • Serial number check of OpLev SLDs (Yamada)

Evening

  • ALS sweep to find IR resonance (MN, VF)

Weekend

  • IFO configuration guardian (Kokeyama, Saturday)
  • Modification of the IMC servo (Enomoto, Sunday)
  • Transition to IR (Nakano, Valera, Sat & Sun)

  • TF measurement of Type-A (Yamada, Saturday morning)
  • ITM actuator efficiency measurement (Sun morning ?)

Morning (Monday)

  • SR3 OSEM check (Fabian)


Today's work plan: 2019/7/17 1PM - 2019/7/18 1PM

Commissioning leader: Aso (July 17th-19th)

Afternoon

  • ETMY HP coil driver check (Takahashi, Yamada)
    • Watchdog, Output resistance, Cable resistance, Take a picture of the PCB
  • Check the maximum current acceptable by the in-vac cable.
    • Calculate theoretical limit (Ushiba)
  • AS alignment (Kokeyama et al)
  • SR3 OSEM check (Fabian, Terrence)
  • Y-arm mass lock trial (SB, EY, MN, et al)
  • ISS work (Yoshioka, Nakano)

Evening

  • Y-arm mass lock trial (SB, EY, MN, et al)
  • Type-A guardian work on ETMX (Kokeyama)
  • DRMI investigation ? (SB, EY, MN, et al)
  • Found Y end coil needed more range, more drive for MN (dominate 10Hz sensing noise limited, cross over)

Note

  • DC feedback works perfect
  • Tcam alignment system is done (see from camera screen)
  • ALIGNED guardian on ETMX (test phase)

Morning

  • HP coil driver modification ? (Yamada, Fabian, Terrence)


KAGRA/Commissioning/DailyMeetingArchive (last edited 2019-11-19 09:15:27 by OsamuMiyakawa)