2017/2/14(Wed.)

  • Remote participants by eZuce: None
    • Enonomoto-kun started joining to commissioning. No one has to hesitate to join commissioning work!
  • Report of work (*:responsible person)
    • ETMY: *Enomomoto
      • Calibration at cryopayload was performed.
    • Cryo: mirror temperature: 220K.
    • Green reached ETMY
      • PR2 had 500urad misalignment.
  • Work plan (*:responsible person)
    • ETMY: Enomomoto, Izumi
      • Returning IR light will be checked around BS.
      • Leveler wil be removed in the more
    • Green reached ETMY
      • PR2 had 500urad misalignment.
  • Laser hazard: IMM in the morning, SR2-3 in the afternoon.
  • Weekly
    • Week of 2/13
      • Waiting for cooling the mirror.
      • ETMY tuninng.
      • 2/16 Preparation for power down.
    • Week of 2/19
      • 2/19 Recovering for power down.
      • ETMY tuninng.
    • Week of 2/26
      • Beam alignment to REFL port.
  • Issues
    • AOS: Temperature inside clean booth is higher than outside area. One of the view port mirror brought from ITMY area into clean booth was dewed.
    • DGS: k1boot was cleaned up. No filter can be updated yesterday because of a missing file. If there is something wrong, please let DGS group know.